DIVD ARCHITTCTS 'D'BLOCK, 1ST FLOOR, ZOJWALA SHOPPI NG CENTRE, SAHAJANAND CHOWK, AGRA ROAD, KALYAN (w) - 421 301. MOB.: 9967373232 EMAIL : dmdarchitects@yahoo.com d Annexure A FORM 1 ARCHTTECT'S CERTIFICATE Date :- 30.06.2025 To, M/s Oyster Saket lnfrastructure, Opp. Dwarli Post Office, Haji Malang Road, Kalyan East.J Subject: Certificate of Percentage of Completion of Construction Work of "NATURE VISTA" Building 1, having MahaRERA Registration Number "P5170005255L" being developed by "M/s oyster Saket lnfrastructure" (Promoter).' Sir, I Mrs. Shailaja Vaidya (Architect) have undertaken assignment as Architect /Licensed Surveyor of certifying percentage of Completion of Construction Work of "NATURE VISTA" Building 1, having MahaRERA Registration Number "P5170005255!" being developed by "M/s Oyster Saket lnfrastructure" (Promoter). Based on Site lnspection, with respect to Layout/ each of the BuildingMing of the aforesaid Real Estate project. I certify that as on the date of this certificate, the Percentage of Work done for each of the buildingrying of the Real Estate Project under MahaRERA is as per Table A herein below. The percentage of the work executed with respect to each of the activity of the entire phase is detailed in Table B. TABLE-A Nature Vista Building 1 Percentage of Actual Sr. No Tasks / Activity Work Done (1) (2) (s) 1O0o/o I Excavation 0o/o 2 Basements (if any) jYo 3 Podiums (if any) 100Yo 4. Plinth 0o/o 5 Stilt Floor Slabs of Super Structure 0o/o 6. \ nternalwalls, lnternal Plaster, Floorings, Doors and windows 0% 7 in Flats/Premises 0o/o Fittings within the FlaVPremises 8 rcases, Lifts Wells and Lobbies at each Floor level Overhead 0% 9. Underground Water Tanks plumbing and external plaster, elevation, completion of 0% 10. with waterproofing of the BuildingAlVing. 11 nstallation of Lifts Water pumps, Fire Fighting Fittings and 0o/o ipment as per CFO NOC, Electricalfittings, mechanical uipment, compliance to conditions of environment/CRZ NOC, nishing to entrance lobby/s, plinth protection. paving of areas purtenant to BuildingAlVing, Compound Wall and all other uirements as may be required to complete project as per pecifications in agreement of Sale. Any other activities TABLE.B Common Areas (lnternal and External Development Works) in respect of the Registered phase/ Project Number Proposed Percentage of Details Common areas and Facilities Sr. No. (Yes / No) ActualWork Done (1) (2) (3) (4) (5) 1 lnternal Roads & Footpaths Yes 5o/o 2 Water Supply Yes 0% 3 Sewerage (Chamber, lines, Septic Yes 0% Tank, STP). 4 Storm Water Drains Yes 0o/o 5 Landscaping & Tree Planting Yes 0% 6 Street Lighting Yes Oo/o 7 Community Buildings Yes 0o/o 8 Treatm ent and disposal of sewage Yes 0o/o and sullage water Yes 0 I Solid Waste management & Disposal Water conservation, Yes 0 10 Rain water harvesting 11 Yes 0 Energy management Fire Protection and Fire safety Yes 0 12. Requirements 13. Electrical meter room, sub-station, Yes 0 receiving station. ' 14 Agg regate Area of recreational Open Yes 0 Space Yours Faithfully, For DMD Architects 2,,,4r--- (AR. Shailaja Vaidya) DMD ARCHITECTS .D' BLOCK, ZOJWALA SHOPPING CENTRE, License no. :- CA-2002129t49 AGRA ROAD, KALYAN (W), PH :9967373232 Kalyan (West) Email : dmdarchitects@yahoo.com Agreed and Accepted by: For M/s. Oyster Saket lnfrastructure OWARLI Co- Venturer