-- SAMARTHY A ENGINEERS JITENDRA S. PATEL B.E.Civil P'ORII 1 Date: _ _ _ _ _ _ _ __ (see Regulation 3) AJlCHlTBCT'S C&RTIFICATB (To be submitted at the time of Registration of Ongoing Project and for withdrawal of Money from Designated Account) : To K/8. ATREB RBALTORS THROUGH rr8 P.ARTIISR : 8brl KafJu B. llbuJlu PLOT NO.l, S. NO. 73, H. NO. 4, Near Shreeji Nisarg, YERANJAD, BADLAPUR- (W), PIN. • 421503 a..ject : Certificate of Percentage of Completion of Construction Work of 1 Ro. of Blaildinp. which is shown on sanctioned plan as "B1llldhl& :r of the 2"11 , , . _ forming a part of Project Named as •KJU81D1A DBAll·:I• hsving MahaRERA Registration Number- l7et to be repatendl being developed by -...,a. ATRD RSALTORS". SJr, I 8. PATEL (BAIIARTIIYA UOIIIBBRB) have undertaken assignment as Licenaed Engineer of certifying Percentage of Completion of Construction Work of the •JQHJQIJH OBAll-2, BLDG. having MahaRERA Registration Number- C,.t to lie being developed by "K/8. ATRD RBALTORS". Based on Site Inspection, with respect to Layeat/ each of the Building/Wing of the aforesaid Real Eatate Project. I certify that as on the date of this certificate, the Percentage of Work done for each of the building/Wing of the Real Estate Project as under MahaRERA is as per Table A herein below. The percentage of the work executed with respect to each of the activity of the entire phase is detailed in Table 8. Table -A Layout/ Building /Wing Number (to be prepared separately for each Layout/ Building /Wing of the Project) {KRISHNA DBAM-2, Building No.- 2} Percentage of Sr. Actual Work No. Task/Activity Done (As On Date of the Certificate) (1) (2) (3) 1 Excavation 0 2 One Plinth / Stilt 0 3 08 Number of Slabs of Super Structure 0 Internal Walls, Internal plaster, external walls, external 4 plaster 0 5 Flooring, Doors & Windows within Flats / Premises 0 6 Sanitary Fittings within the Flat/Premises 0 Staircases, Lifts Wells and Lobbies at each Floor level, 7 0 Overhead and Underground Water Tanks The External plumbing and elevation, completion of 8 0 terraces with waterproofing of the Building/Wing Installation of lifts, water pumps, fire Fighting and Equipment as per CFO, NOC, Electrical fittings mechanical equipment / CRZ NOC, finishing to entrance lobby/ s, plinth protection, paving of areas 9 0 appurtenant to building/wing, compound wall and all other requirements as may be required to complete project as per specification in agreement of Sale. Any other activities. 5AMARTHYA SAMARTHYA ENGINEERS -, JITENDRA S. PATEL B.E.Civil TABLE-B Common Areas (Internal & External Development Workla):io Respect af the Registered Phase/ Project Number Percentage of Sr. Proposed Actual Work done No. Common Areas and Facilities Details (Yes/No) (As On Date of the Certificate) (1) (2) (3) (4) (5) 1 Internal Roads & Footpaths NO - N.A. TOBE 2 Water Supply YES 0 PROVIDED BY M.J.P. 3 Sewerage (chamber Lines, Septic Tank,STP) YES 0 4 Storm Water Drains NO 0 5 Tree Planting YES 0 6 Street Lighting NO - N.A. Soc. Office, Community Hall, 7 YES 0 Driver's Room Treatment and disposal of sewage 8 NO 0 and Sullage Water Solid Waste Management and 9 YES 0 Disposal RAIN WATER Water Conservation, Rain Water 10 YES 0 HARVESTING harvesting PROPOSED. 11 Energy management NO - N.A. Fire Protection and Fire safety N.A. 12 NO - requirements Meter Room, Electrical·Meter Room, 13 YES 0 Transformer Transformer Proposed Aggregate Area of Recreational N.A. - N.A. 14 Open Space Specify if any further facility is 15 provided (other than above - - - mentioned) Yours Faithfully SAMARTHYA ENGINEERB Agreed and Accepted by JITENDRA S. PATEL (B.E.CIVI~) STATE/R/2022/APU020® I Signature of Promoter M/S M/S. ATREE REALTORS Name:- Date: