DIVD ARCHITECT9 ,D' BLOCK, 1ST FLOOR, ZOJWALA SHOPPING CENTRE SAHAJANAND CHOWK, AGRA.iOAD, KALYAN (W) - 421 30'1. MOB.: 9967373232 EMAIL : dmdarchitects@yahoo.com Annexure A FORM 1 ARCHITECT'S CERTIFICATE Date :- 30.06.2026 To, M/s Oyster Saket lnfrastructure, Opp. Dwarli Post Office, Haji Malang Road, Kalyan East.J Subiect: Certificate of Percentage of Completion of Construction Work of "NATURE VISTA" Building 1, having MahaRERA Registration Number "P51700052551" being developed by "M/s oyster saket I nfrastructure" (Promoter).' Sir, I Mrs. Shailaja Vaidya (Architect) have undertaken assignment as Architect /Licensed Surveyor of certifying Percentage of completion of construction work of "NATURE VISTA" Buildin8 1, having tr/ahaRERA Registration Number "P51700052551" being developed by "M/s oyster saket lnf rastructure" ( Promoter). Based on Site lnspection, with respect to LayouU each of the Building,ryVing of lhe aforesaid Real Estate proiect. I certify that as on the date of this certificate, the Percentage of Work done for each of the buildingMing of the Real Estate Project under MahaRERA is as per Tabte A herein below. The percentage of the work executed with respect to each of the activity of the entire phase is detailed in Table B. TABLE-A Nature Vista Building 1 Percentage of Actual Sr. No Tasks / Activity Work Done (1) (2) (3) 100% Excavation o% 2 Basements (if any) 0% 3 Podiums (if any) 100% 4 Plinth 0o/o Slilt Floor 6 labs of Super Structure lnternal walls, lnternal Plaster, Floorings, Doors and windows 15.38% lYo ! 7 ithin FlatsiPremises 0% anitary Fittings within the Flat/Premises 8 0% taircases, Lifts Wells and Lobbies at each Floor level Overhead 9 nd Underground Water Tanks o% xternal plumbing and external plaster, elevation. completion of 10 erraces wilh waterproofing of lhe BuildingA/Ving 11 nstallation of Lifts. Water pumps, Fire Fighting Fittings an d 0% quipment as per CFO NOC, Electrical fittings, mechanical uipment, compliance to conditions of environment/CRZ NOC, inishing to entrance lobby/s, plinth protection. paving of areas ppurtenant to BuildingMing, Compound Wall and all other uirements as may be required to complete pro.iect as per pecifications in agreement of Sale. Any other activities TABLE.B Common Areas (lnternal and External Development Works) in respect of the Registered Phase/ Project Number I Proposed Percentage of Details Common areas and Facilities Sr. No (Yes / No) Actual Work Done (1) 12\ (3) (4) (5) 1 lnternal Roads & Footpaths Yes 5% 2 Water Su pply Yes 00k 3 Sewerage (Chamber, lines, Septic Yes 0% Tank, STP). 4 Storm Waler Drains Yes 0% 5 Landscaping & Tree Planting Yes 0% 6 Street Lighting Yes 00k 7 Community Buildings Yes o% 8 Treatment and disposal of sewage Yes 0% and sullage water. Yes 0 9 Solid Waste management & Disposal Yes 0 Water conservation, 10 Rain water harvesting 11 Yes 0 Energy management Yes 0 Fire Protection and Fire safetY 12. Requirements 13 Yes 0 Electrical meter room, sub-station, receiving station. 14 Aggregate Area of recreational Open Yes 0 Space Yours Faithfully, For DMD Architects -oruo ancutrecrs T' BLOCK, ZOJWALA SHOPPING CENTRE, (AR. Shailaja Vaidya) AGRA ROAD, KALYAN (W), License no. I CA-2002129f49 PH :9967373232 Email : dmdarchitects@Yahoo,com Kalyan (West) Agreed and Accepted by: For M/s. oyster Saket lnfrastructure Co- Ventu rer