DIVD ARCHITECTS 'D'BLOCK, 1ST FLOOR, ZOJWALA SHOPPI NG CENTRE, SAHAJANAND CHOWK, AGRA ROAD, KALYAN (w) - 421 301. MOB.: 9967373232 EMAIL : dmdarchitects@yahoo.com Annexure A FORM 1 ARCHITECT'S CERTI FICATE Date :- 31.12.2025 To, M/s Oyster Saket lnfrastructure, Opp. Dwarli Post Office, Haji Malang Road, Kalyan East.J Subject: Certificate of Percentage of Completion of Construction Work of "NATURE VISTA" Building 1, having MahaRERA Registration Number "P5170005255L" being developed by "Mls Oyster Saket lnfrastructure" (Promoter).' Sir, I Mrs. Shailaja Vaidya (Architect) have undertaken assignment as Architect /Licensed Surveyor of certifying Percentage of Completion of Construction Work of "NATURE VISTA" Building 1, having lVahaRERA Registration Number "P5170005255L" being developed by "Mls Oyster Saket lnfrastructure" ( P romoter). Based on Site lnspection, with respect to Layout/ each of the Building/Wing of the aforesaid Real Estate Project. I certify that as on the date of this certificate, the Percentage of Work done for each of the building/Wing of the Real Estate Project under tt/ahaRERA is as per Table A herein below. The percentage of the work executed with respect to each of the activity of the entire phase is detailed in Table B. TABLE-A Nature Vista Building 1 Percentage of Actual Sr. No Tasks / Activity Work Done (1) (2) (3) 100o/o I Excavation 0% 2 Basements (if any) 0% 3 Podiums (if any) 1O0o/o 4 Plinth 0o/o 5 Stilt Floor 0o/o Slabs of Super Structure o. lnternalwalls, lnternal Plaster, Floorings, Doors and windows 0% 7 within Flats/Premises 0% Sanitary Fittings within the Flat/Premises 8 Staircases, Lifts Wells and Lobbies at each Floor level Overhead 0o/o 9 and Underground Water Tanks External plumbing and external plaster, elevation, completion of 0% 10 terraces with waterproofing of the Building/Wing. 11 lnstallation of Lifts. Water pumps, Fire Fighting Fittings and 0o/o Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions of environment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. Any other activities. TABLE-B Common Areas (lnternal and External Development Works) in respect of the Registered Phase/ Project Number Proposed Percentage of Details Common areas and Facilities Sr. No. (Yes / No) Actual Work Done (1) (2) (3) (4) (5) 1 lnternal Roads & Footpaths Yes 5o/o 2 Water Supply Yes 0% 3 Sewerage (Chamber, lines, Septic Yes 0% Tank, STP). 4 Storm Water Drains Yes 0% 5 Landscaping & Tree Planting Yes 0o/o 6 Street Lighting Yes 0% 7 Community Buildings Yes 0% I Treatment and disposal of sewage Yes Oo/o and sullage water. Yes 0 9 Solid Waste management & Disposal Yes 0 Water conservation, 10 Rain water harvesting 11 Yes 0 Energy management Fire Protection and Fire safety Yes 0 12 Requirements 13 Electrical meter room, sub-statton, Yes U receiving station. ' 14 Aggregate Area of recreational Open Yes 0 Space Yours Faithfully, For DMD Architects fl.ey Signature (AR. Shailaja Vaidya) License no. :- CA-20O2129L49 Kalyan (West) Agreed and Accepted by : For M/s. Oyster Saket Infrastructure Co- Venturer