SANITARY REQUIREMENT (PERMITTED) FSI DETAILS PROJECT TYPE - Building Development 1 No. W.C. FOR EVERY 25 PERSONS PREMIUM 56.97(P) R.W.H SITE U/R DESIGN OF GATE 1 No. URINAL FOR EVERY 25 PERSONS 2 - INDEX TOTAL IN BASIC FSI FSI/ADDIT- -SITU/TDR INCENTIVE FSI RESI ANCIL- NON RESI ANCIL- TOTAL INCLUSIVE HOUSING DRAWING LARY AREA LARY AREA (20%) IF APPLICABLE VALUE GATE IONAL FSI 6.15 PLOT A-9 &10 1 No. WASHBASIN FOR EVERY 25 PERSONS S.W.S MALE-FEMALE RATIO 1:1 SEAL OF APPROVAL MAN HOLE STONE SLAB COVER 2.1 - PERMISSIBLE 1.00 3.00 0.00 0.00 0.00 0.80 4.80 0.00 0.00 6.23 38.00 M.WIDE PCC 1:2:4 FIRST CLASS BRICK EDGEING OCCUPANT LOAD = 10 PERSONS PER 100 SQ.M. OF INDEX Digitally signed 6.03 COVERED AREA KALYAN BADLAPUR ROAD 2.2 - EXISTING CONSUMED INSPECTION RAMESH 1.00 0.00 0.00 0.00 0.00 0.80 1.80 00.00 0.00 1.50 by RAMESH 160Ø PVC PIPE SANITARY REQUIREMENT (PROPOSED) ENTRANCE GATE ELEVATION INDEX NALLA INLET OA D A-10 B-1 BAFFLE WALL 2.3 - BALANCE INDEX TO A1 FLOOR No. OF W.C. No. OF No. OF 18.0 M W.R PANDITRAO CHAMBER COPING 0.00 3.00 0.00 0.00 0.00 0.00 3.00 00.00 0.00 BRICK BALLAST OUTLET TO URINAL WASH BASINS 18.00 M WIDE ROAD 50 TO 80mm NOMINAL SIZE SOAK PIT BE CONSUME PANDITR 0.90 3.00 A-02 GR FL. 31 - 31 A-9 PATIL SEPTIC TANK R.C.C. JALI 2.4 - TOTAL PERMISSIBLE A2 B-2 IN HONEY COMPMASONRY 1.50 1ST FL. 31 - 31 3219.00 9657.00 0.00 0.00 0.00 2571.42 15447.42 00.00 0.00 OPEN TO SKY BRICK BALLAST 600x600 INLET CHEMBER BUILT COPING 2ND FL. 16 - 16 PLINE AREA AUTH_SIGN G.L. TOTAL 78 Nos. 00 Nos. 78 Nos. Date: AO PATIL A-8 TOTAL PERMISSIBLE FOR 57.08(P) 0.60 1.5 A3 54.20(P) PLAN OF SOAK PIT FRONT WALL 43.87 B-3 REDEVELOPMENT AREA 00.00 00.00 00.00 00.00 00.00 00.00 00.00 00.00 00.00 SECTION OF SEPTIC TANK 2025.04.05 EQ. EQ. EQ. 0.60 EQ. EQ. EQ. G.L. (PLINE AREA) 6.00 A4 A-7 PCC 1:2:4 STONE SLAB COVER FIRST CLASS BRICK EDGEING SIDE AND REAR WALL COMPOUND WALL DETAIL 2.5 - PROPOSED PLINE AREA (SHOULD NOT) 0.00 0.00 0.00 0.00 0.00 0.00 0.00 00.00 0.00 16:11:31 +05'30' B-4 A-1 (A-9&10) 160Ø PVC PIPE EXCEED 2.4) PROJECT INFORMATION A-01 A-6 SOAK PIT Building Height : 14.95 Mtrs A5 CASE TYPE Addition or Extension 1.50 GATE LOWER GROUND + GROUND + 2ND FLOOR OUTLET TO OVER FLOW TO CITY DRAIN OUTLET TO 2.6 - INDEX CONSUMED 3214.28 0.00 0.00 0.00 0.00 2571.42 5785.70 00.00 1.80 OAD LOCATION Non-Congested Area 18.0 M W.R SOAK PIT FILTER SEPTIC TANK SOAK PIT INLET INSPECTION MIXED CLASS DRY HONEY COMB SHAFT BRICK BALLAST 50 TO 80mm NOMINAL SIZE 0.30 PLOT USE Industrial Buildings (U/G)TANK(1) ROAD0.30 N CHAMBER CHAMBER BAFFLE WALL BRICK BATS 0.23 SECTION THROU 0.23 BUILDING WISE FSI STATEMENT FLOOR WISE FSI STATEMENT: A (A-9&10) PLOT SUB USE AREA STATEMENT IT / ITES SQ. M. 6.03 LOCATION PLAN BRICK BALLAST 