~9 tete building better future mandar jayant lele Ref No- ML/2025-26/101 Date- 14.10.2025 Annexure-A FORM-1 CONSULTING ENGINEER'S CERTIFICATE To, The M/s. Nirmiti Builders & Developers Through Its Partner. Mr. Vishal Vijay Patil Add :- 209, Konark Arcade, Beside BNCMC Head , opp. Tahsildar Office, Tai- Bhiwandi, Dist.-Thane. Subject : Certificate of Percentage (Upto 30th Sep 2025) of Completion of Construction Work of Residential/Commercial (Stilt/GR + 4 Floor) Project Name SURAJ ORCHID Land bearing on Surve. No. 115/6/116/3/A/ Plot No.3, Mouje Asangaon, Taluka Shahapur, District Thane. having Maha RERA Registration Number P51700055323 being developed by M/s. Nirmiti Builders & Developers Respected Sir, I Mr. Mandar Jayant Lele have undertaken assignment as Consulting Engineer of certifying Percentage of Completion of Construction Work of SURAJ ORCHID having Maha RERA Registration Number P51700055323 being developed by M/s. Nirmiti Builders & Developers, Based on Site Inspection, with respect to Layout/ each of the Building/Wing of the aforesaid Real Estate Project. I certify this certificate upto 30th Sep 2025 (i.e. ist July 2025 to 30th Sep 2025), the Percentage of Work done for each of the building/Wing of the Real Estate Project under Maha RERA is as per Table A herein below. The percentage of the work executed with respect to each of the activity of the entire phase is detailed in Table B. TABLE-A Building Name called SURAJ ORCHID Sr.No Tasks/ Activity Percentage of Actual Work Done (Upto 30th Sep 2025) 1 Excavation 100% 2 Basements (if any) -NA- 3 Podiums (if any) -NA- 4 Plinth 100% 5 Stilt Floor 100% 6 Slab of Super Structure -- - ,:,&' --.,..,, 100% ~,~~ --~ \"(t l*~--u• ~~h;=-~•~' -.......;.:_6\..l'lf''/ - Office No. 209 & 210, 2nd Floor, Konark Arcade, Next to B N C Municipal Corporation, Opp. Tahsildar Office, Bhlwandi, Dist.- Thane - 421308 +91 2522 238100 I info@lelegroup.org 7 Outer Wall, Internal walls, Internal Plaster, Floorings, Doors 100% and windows within Flats/Premises. 8 Sanitary Fitting within the Flat/Premises 100% 9 Staircases. Lifts Wells and Lobbies at each Floor level 100% Overhead and Underground Water Tanks 10 External plumbing and external plaster, elevation, 100% completion of terraces with waterproofing of the Building/Wing. 11 Installation of Lifts, water pumps, Fire Fighting Fittings and 100% Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions of environment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing. Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. Any other activities. TABLE-8 Common Areas (Internal and External Developments Works) In respect of the Registered Phase/ Project Number Sr.No Common Areas and Facilities Proposed Percentage Details (Yes/ of Actual No) Work Done (Upto 30th Sep 2025) 1 Internal Roads & Footpaths No -NA- 2 Water Supply Yes 100% 3 Sewerage (Chamber, lines, Septic Tank, Yes 100% STP). 4 Storm Water Drains Yes 100% 5 Landscaping & Tree Planting Yes 100% 6 Street Lighting No -NA- 7 Community Buildings No -NA- 8 Treatment and disposal of sewage and No -NA- sullage water. 9 Solid Waste management & Disposal No -NA- 10 Water conservation/Rain water Yes 100°~0 ~f>t JB,Ya~ harvesting .st~%~~ I~~-= i :7 I !1 ~~ i "IIJgCM\~~ - 11 Energy management Yes 100% 12 Fire protection and fire safety No -NA- requirements 13 Electrical meter room, sub-station, Yes 100% receiving station. 14 Others (Option to Add more). No -NA- Yours Faithfully ✓ . ~ MANDARJAYANTLELEt Consulting CMI Engineer Llc.No.STATE/R/2025/APL/16054 For Nirmiti Builders & Developert Agreed and Accepted By: M/s. Nirmiti Builders & Developers Through Its Partner. Mr. Vishal Vijay Patil