Annexure B FORM 2 (See Regulation 3) ENGINEER'S CERTIFICATE (To be submitted at the time of Registration of Ongoing Project and for withdrawal of Money from Designated Account- Project Wise) Date-30-09-2024 To, Gurumukhsingt G. Panjwani &Others S.No.-178(P),Sheet No.-78,57 Mouje-Shahad, Ulhasnagar-1 Ref.: - UMC/ TPD/BP /107 /22/488, dated 20/12/2022 Subject: Certificate of Cost Incurred for Development of Project Golden City situated on the Plot bearing S.No.-178(P), Sheet No.-78,57, Mouje-Shahad, Ulhasnagar-1 having (Maha RERA Registration Number P51700055313 being developed by Gurumukhsingh G. Panjwani Sir, I/We SHIVANI SSATALE have undertaken assignment of certifying Estimated Cost for the subject Real estate project proposed to be reisteredunder MahaRera,For construction of Golden City Wing A/A1, B/B1 being Residential Buildings/ Comm. Building situated on the plot bearing S.No.-178(P), Sheet No.-78,57, Mouje Shahad, Ulhasnagar-1. admeasuring 3900 SQ, M. Area being developed by Gurumukhsingh G. Panjwani .2.We have estimated the cost of Civil, MEP and allied works required for completion of the apartments and proportionatecompletion of internal &external works of the project as per specifications mentioned in agreement of sale.Our estimated cost calculations are based on the drawings/plans made available to us for the project under reference by the Developer / Consultants. The Schedule of items and quantity required for the entire work as calculated by M/s Suyog Associates_Quantity Surveyor* appointed by Developer/Engineer. The assumption of the cost of material. Labour and other inputs made by developer. And the site inspection carried out by us to ascertain / confirm the above analysis given to us. 3. We estimate Total Estimated Cost of completion of the aforesaid project under reference at Rs 35.61.56,700/- (Total of Table Aand B)at the time of Registration. The estimated Total Cost of project is with reference tothe Civil, MEP and Allied works required for completion of the apartments and proportionate completion of internal & external works, as per specifications mentioned in agreement of sale and for the purpose ofobtaining occupation certificate / completion certificate for the Building(s) / Wings(s) / Layout / Piotted Development from the Uihasnagar Municipal Corporation being the Planning Authority under whose jurisdiction the aforesaid project is being implemented arnount calculated at Rs 5,75,00,000/- Total of Table Aand B). The 4 The Estimated Cost Incurred till date is / services used and unit cost of these basis of input materials Incurred is calculated on the of EstimatedCost the apartments and and Allied works for completion of sale. items. of Completion of theCivil, MEP mentioned in agreement of 5. The Balance Cost as per specifications completion of internal & externalworks, proportionate internal & is estimated at Rs 29,86, 56,700/ the apartments and proportionate of the Project and allied work for project as completed on cetify that the Cost of the Civil, MEP agreement of sale, of the aforesaid 6. I specifications mentioned in external works, as per Table A and B below. of this certificate is as given in the date TABLE A A/A1,B/B1 (Stilt + 10th floor) Golden City Wing Amount (In Rs.) Particulars Rs 34,86,56,700/ Sr. No. Building/Wing/Layout/ of the Total Estimated Cost of Registration is RS 5,75,00,000/ Development as on 20-01-2024 1. Plotted 30-09-2024 certificate on date of Cost incurred as 2 (as Percentage of the estimated Work done in Percentage RS 29,86,56,700/ 3 cost) Cost) Incurred** (Based on Estimated Rs. NILI Balance Cost to be included in 4. Additional/Extra Items not Cost Incurred on Cost (Table-C) 5 the Estimated TABLE B Registered Phase Respect of the Development Works in Internal & External Amount (In Rs.) Particulars Rs.75,00,000 / Sr. No. External Internal and Cost of the in 1 Total Estimated including amenities and Facilities Development Works Registration Rs. as on 20-01-2024 of the layout 20-01-2024 certificate ondate of % 2. Cost incurred as of the Percentage (as Percentage 3. Work done in Rs.75,00,000/ estimated cost) Estimated Incurred** (Based on Balance Cost to be Rs. Nil / 4 in Cost) Incurred on Additional/ExtraItems not included 5. Cost the Estimated Cost (Table-C) Yours Faithfully, SHIVANIS SATALE Local Authority license no- 05/21 Agreed and accepted by: Signature of Promoter Narne. Date: Note. of work is to complete Registered Real Estate sale. Project as per drawings appryed frorn tirme to scope agreement of 1. The cifications mentioned in speci as per time and can be done by an independent Quantity Surveyor, office of Engineer or Survey can be done by upon by the Engineer. In case of independent quantity Quantity calculated can be relied ( ) and in case 2.( ) certificate of quantity be mentioned at the place narked Developer, the name has to person in the office of Engineer, who is whose appointed by Engineer, the name of the surveyor being calculated bv office of the place marked (*) being calculated should be mentioned at quantity are quantity (1) and Actual responsible for the Difference between Total estimated Cost from an estimated cost, any incurred (4) may vary escalation of cost etc. As this isamendment of the cost 3.(**)Balance Cost to be deviation in quantityrequired /Reeal Estate Project will result in incurred (2) due to development of the Cost required for deviation in quantity incurred. exhaustive. incurred/to be and not specifications are indicative material used with in input componentsof work Any deviations 5. All qualifications. Example: any deviations / Please specify if there are ofsale. 6. agreement specification in from Table C considered in Cost Items /Additional/Deleted Estimate of Total Cost) List of Extra original were not part ofthe (which Amount (In Rs.) Items /Additional /Deleted List of Extra Sr. No. 1. 2.