46.11 1.50 4.30 GATE (DRAIN) 1. AREA OF PLOT 3219.00 FSI AREA FSI AREA 6.02 6.00 SCALE 1:2500 BUILDING BALC PASS STAIR LIFT TENE BUILDING BALC PASS STAIR LIFT TENE (Minimum area of a, b, c to be considered excluding NIP) GATE GATE EQ. EQ. EQ. 0.60 EQ. EQ. EQ. RESI NON RESI RESI NON RESI (a) As per ownership document (7/12, CTS extract) 58.90(P) 0.00 PLAN OF SEPTIC TANK SECTION OF SOAK PIT Triangulation (Scale - 1:500) A-1 (A-9&10) Total 0.00 0.00 5785.70 5785.70 0.00 0.00 0.00 137.08 85.59 0.00 137.08 85.59 0 0 TERRACE FLOOR SECOND FLOOR 0.00 0.00 0.00 1990.25 0.00 0.00 0.00 0.00 0.00 46.26 33.75 25.92 0 0 (b) as per measurement sheet 3219.00 (c) as per site 0.00 FIRST FLOOR 0.00 1983.09 0.00 0.00 45.41 25.92 0 2. DEDUCTIONS FOR Triangle Area SCHEDULE OF OPENING: A (A-9&10) GROUND FLOOR 0.00 1812.36 0.00 0.00 45.41 0.00 0 (a) Proposed D.P./ D.P. RW Area/Service Road /Highway 0.00 A-01 1595.00 WATER REQUIREMENT NAME LENGTH HEIGHT NOS. BASEMENT PARKING FLOOR 0.00 0.00 0.00 0.00 0.00 0.00 0 (b) Any D.P. Reservation area 0.00 A-02 1624.00 REQD CAPACITY(LIT) PROP CAPACITY(LIT) RS 2.00 2.10 01 Total 0.00 5785.70 0.00 0.00 137.08 85.59 0 (Total a+b) 0.00 Total (PLOT) 3219.00 -NA- 664074.45 RS 2.11 2.10 08 3. BALANCE PLOT AREA (1 - 2 ) 3219.00 38.00 M WIDE ROAD RS 3.51 2.10 07 4. AMENITY SPACE (if applicable) (a) Required - 0.00 RS 3.68 2.10 12 (b) Adjustment of 2(b), if any - 000.00 RS 4.20 2.10 01 (c) Balance Proposed - 0.00 RS 4.76 2.10 01 5. NET PLOT AREA (3-4(c)) 3219.00 D1 1.20 2.10 52 6. RECREATIONAL OPEN SPACE (if applicable) D3 0.80 2.10 75 0.00 (a) Required - D4 2.40 2.10 04 (b) Proposed - 0.00 SCHEDULE OF OPENING: A (A-9&10) 7. INTERNAL ROAD AREA 000.00 LAYOUT PLAN (Scale - 1:500) NAME LENGTH HEIGHT NOS. 8. PLOTABLE AREA (if applicable) 000.00 PLOT NO. A-8 V 0.60 1.20 77 9. BUILT UP AREA WITH REF. TO BASE F.S.I. 3219.00 W1 1.50 1.50 12 AS PER FRONT ROAD WIDTH (Sr.no.5 x Base FSI) 56.86 RAINWATER W2 3.51 3.00 08 10. ADDITION OF FSI ON PAYMENT OF PREMIUM HARVESTING W3 3.68 3.00 10 (a)Maximum permissible premium FSI - based on road SYSTEM width / TOD Zone. 9657.00 W4 5.18 3.00 02 (b) Proposed FSI on payment of premium. 0.00 W4 5.19 3.00 02 PARKING CALCULATIONS GATE 11. IN-SITU AND TDR LOADING W5 1.85 3.00 01 CAR SCOOTER CYCLE VISIT. PARKING 6.88 (a)In-situ area against D.P. road [2.0 x Sr. No. 2 (a)],if any 0.00 6.15 UNDERGROUND SOLID WASTE MANAGEMENT SYSTEM W5 2.11 3.00 07 Reqd Prop Reqd Prop Reqd Prop Reqd Prop (b) In-situ area against Amenity Space if handed over ENTRY/ EXIT 000.00 6.18 W5 2.50 3.00 01 NaN 61 NaN 41 0 0 0 0 [2.00 or1.85 x Sr. No. 4 (b)and /or(c)], OUTLET TO INSPECTION 7.10 W5 2.50 4.00 01 (c)TDR area 0.00 PARKING STATEMENT (d) Total in-situ / TDR loading proposed (11 (a)+(b)+(c)) 0.00 CHAMBER W6 25.47 4.00 01 SOAK PIT 10000 LTR C W7 5.18 4.60 02 SR.NO. FLOOR AREA IN SQ.MT. NO. OF CARS SAY 12. ADDITIONAL FSI AREA UNDER CHAPTER No. 7 REQUIRED REQUIRED PROVIDED 13. TOTAL ENTITLEMENT OF FSI SEPTIC TANK W8 3.68 4.60 10 (a) [9 + 10(b)+11(d)] or 12 whichever is applicable 12876.00 59 29.74 0.90 14.25 0.89 W9 2.11 4.60 01 1. 