DIVD ARCIIITECTS 'D'BLOCK, 1ST FLOOR, ZOJWALA SHOPPING CENTRE, SAHAJANAND CHOWK, AGRA ROAD, KALYAN (W) - 421 301. MOB.: 9967373232 EMAI L : DMDARCHITECTS@YAHOO.COM Annexure A FORM 1 ARCHITECT'S CERTIFICATE Date:- 2110512024 To, M/s Oyster Saket lnfrastructure, Opp. Dwarli Post Office, Haji Malang Road, Kalyan East. Subject: Certificate of Percentage of Completion of Construction Work of "NATURE VISTA" Building 1, having tVlahaRERA Registration Number "P5170005255L" being developed by "M/s Oyster Saket lnfrastructure" (Promoter).' Sir, I Mrs. Shailaja Vaidya (Architect) have undertaken assignment as Architect /Licensed Surveyor of certifying Percentage of Completion of Construction Work of "NATURE VISTA" Building 1, having MahaRERA Registration Number "P5170005255L" being developed by "M/s Oyster Saket lnfrastructure" (Promoter). Based on Site lnspection, with respect to Layout/ each of the BuildingA//ing of the aforesaid Real Estate Project. I certify that as on the date of this certificate, the Percentage of Work done for each of the buildingfuVing of the Real Estate Project under MahaRERA is as per Table A herein below. The percentage of the work executed with respect to each of the activity of the entire phase is detailed in Table B. TABLE-A Building 1 Percentage of Actual Sr. No Tasks / Activity Work Done (1) (2) (As on Dt.2110512024) (3) Excavation 100% 2 Basements (if any) 0% 3 Podiums (if any) 0% 4 Plinth 0o/o 5 Stilt Floor o% 0o/o Slabs of Super Structure 6 lnternal walls, lnternal Plaster, Floorings, Doors and windows 0% 7 within FlatsiPremises 0% Sanitary Fittings within the Flat/Premises 8 Staircases, Lifts Wells and Lobbies at each Floor level Overhead 0% I and Underground Water Tanks External plumbing and external plaster, elevation, completion of 0% 10. terraces with waterproofing of the BuildingA/Uing. 11 lnstallation of Lifts. Water pumps, Fire Fighting Fittings and 0% Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions of environment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to BuildingA/Uing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. Any other activities. TABLE-B Common Areas (lnternal and External Development Works) in respect of the Registered Phase/ Proiect Number Proposed Percentage of Details Common areas and Facilities Sr. No (Yes / No) ActualWork Done (As on Dt. (1) (2) (3) 02.01.2024) (5) (4) 1 lnternal Roads & Footpaths Yes 5o/o Building 2 2 Water Supply Yes 0o/o Building 2 3 Sewerage (Chamber, lines, Septic Yes 0% Building 2 Tank, STP). 4. Storm Water Drains Yes 0% Common facility for 12 building layout 5 Landscaping & Tree Planting Yes 0% Building 2 6 Street Lighting Yes Oo/o Building 2 7 Community Buildings No 0o/o NA 8 Treatment and disposal of sewage Yes 0o/o Common facility for and sullage water. 12 building layout Yes 0 Common facility for 12 9 Solid Waste management & building layout Disposal Yes 0 Water conservation, 10 Building 2 Rain water harvesting 11. Yes 0 Common facility for 12 Energy management building layout Fire Protection and Fire safety Yes 0 12 Requirements Building 2 13 Electrical meter room, sub-station, Yes 0 Common facility for 12 receiving station. building layout 14 Aggregate Area of recreational Open Yes 0 Building 2 Space Yours Fa ithf u lly, I LAJ4 I q 0M0 I For DMD Architects ARCHITECTS KALYAN D MD ARC !TEC T s 69 .O'BLOCK, 02 ZOJ WATA SHOPPING CEI{TRE (AR. Shailaja idya) AGRA R'0A0, KALYAN (W), License no. - CA-2OO2129149 PH : 99673i3232 Em ail :d darchi tects ,e) ah oo.Com Kalyan (West) Agreed and Accepted by: For M/s, Oyster Saket lnfrastructure IN F DWARLI c o Co- Venturer Date 2t/O512024 Or