Annexure A FORM 1 (See Regulation 3) ARCHITECT'S CERTIFICATE (To be submitted at the time of Registration of Ongoing Project and for withdrawal of Money from Designated Account) Date-30-09-2024 To, Gurumukhsingh G. Panjwani&Others S.No.-178(P),Sheet No.-78,57 Mouje-Shahad, UIlhasnagar-1 Sub: -Certificate of percentage of Completion Work of Golden City of the Project having Maha ReRA NumberP5/7 00O55313 being developed by Gurumukhsingh G. Panjwani &others Ref.No: UMC/ TPD/ BP /107 /22/ 488, dated 20/12/2022 Sir, /We SHIVANI SSATALE have undertaken assignment as Architect of certifying Percentage of Completion of Construction Work of Golden City Project on S.No.-178(P), Sheet No.-78,57, Mouje-Shahad, Ulhasnagar-1 of admeasuring 3900 sq. Mts.. having MahaRERA Registration Number P51700055313 (Only Applicable after project Registration, being developed by Gurumukhsingh G. Panjwani Based on Site Inspection. With respect to each of the Building/Wing of the aforesaid Real Estate Project I certifythat as on the date of this certificate, the Percentage of work done for each of the building/Wing of the Real Estate Project under MahaRERA is as per Table A herein below. The percentage of the work executed withrespect to each of the activity of the entire phase is detailed in Table B. TABLE-A 1 002. Golden City Wing A/A1 (10" floor) Percentage of Actual Work Dore Tasks / Activity (As on date of the Certificate) Sr.No. (2) (3) 100 % (1) Excavation NO 1 Basements(ifany) 0% ted 2. podiums 100 % Zero No. of 3 Plinth 0% One No. of 4. Stilt Floor 8SLABCOMPLETE 5 Slabs of SuperStructure 0% 6. 11 no. of Plaster, Floorings, Doors and Internal walls,Internal 0% windows within Flats/Premises 7. Flat/Premises 0% withinthe 8 Sanitary Fittings Lobbies at each Floor level and Staircases Lifts Wells Tanks 0% Underground Water 9. Overhead and external plaster, elevation, and External plumbing with water proofing of the completion of terraces 0% 10. Building/Wing. Fittings water pumps, Fire Fighting Installation of Lifts, NOc, Electrical fittings, as per CFO of and Equipment equipment, compliance to conditions mechanical lobby/s NOC, finishing to entrance environment/CRZ appurtenant to plinth protection,paving of areas other 11. Walland all Building/Wing, Compound project as may be required to complete other requirements agreement of Sale. Any peer specifications is aOs activities. TABLE-A Golden City Wing B/B1 (10h floor) 421 0 Tasks/ Activity Percentage of ACtual Work Done (As on date of the Sr. No. (2) Certificate) (3) (1) 70% Excavation NO 1 Basements(ifany) 0% 2 Zero No.ofpodiums 25 % 3. Plinth 0% One No. of 4. Stilt Floor 0% 5. Structure (Stilt +10 = 11) 0% Slabs ofSuper Floorings, Doorsand 11no. of Plaster, 6. Internal 0% Internal walls, windows within Flats/Premises 7. Flat/Premises 0% within the Sanitary Fittings Floor level Lobbies at each 0% Wellsand Staircases LiftsUnderground Water Tanks Overhead and external plaster,elevation, and proofing of the External plumbing terraces with water 0% completion of 10. Building/Wing. Fire Fighting Fittings water pumps, fittings, Installation of Lifts, CFO NOC, Electrical Equipment as per compliance to conditionsof and equipment, lobby/s mechanical finishing to entrance to environment/CRZ NOC, appurtenant paving ofareas protection, allother 11. plinth Compound Walland complete project Building/Wing, to as may be required agreenment ofSale. Anyother requirements is specifications aos peer activities. CommonAf al Golden City Wing DevetopmentA/A1,Works) in B/81 (10"respect the of floor) Regtsterod phase Proposed Percentage of Actual Common areas and Facilities (Yes / No ) Work Done betals Sr. No. (As ondate of the (2) (3) (1) Certificate) (4) Footpaths NO (9) 1. Internal Roads & 0 YES AT THE TIME OF Water Supply 2 0 COMPLETION AT THE TIME OF Sewerage (Chamber, lines, YES Septic Tank, STP) COMPLETION 3 AT THE TIME OF YES COMPLETION Storm Water Drains 4 0 AT THE TIME OF YES COMPLETION Planting Landscaping & Tree AT THE TIME OF 5. COMPLETION YES Street Lighting AT THE TIME OF 6. COMPLETION YES AT THE TIME OF Community Buildings 0 7. COMPLETION disposal of YES Treatment and water. 8. sewage and sullage Solid Waste NO OF management & AT THE TIME COMPLETION Disposal YES Water conservation/ 10. Rain water harvesting NO TIME OF Energy management AT THE COMPLETION 11. and fire safety YES AT THE TIME OF Fire protection COMPLETION 12. requirements sub YES Electrical meter room, As per plan 13. station, receiving station. YES 14 Open Parking Yours Faithfully, SHIVANIS SATALE Agreed and acepted by: Signature of Promoter