1 CAR PARKING 5785.70/100 = 57.86 CARS 58 CARS FOR 100 SQ.MT. B.U.A. (b) Ancillary FSI (upto 60%or80% with payment of charges) 2571.42 15.15 W10 4.37 4.60 02 D A W11 5.19 4.60 01 2. TWO WHEELER PARKING 5785.70/100 = 57.86 T.W. (c) Total entitlement (a+b) 15447.42 V 14. MAXIMUM UTILIZATION LIMIT OF F.S.I 1.40 1.58 1.40 D3 WC W11 7.19 4.60 02 1.80x1.25 (Building Potential) Permissible As Per Road Width 15447.42 3. TWO WHEELER PARKING = 41 T.W. 41 T.W. 18.44 W1 9.00 UP W1 2.30 {(Reg. No. 6.1 or 6.2 or 6.3 or 6.4 as applicable)x1.6 or 1.8} 6.03 M.S.LOFT IT UNIT-019 58 - 41 = 17 T.W. 6.60x3.51 12.15x3.51 RS 15. TOTAL BUILT-UP AREA IN PROPOSAL. 2.30 M.W. PASSAGE 0.90x2.11 2.85x2.11 4. COMPOSITE PARKING 17/6 = 2.83 CARS 03 (excluding area at sr.no.17 b) D1 D VOID16 1CAR FOR 6 TWO WHEELERS (a) Demolished Area. 0.00 3.30x1.05 5. TOTAL PARKING REQIURED (58 + 03 CARS) 61 61 7.45 (b) Existing Built-up Area. 5785.70 18.00 M.WIDE ROAD RS IT UNIT-020 (c) Proposed Built-up Area (as per 'P-line') 0.00 IT UNIT-030 LOBBY FRD PARKING PROVIDED 1.50 M.S.LOFT M.S.LOFT 5.07x5.60 FIRE TOWER 5.97x5.60 5.40x3.85 D1 (c) Total (b+c) 5785.70 4.03x5.60 4.03x5.60 2.85x4.20 2.10x4.20 UP IT UNIT-031 FLOOR STACK SURFACE TWO WHEELER 16. F.S.I. CONSUMED (15/13) FIRESTAIR1-4FL0 4.55x3.51 ITSS UNIT-018 PARKING PARKING PARKING 1.80 2.85x2.11 7.45x3.51 RS should not be more than serial No.14 above.) 2.00 M.W. PASSAGE 2.40 LOWER GR. FLOOR 38 23 41 T.W. 17. AREA FOR INCLUSIVE HOUSING, if any WC WC WC 1.80x1.25 1.80x1.25 1.80x1.25 TOTAL 61 CARS 41 T.W. (a) Required (20% of Sr.No.5) 000.00 0.75x2.65 0.75x2.65 D3 D3 D3 0.30x2.70 VOID8 VOID2 V V V VOID17 (b) Proposed 000.00 LIFT FIRE LIFT V D3 D3 V 1.50 1.50 2.40x2.70 2.40x2.70 V D3 CERTIFICATE OF AREA 1.50 WC WC 0.30 WC 1.80x1.25 1.80x1.25 1.80x1.25 CERTIFIED THAT THE PLOT UNDER REF. WAS SURVEYED ME & ITSS UNIT-017 THE DIMENSIONS OF THE SIDES, ETC. STATED ON THE PLAN M.S.LOFT M.S.LOFT ARE AS MEASURED ON THE SITE AND THE AREA SO WORKED IT UNIT-029 4.03x3.51 4.03x3.51 IT UNIT-021 IT UNIT-032 7.45x3.51 RS 5.97x3.51 4.55x3.51 OUT TALLIES WITH THE AREA STATED IN THE DOCUMENT OF RS 5.07x3.51 CITY SURVEY / TP RECORDS. 