DIVD ARCHITTCTS 'D'BLOCK, 1ST FLOOR, ZOJWALA SHOPPING CENTRE, SAHAJANAND CHOWK, AGRA ROAD, KALYAN (W) - 421 301. MOB.: 9967373232 EMAI L : dmdarchitects@yahoo.com Annexure A FORM 1 ARCHITECT'S CERTIFICATE Date:- 31.03.2025 To, M/s Oyster Saket lnfrastructure, Opp. Dwarli Post Office, Haji Malang Road, Kalyan East.J of "NATURE vlsrA" Building 1, subject: certificate of percentage of completion of Construction work developed by "M/s Oyster Saket having MahaRERA Registration Number "p51700052551" being I nfrastructure" ( Promoter).' Sir, /Licensed surveyor of I Mrs. Shailaja vaidya (Architect) have undertaken assignment as Architect VISTA" Building 1' having certifying Percentage of completion of construction work of "NATURE MahaRERA Registration Number "P51700052551" being developed by "Mls Oyster saket I nfrastructure" ( Promoter). of the aforesaid Real Estate Based on Site tnspection, with respectto Layout/ each of the BuildingMing project. I certify that as on the date of this certificate, the Percentage of Work done for each of the per Table A herein below' The buildingAruing of the Real Estate Project under MahaRERA is as percentage of the work executed with respect to each of the activity of the entire phase is detailed in Table B. TABLE.A Nature Vista Building 1 Percentage of Actual Sr. No Tasks / ActivitY Work Done (1) (2) (3) 100% Excavation 0% 2. Basements (if anY) 0% 3 Podiums (if any) 0o/o 4. Plinth 0% 5 Stilt Floor 0% labs of Super Structure 6 0% nternalwalls, lnternal Plaster, Floorings, Doors and windows 7 Flats/Premises 0% nitary Fittings within the Flat/Premises I 0% ircases, Lifts Wells and Lobbies at each Floor level Overhead I U nderground Water Tanks 0% rnal plumbing and external plaster, elevation, completion of 10 with waterproofing of the BuildingANing nstallation of Lifts. Water PumPS, F ire Fighting Fittings and 0% 11 uipment as per CFO NOC, Electricalfittings, mechanical ipment, compliance to conditions of environment/CRZ NOC, ing to entrance lobby/s, plinth protection' paving of areas ppurtenant to BuildingfuVing, Compound Wall and all other rements as may be required to complete project as per in agreeme nt of Sale. Any other activities TABLE-B Phase/ Common Areas (lnternal and External Development works) in respect of the Registered Project Number Proposed Percentage of Details Common areas and Facilities Sr. No. (Yes / No) ActualWork Done (1) (2) (3) (4) (5) 1 lnternal Roads & FootPaths Yes 5o/o 2 Water Supply Yes 0% 3 Sewerage (Chamber, lines, SePtic Yes 0% Tank, STP). 4 Storm Water Drains Yes 00k 5 Landscaping & Tree Planting Yes 0o/o 6. Street Lighting Yes 0% 7 Community Buildings Yes 0% B. Treatment and disposal of sewage Yes 0% and sullage water. Yes 0 9 Solid Waste management & Disposal Yes 0 Water conservation, 10. Rain water harvesting 11 Yes 0 Energy management Yes 0 Fire Protection and Fire safetY 12 Requirements 13. Electrical meter room, sub-station, Yes 0 receiving station. 14 Aggregate Area of recreational Open Yes 0 Space Yours Faithfully, For DMD Architects . Shailaia , License no. :- CA-2002129L49 Kalyan (West) PH : 9967-173232 ahqo'com Agreed and Accepted by : Email : dmdarchitects@Y For M/s. Oyster Saket lnfrastructure $N9 DWARLI 70 Co- Venturer O*