ABHINEET BAJPAI LICENSED ENGINEER Annexure C FORM -2A (See Maha RERA order No. 5 of 2018) ENGINEER'S CERTIFICATE FOR QUATITY ASSURANCE (Site Supervisor's Certificate) (To be submitted at the end of Financial Year) Date :3L.03.2024 To, Oyste r Sa ket nfrastructure I Village Dwarli, Haji Malang Road, Kalyan East - 421306. Qual ity Assurance Certif icate (Certificate No. 1 for the year ending 3tlo3l2024l Subject :Certificate for quality of materials used and quality of Construction and workmanship for the Work of "Building 1" of the project "NATURE VISTA" situated on the plot bearing Survey No. 36/74 & 36178 , Haji Malang Road, Village - Dwarli, Taluka Kalyan District Thane PIN 42L306 having MAHARERA Registration Number :- "P51700052551" land under construction being Part of the Larger land area being developed by M/s. Oyster Saket lnfrastructure . Sir, lAbhineet Bajpai have undertaken an assignment of supervision of this real estate project Our Responsibility: I am responsible for carrying out the work in accordance with the development permission and as per the approved plan and submit certificate of supervision of work and to carry out material testing in-situ or in the authorized laboratory and to ensure quality of work and workmanship as per prescribed specifications, and as per NBC and or other relevant code of practice. 1. Structural Design, Stability and Testing:- Sr. Parameters Yes No Remarks No 1_ Whether Soil investigations of the site has been conducted v before the structural design and soil parameters have been accounted for in the structural design / drawings ? Address :- Flat No 603, 6'h Floor, Govind Enclave, Gavdevi Road, Kalyan East - 421305 E - sgeggo4sl5 El :-abhineetbajpai15@gmait.com pAN No:- BRtpBo3sgp ABHINEET BAJPAI LICENSED ENGINEER 2 Whether Structural Engineer has been appointed for the v Name :- Mr. Ankush Project ? Mohile of Ankush Mohile & Associates Licenses no. STR/M-82 cell no. 9820155673 3 Whether the inspection registers, site order book and N Only Excavation work quality control test registers are maintained at the site done properly and endorsed by the Engineer-in-Charge? 4 Whether testing facilities to check quality of material is N Only Excavation work available at site? done 5 Whether the statuary provisions for disaster resistance/ v earthquake resistant design have been incorporated, specially in case of multi-storeyed construction? 6 Has suitable cognizance been taken on demarcated Y flood lines and appropriate precautions taken for protecting the site from flooding considering local flooding issues? 2. lnput Materials r Sr. Parameters Yes No Remarks No 1 Whether the following building materials confirm to N Only Excavation relevant IS/BS/NBC Code, or as per Industry Standards? work done lf yes, provide details: (a) Cement, concrete and coarse aggregate (b) Steel and its alloys (c) Electrical wire, fittings and accessories [d] Plumbing and sanitary fittings 2 Whether regular tests of materials and construction N Only Excavation products are being done from accredited labs also? Ifyes, work done details of such labs 3 Whether manufacturer test certificate for cement, steel, N Only Excavation pipes etc. have been obtained and whetler supply records work done are being maintained? 4 Whether suitable water is being used for construction? N Only Excavation [0 What is the source of water? work done (irl Has water been tested and approved by Engineer-in- Charge before construction? (rrrl Has water been tested subsequently as per requirement? Address :- Flat No 603, 6'h Floor, Govind Enclave, Gavdevi Road, Kalyan East - 421306 ! - 8369904815 El :-abhineetbajpailS@gmail.com PAN No:- BR|PB0359P ABHINEET BAJPAI LICENSED ENGINEER 3. Quality of Workmanship :- Sr. Parameters Yes No Remarks No. 1 Whether works of all the electrical wiring/ connections/ lift N Only installation / other electrical installations have been carried Excavation out under authorized /registered electrical engineer and work done whether records of the same has been maintained? 2 Whether all related works of plumbing & sanitary including N Only installation of water supply systems, drainage systems, Excavation sewage systems, sinks, toilets etc. have been carried out work done under authorized /registered plumbers / sanitary contractors and whether records of the same has been maintained? 3 Whether all the work is being carried out under supervision N Only of experienced and skilled professional? Further, whether Excavation the workmanship and quality is satisfactory and up to the work done mark and the work is within the acceptable and permissible limits of deviations as per relevant Code of Practice? 4 Whether remedial measures are undertaken to prevent N Only dampness and leakages ? If yes, provide details Excavation work done 5 Whether safety precautions are undertaken during N Only construction activities for all type of workers ? Excavation work done 4. Miscellaneous r Sr. Parameters Yes No Remarks No. 1 Whether third party quality inspection is being carried out N Only on site during/after completion of the works? Excavation If yes, provide details. work done 2 Whether anti-termite treatment has been undertaken for the N Only soil? Excavation work done 3 Whether fire-fighting arrangements has been undertaken N Only under supervision of fire consultant? Excavation work done Address :- Flat No 603, 6'h Floor, Govind Enclave, Gavdevi Road, Kalyan East - 421306. ,3. - S:OSSO4815 EX :-abhineetbajpai15@gmail.com PAN No:- BR|PB0359p ABHINEET BAJPAI LICENSED ENGINEER 4 Whether proper signages have been installed on site/ N Only completed building as per requirement? Excavation work done 5 Whether precautions are undertaken to avoid air pollution N Only during construction? PIease speciff. Excavation work done 6 Whether records of all test reports / results have been N Only properly kept in the prescribed formats and whether the Excavation same are available at site for viewing by allottees and to be work done handed over to the association ofallottees? 7 Whether all relevant records including sanctioned building N Only plans, utility drawings, various test reports / results have Excavation been properly kept in the prescribed formats to be handed work done over to the association ofallottees? 8 Any innovative/ cost effective/ green technology has been N Only used for improving quality/enerry efficiency? Please speciff Excavation work done Yours faithfully, Yours Faithfully, Abhineet Digitally siqned by Abhinet Bajpai Date:2024.1 1.29 l8:14O7 +05'30' Bajpai Signature of Engineer (Abhineet Bajpai) Local Authority License no. KDMCC/R{2O23/ APL{00123 Agreed and Accepted by: For M/s. Saket lnfrastructure Co - Venturer Date- 2g \ r.\ \ r-o Address :- Flat No 503, 6'h Floor, Govind Enclave, Gavdevi Road, Kalyan East - 421306 0, - SSeggO4815 EI :-abhineetbajpails@gmail.com pAN No:- BRtpBO3sgp