2.10x2.11 3.00x2.11 2.85x2.11 D1 7.45 D1 BUILT UP AREA CALCULATION OF IT SUPPORT SERVICE LEGEND 2.00 M.W. PASSAGE D1 D1 AT GROUND FLOOR (REVISED) IT UNIT-028 IT UNIT-022 IT UNIT-033 PLOT BOUNDARY SHOWN THICK BLACK RS 9.15 A 46.11 X 25.57 X 1 NO = 1179.03 SQ.MT. 5.97x3.51 5.07x3.51 4.55x3.51 ITSS UNIT-016 PROPOSED WORK SHOWN RED HATCHED 25.62 M.S.LOFT M.S.LOFT 3.00x2.11 2.10x2.11 2.85x2.11 7.45x3.51 RS B 7.45 X 21.96 X 1 NO = 163.60 SQ.MT. DRAINAGE LINE SHOWN RED DOTTED 4.03x3.51 4.03x3.51 I. TOTAL ADDITION = 1342.63 SQ.MT. WATERLINE SHOWN CYAN DOTTED WC WC WC 1.80x1.25 1.80x1.25 1.80x1.25 EXISTING TO BE RETAINED HATCHED BLUE 0.75x2.65 0.75x2.65 DEDUCTIONS D3 D3 D3 VOID1 VOID3 21.96 V V V DEMOLISHION SHOWN HATCHED YELLOW 1. 3.90 X 6.16 X 1 NO = 24.02 SQ.MT. OPEN TO SKY V D3 D3 V V D3 WC WC WC 2. 29.82 X 9.97 X 1 NO = 297.31 SQ.MT. ITSS UNIT-013 TO 1.80x1.25 1.80x1.25 1.80x1.25 VOID 7 0.90 X 1.40 X 1 NO = 1.26 SQ.MT. ITSS UNIT-018 M.S.LOFT M.S.LOFT ITSS UNIT-015 10.89 IT UNIT-027 IT UNIT-034 7.45x3.51 RS VOID 9 2.65 X 0.75 X 1 NO = 1.99 SQ.MT. 21.96 2.00 M.W. PASSAGE 4.03x3.51 4.03x3.51 IT UNIT-023 B 5.97x3.51 4.55x3.51 RS 5.07x3.51 VOID 10 2.65 X 0.75 X 1 NO = 1.99 SQ.MT. 2.00 M.W. PASSAGE 2.10x2.11 2.85x2.11 3.00x2.11 D1 OTS1 D1 VOID 14 1.25 X 0.90 X 1 NO = 1.12 SQ.MT. 9.15x10.89 VOID 15 1.25 X 0.90 X 1 NO = 1.12 SQ.MT. 16.29 43.87 VOID 11 2.65 X 0.90 X 1 NO = 2.39 SQ.MT. D1 D1 IT UNIT-035 VOID 12 2.65 X 0.90 X 1 NO = 2.39 SQ.MT. D1 4.55x3.51 ITSS UNIT-014 KITCHEN / VOID 13 2.65 X 0.90 X 1 NO = 2.39 SQ.MT. STORE ROOM / 2.85x2.11 7.45x3.51 RS M.S.LOFT 0.75x1.25 0.75x1.25 STAFF CHANGING II. TOTAL DEDUCTIONS = 335.98 SQ.MT. 12.09x5.35 54.21 12.09x5.35 WC WC VOID7 VOID4 57.08 1.05x3.51 1.40 2.85x2.11 1.80x1.25 1.80x1.25 TOTAL ITSS REVISED AT GR FLR. (I-II) = 1006.65 SQ.MT. 1.05x3.51 D3 D3 43.87 2.70x1.47 V V 2.85x2.11 1.50x2.97 7.89x4.47 1.50 2.40 2.40 1.50 D3 16.29 29.82 42.29 0.30 D3 1.50 3.30 3.30 WC LIFT LIFT UP WC JANITOR B 1.50 3.90 TOILET 1 1.25x1.80 2.40x2.70 2.40x2.70 3.90 0.30 1.25x ROOM ITSS UNIT-013 B D1 2.19x3.30 2.15 2.10x3.51 7.45x3.51 0.90 V RS WC TOILET VOID 7 1.40 1.50 1.50 D3 1.07x 4.13x1.25 WAY UP VOID6 VOID5 D3 1.57 6.16 NALA D3 D3 D3 TO W1 1.25x W1 1.25x 3.90 V D2 2 9.97 WC WC KITCHEN 1.35 1.21 D2 6.80 1.27x 1.27x 1.29x D1 PDR AREA 7.45 1.27 1.27 1.42 LOBBY 1 6.16 2.01x4.47 4.43x4.32 2.65 5.25x3.10 1.15x 2.50 M.W. PASSAGE 2.50 M.W. PASSAGE EXIT D UP 1.50 D1 1.25 2.65 1.25 2.65 2.65 2.65 2.65 1.25 2.65 1.25 2.65 2.65 6.00 VOID 9 VOID 10 VOID 14 VOID 11 VOID 15 VOID 12 VOID 13 0.75 0.75 0.75 0.75 0.75 0.75 0.75 0.90 0.90 0.90 0.90 0.90 VOID9 VOID10 VOID14 VOID11 VOID15 VOID12 VOID13 2.65 2.65 15.15 2.65x0.75 2.65x0.75 1.25x0.75 2.65x0.75 1.25x0.75 2.65x0.75 2.65x0.75 25.57 V V V V V V V V V V V V 1 1.40 BUILT UP AREA CALCULATION OF IT SUPPORT SERVICE AT GROUND FLOOR (APPROVED) BAR COUNTER WC WC WC WC WC WC WC WC WC WC 2.91x1.38 0.90 1.25x 1.25x 1.25x 1.25x 1.25x 1.25x 1.25x 1.25x 1.25x 1.25x A 46.11 X 15.45 X 1 NO = 712.40 SQ.MT. 1.80 1.80 1.80 1.80 1.80 1.80 1.80 1.80 1.80 1.80 25.57 1.8 B 15.15 X 25.77 X 1 NO = 390.42 SQ.MT. 15.60 D3 D3 D3 D3 D3 D3 D3 D3 D3 D3 ITSS UNIT-001 TO ITSS UNIT-012 I. TOTAL ADDITION = 1102.82 SQ.MT. A DEDUCTION D3 2.65 1. 0.90 X 1.40 X 1 NO = 1.26 SQ.MT. M.S.LOFT M.S.LOFT M.S.LOFT M.S.LOFT M.S.LOFT M.S.LOFT M.S.LOFT M.S.LOFT M.S.LOFT M.S.LOFT 2. 3.90 X 3.66 X 1 NO = 14.27 SQ.MT. ITSS UNIT-001 ITSS UNIT-003 ITSS UNIT-004 ITSS UNIT-005 ITSS UNIT-006 ITSS UNIT-007 ITSS UNIT-008 ITSS UNIT-009 ITSS UNIT-010 ITSS UNIT-011 ITSS UNIT-012 3.68x6.68 3.68x6.68 3.68x6.68 3.68x6.68 3.68x6.68 3.68x6.68 3.68x6.68 3.68x6.68 3.68x6.68 3.68x6.68 0.75 II. TOTAL ADDITION = 15.53 SQ.MT. 7.51x13.18 2.28x2.28 2.28x0.90 2.28x0.90 2.28x0.90 2.28x0.90 2.28x0.90 2.28x0.90 2.28x0.90 2.28x0.90 2.28x0.90 2.28x0.90 DUCT AREA CALCULATION 2.01x2.28 D1. 2.65 X 0.75 X 5 NOS = 9.94 SQ.MT. DUCT 25.77 15.60 D2. 1.25 X 0.75 X 2 NOS = 1.88 SQ.MT. DUCT 46.11 BUILDING LINE ABOVE BUILDING LINE ABOVE D3 2.65 D3. 0.75 X 2.65 X 2 NOS = 3.97 SQ.MT. DUCT AREA LINE DIAGRAM OF IT SUPPORT SERVICE AT GROUND FLOOR (REVISED) SCALE 1:200 D4. 0.75 X 1.25 X 1 NO = 0.94 SQ.MT. DUCT 0.75 D5. 1.25 X 1.21 X 1 NO = 1.51 SQ.MT. DUCT III. TOTAL DUCT AREA = 18.24 SQ.MT. ITSS UNIT-003 ITSS UNIT-004 ITSS UNIT-005 ITSS UNIT-006 ITSS UNIT-007 ITSS UNIT-008 ITSS UNIT-009 ITSS UNIT-010 ITSS UNIT-011 ITSS UNIT-012 3.68x12.60 3.68x12.60 3.68x12.60 3.68x12.60 3.68x12.60 3.68x12.60 3.68x12.60 3.68x12.60 3.68x12.60 3.68x12.60 ITSS APPROVED AT GR FLR. (I-II-III) = 1069.05 SQ.MT. 2.28x2.85 2.28x2.85 2.28x2.85 2.28x2.85 2.28x2.85 2.28x2.85 2.28x2.85 2.28x2.85 2.28x2.85 2.28x2.85 0.75 D4 1.25 3.66 2 1.25 D5 1.21 +0.30 3.90 OWNERS NAME & SIGN ARCH.NAME,SIGN & ADD M/s Industrial Esters and Apices Studio Pvt Ltd D1 D1 D2 D1 D2 D1 D1 0.75 0.75 0.75 0.75 0.75 0.75 0.75 RS RS RS RS RS RS RS RS RS RS RS Chemicals Private Limited 6.03 6.55 2.65 2.65 1.25 2.65 1.25 2.65 2.65 ARCH_ADD 46.11 BUILDING LINE ABOVE BUILDING LINE ABOVE OWNER_SIGN ARCH_SIGN D A ± 0.00 M LVL. C PROJECT INFORMATION 15.45 PLOT NO : KANSA-A-10,KANSA-A-9 USE : Industrial Buildings SUBUSE : IT / ITES 6.02 6.00 NODE : CTS/CS SECTOR NO : PLOT ADDRESS : CTS/CS:,Block No:,,Plot No:KAN SA-A-10,KANSA-A-9,Road/Street: GATE GATE ENTRY/ EXIT ENTRY/ EXIT PERMIT NO PERMIT_NO 58.91 INWARD NO SWC/6/521/2025 46.11 0317/1040409 GROUND FLOOR PLAN CC OBTAINED VIDE LETTER NO. EE/AMB/A-40656/of 2024,Dated: -11/02/2024. 38.00 M. W I D E R O A D AREA LINE DIAGRAM OF IT SUPPORT SERVICE AT GROUND FLOOR (APPROVED) KEY NO 0168 SCALE 1:100 SCALE 1:100 (GROUND+2ND FLOOR) SCALE 1:200 DATE 17-03-2025 SHEET NO 1/4 16.65 PROJECT TYPE - Building Development 17.79 7.50 8.64 6.36 D1 1.25 1.26 2 3 1.26 BUILT UP AREA CALCULATION OF IT SUPPORT SERVICE SEAL OF APPROVAL 0.75 AT SECOND FLOOR (REVISED) Digitally signed 0.90 0.60 8.64 A 49.11 X 17.10 X 1 NO = 839.78 SQ.MT. 4.67 4.67 2.42 B C 7.50 X 18.31 8.64 X 18.31 X X 1 NO 1 NO = = 137.33 SQ.MT. 158.20 SQ.MT. 0.60 RAMESH by RAMESH PANDITRAO 2.65 2.65 2.65 PANDITR D 8.64 X 11.14 X 1 NO = 96.25 SQ.MT. 2 D2 D2 2.65 1 ITSS 2 ITSS 3 VOID 6 2.65 2.65 VOID 1 ITSS 4 ITSS 5 E 6.36 X 18.31 X 1 NO = 116.45 SQ.MT. BUILT UP AREA CALCULATION OF IT SUPPORT SERVICE PATIL AUTH_SIGN 18.31 Date: ITSS 1 0.75 0.75 ITSS 2 AT SECOND FLOOR (APPROVED) 11.14 I. TOTAL ADDITION = 1348.01 SQ.MT. AO PATIL B C 0.90 0.90 D E A 17.79 X 25.19 X 1 NO = 448.13 SQ.MT. 18.31 2025.04.05 0.60 DEDUCTIONS A B 4.67 4.67 4.67 B 16.65 X 25.77 X 1 NO = 429.07 SQ.MT. 1. 0.60 X 2.65 X 2 NOS = 3.18 SQ.MT. 25.77 0.90 0.90 2. 0.60 X 1.26 X 1 NO = 0.76 SQ.MT. 25.19 0.60 I. TOTAL ADDITION = 877.20 SQ.MT. 16:11:50 +05'30' DEDUCTION 3. 0.90 X 1.26 X 1 NO = 1.13 SQ.MT. 2 2.65 2.65 D2 D2 2.65 1.40 1.40 2.65 1 VOID 8 VOID 2 4. 3.90 X 3.66 X 1 NO = 14.27 SQ.MT. 1. 4.05 X 7.22 X 2 NOS = 58.48 SQ.MT. BUILDING: A (A-9&10) 3.90 2. 0.60 X 2.65 X 3 NOS = 4.77 SQ.MT. VOID 6 0.90 X 2.65 X 1 NO = 2.39 SQ.MT. 0.75 0.75 3.66 II. TOTAL ADDITION = 63.25 SQ.MT. 2.41 4 VOID 8 0.90 X 1.40 X 1 NO = 1.26 SQ.MT. 4.05 4.05 0.60 DUCT AREA CALCULATION VOID 1 0.90 X 2.65 X 1 NO = 2.39 SQ.MT. 0.60 D1. 0.75 X 1.25 X 1 NO = 0.94 SQ.MT. DUCT VOID 2 0.90 X 1.40 X 1 NO = 1.26 SQ.MT. 2.65 2.65 1.25 2.65 1.25 2.65 2.65 D2. 0.75 X 2.65 X 4 NOS = 7.95 SQ.MT. DUCT VOID 15 2.65 X 0.90 X 1 NO = 2.39 SQ.MT. 2 2.65 1 7.22 7.22 1 VOID 15 VOID 11 VOID 16 VOID 12 VOID 17 VOID 13 VOID 14 D3. 1.25 X 1.36 X 1 NO = 1.70 SQ.MT. DUCT VOID 11 2.65 X 0.90 X 1 NO = 2.39 SQ.MT. 0.90 0.90 0.90 0.90 0.90 0.90 0.90 1.25 III. TOTAL DUCT AREA = 10.59 SQ.MT. VOID 16 1.25 X 0.90 X 1 NO = 1.12 SQ.MT. VOID 12 2.65 X 0.90 X 1 NO = 2.39 SQ.MT. D3 1.36 ITSS APPROVED AT 2ND FLR. (I-II-III) = 803.36 SQ.MT. VOID 17 1.25 X 0.90 X 1 NO = 1.12 SQ.MT. AREA LINE DIAGRAM OF IT SUPPORT SERVICE AT SECOND FLOOR (APPROVED) VOID 13 2.65 X 0.90 X 1 NO = 2.39 SQ.MT. SCALE 1:200 VOID 14 2.65 X 0.90 X 1 NO = 2.39 SQ.MT. 17.10 II. TOTAL DEDUCTIONS = 40.81 SQ.MT. ITSS 1 TOTAL ITSS REVISED AT 2ND FLR. (I-II) = 1307.20 SQ.MT. A C 0.58 31.39 0.75 M.W.CHAJJA PROJECTION D A 0.90 15.75 1.22 31.24 (ENC) BALCONY 49.11 DUCT 1.50x25.62 0.75x TOILET (ENC) BALCONY 1.50 AREA LINE DIAGRAM OF IT SUPPORT SERVICE AT SECOND FLOOR (REVISED) 1.00 M.W.PROJECTION 1.25 2.40x1.555 31.39x25.19 TOILET 1.50 M.W. PASSAGE SCALE 1:200 2.40x 3.67 M W PASSAGE 1.555 1.50 M.W. PASSAGE 3.67 D3 1.50 M.W.BALC. W2 LOBBY IT UNIT-07 D3 IT UNIT-23 W2 4.65x3.28 VOID9 7.85x2.70 D1 2.55x2.16 PROJECTION 2.55x1.575 3.30x1.05 3.51x3.86 5.49 D1 FRD FRD FIRE TOWER +10.45 M LVL. 1.50 2.00 M.W. PASSAGE 1.50 M.W.BALC. 4.80x2.10 1.50 M.W.BALC. PROJ. IT UNIT-12 DN LOBBY STORE ROOM D1 W3 D1 D1 UP 2.55x3.36 D1 FIRESTAIR1-4FL0 5.40x2.70 PROJECTION IT UNIT-06 4.89x5.08 3.54x1.95 IT UNIT-22 2.55x1.575 D3 D3 0.90x3.54 4.80 D3 2.55x1.575 W3 4.05x3.30 3.51x3.30 0.60 0.90 0.60x1.76 TOILET TOILET 2.40 5.70 TOILET TOILET 0.75x2.65 0.75x2.65 2.40x 2.40x1.575 VOID7 DUCT 2.40x1.555 0.30x2.70 VOID5 1.575 2.40x1.595 2.65 0.60x2.65 VOID10 LIFT FIRE LIFT 0.90 M.W.BALC. 1.50 1.50 2.40x2.70 2.40x2.70 1.50 0.30 D3 1.50 M.W.BALC. PROJ. TOILET TOILET TOILET ITSS UNIT-05 2.40x 2.40x1.60 ITSS UNIT-11 3.45 IT UNIT-16 2.40x1.60 ITSS UNIT-21 PROJECTION 2.55x1.61 1.60 2.55x1.61 W1 2.55x3.15 2.55x1.61 2.00 M.W. PASSAGE 3.51x3.36 4.05x3.36 4.89x3.36 4.89x4.90 W3 0.60x2.10 D3 D3 0.90x2.10 0.90x2.10 D3 W3 D1 D1 9.15 D1 D1 C 7.50 8.64 8.64 6.36 31.39 0.58 0.75 M.W.CHAJJA PROJECTION 4.67 1.50 M.W.BALC. D A 0.90 15.75 1.22 1.50 M.W.BALC. PROJ. 31.24 1.50 M.W.BALC. PROJECTION DUCT V W3 D1 D1 D1 D1 PROJECTION WC D3 ITSS UNIT-04 ITSS UNIT-10 ITSS UNIT-15 ITSS UNIT-20 0.75x (ENC) BAL 1.25 1.80x1.25 2.55x1.675 D3 D3 2.55x1.675 2.55x1.675 D3 D3 2.55x1.675 1.00 M.W.PROJECTION 25.19 3.51x3.55 W3 1.50 31.39x5.49 1.50 M.W. PASSAGE 4.05x3.55 4.89x3.55 4.89x3.55 IT UNIT-119 0.60x2.12 0.90x2.12 0.90x2.12 13.50x3.51 W2 TOILET TOILET TOILET 0.60 0.90 OPEN TO SKY TOILET 28.27 2.40x 1.50 M.W.BALC. PROJECTION LOBBY D1 0.75x2.65 2.85x2.11 2.40x1.725 2.40x1.725 0.75x2.65 1.725 2.40x1.725 VOID1 DUCT W4 VOID6 VOID14 7.85x2.70 2.65 1.50 M.W.BALC. 0.90 M.W.BALC. 3.30x1.05 5.49 0.60x2.65 W4 IT UNIT-130 2.00 M.W. PASSAGE 5.15x6.59 13.04 TOILET TOILET 1.50 M.W.BALC. PROJ. TOILET TOILET 3.45x5.19 1.50 M.W.BALC. PROJECTION FRD FRD FIRE TOWER +5.60 M LVL. 2.40x 2.40x1.725 1.50 IT UNIT-120 2.40x1.725 2.40x1.725 ITSS UNIT-03 1.725 ITSS UNIT-09 ITSS UNIT-14 18.31 18.31 11.14 18.31 6.20x4.94 2.55x1.575 2.55x1.575 2.55x1.575 W3 FIRESTAIR1-4FL0 DN UP LOBBY PROJECTION PROJECTION 3.05x3.60 4.05x3.45 D3 D3 4.89x3.45 OTS1 4.89x3.45 D3 D3 1.65 M.W. PASSAGE 5.40x2.70 D1 IT UNIT-118 0.60x2.08 0.90x2.08 9.15x13.04 0.90x2.08 ITSS UNIT-19 13.50x3.51 W2 W3 D1 D1 D1 D1 D3 2.55x1.575 2.85x2.11 3.51x3.45 1.50 WC 2.40 5.70 WC WC 4.67 0.75x2.65 1.80x1.25 D1 D1 1.80x1.25 0.75x2.65 VOID1 D3 D3 1.50 M.W.BALC. 0.30x2.70 VOID6 V V 2.00x1.25 V 2.65 VOID15 DUCT 1.50 M.W.BALC. PROJ. ITSS UNIT-08 2.00 M.W. PASSAGE 1.50x2.65 LIFT FIRE LIFT ITSS UNIT-02 D1 D1 ITSS UNIT-13 D1 ITSS UNIT-18 1.50 M.W.BALC. PROJECTION V V 1.50 1.50 V W3 2.85x1.575 D1 1.50 M.W. PASSAGE D3 2.40x2.70 2.40x2.70 D3 PROJECTION WC WC WC 1.50 D1 D1 0.30 2.55x1.575 D3 4.59x3.54 2.55x1.575 D3 D3 2.55x1.575 44.79 1.80x1.25 2.00x1.25 1.80x1.25 4.05x3.45 0.90x2.14 4.89x3.54 3.51x3.45 W3 3.45 0.60x2.14 3.84x2.24 0.90x2.14 W1 0.75x1.25 IT UNIT-117 TOILET TOILET 0.60x1.565 2.00 M.W. PASSAGE IT UNIT-129 IT UNIT-121 D3 TOILET 1.50 M.W.BALC. 13.50x3.51 W2 2.40x 2.10x1.725 3.04x1.36 TOILET VOID8 0.60 0.90 VOID2 2.40x1.91 5.15x3.51 6.20x3.51 D1 1.725 0.60x1.05 2.40x1.725 2.85x2.11 (ENC) BALCONY 0.45 0.75x 43.87 DUCT W5 3.45x2.11 3.05x2.11 9.15 1.25 DUCT PROJECTION W5 2.65 1.20 1.50x4.67 1.50 M.W.BALC. 0.90 M.W.BALC. 0.60x2.65 D3 WC WC 1.50 2.40 2.40 1.50 4.67 1.25x1.00 1.25x1.00 3.30 0.30 1.50 1.50 M.W. BALC. PROJ. D3 TOILET 3.30 TOILET DN WC LIFT LIFT UP D3 1.64x1.15 D3 1.50 M.W.BALC. PROJECTION 1.50 M.W.BALC. 2.40x1.91 B 2.40x 1.50 3.90 TOILET 3 1.25x1.80 2.40x2.70 2.40x2.70 3.90 0.30 WC D3 B (ENC) BALCONY 1.91 W3 2.19x3.30 1.50x25.62 W5 W5 ITSS UNIT-01 1.25x1.00 PROJECTION PROJECTION PROJECTION IT UNIT-128 IT UNIT-122 IT UNIT-116 D3 V D3 2.55x1.54 2.41 D1 ITSS UNIT-17 1.50 1.50 5.15x3.51 6.20x3.51 D1 25.19 13.50x3.51 W2 W3 4.05x3.60 D1 UP VOID4 DN VOID3 LADIES TOILET D3 2.55x1.54 1.36 3.45x2.11 3.05x2.11 2.85x2.11 0.60x2.11 DUCT 3.04x2.36 W1 D3 1.25x W1 1.25x 3.51x3.60 1.50 WC WC 1.35 1.21 D1 OPEN TO SKY 28.27 WC 0.75x2.65 1.80x1.25 D1 D1 1.80x1.25 0.75x2.65 VOID12 VOID2 (ENC) BALCONY V D3 V 2.00x1.25 D3 1.50 FRD 1.25 FRD V 2.65 DUCT 1.17x2.65 1.50x2.65 2.00 LOBBY 1.50 M.W.BALC. PROJECTION V V V 5.25x3.10 2.50 WC D3 WC WC D3 W5 2.50 M.W. PASSAGE 2.50 M.W. PASSAGE W5 13.04 D1 D1 1.80x1.25 2.00x1.25 1.80x1.25 13.86 13.94 IT UNIT-115 1.22 IT UNIT-127 IT UNIT-123 D3 2.65 2.65 1.25 2.65 1.25 2.65 2.65 1.50 M.W.BALC. 13.50x3.51 W2 OTS1 D1 0.75 0.75 0.75 0.75 0.75 0.75 5.15x3.51 6.20x3.51 2.85x2.11 D1 VOID15 D1 VOID11 D1 VOID16 D1 VOID12 VOID17 D1 VOID13 D1 VOID14 D1 (ENC) BALCONY 9.15x13.04 W5 3.45x2.11 3.05x2.11 W5 PASSAGE 2.65x0.75 2.65x0.75 1.25x0.75 2.65x0.75 1.25x0.75 2.65x0.75 2.65x0.75 PROJECTION 3.78x1.35 1.50x4.67 V V W.C. W.C. 4.67 D1 D3 1.25x1.20 1.25x 1.50 M.W.BALC. PROJECTION 1.20 1.50 M.W.BALC. D1 2.00 M.W. PASSAGE D3 D3 W5 W5 PROJECTION IT UNIT-126 IT UNIT-114 GENTS TOILET IT UNIT-124 D1 1.93x0.75 5.15x3.51 13.50x3.51 W2 6.20x3.51 1.50 M.W. PASSAGE D3 4.73x1.80 0.75x1.25 3.45x2.11 2.85x2.11 3.05x2.11 VOID13 1.50 WC VOID3 WC 3.20x3.66 WC 1.80x1.25 D1 0.75x 1.80x1.25 D3 V 2.00x1.25 D3 43.87 DUCT V 1.25 V 2.65 1.50x2.65 1.50 M.W.BALC. PROJECTION V D3 1.50 2.40 2.40 1.50 D3 WC 44.79 3.30 0.30 1.50 D1 D3 WC 3.30 IT UNIT-125 DN WC LIFT LIFT UP IT UNIT-113 1.80x1.25 1.25x B 5.15x3.51 1.50 3.90 TOILET 2 1.25x1.80 2.40x2.70 2.40x2.70 3.90 0.30 2.15 11.05x3.51 B 3.45x2.11 2.19x3.30 2.85x2.11 W2 V V (ENC) BALC. 1.50 M.W.BALC. 1.50x2.41 2.41 W5 1.50 UP VOID5 DN 1.50 VOID4 ITSS / KITCHEN BANQUET HALL-1 BANQUET HALL-2 PROJECTION W1 D3 1.25x W1 1.25x D1 17.10 9.45x12.60 19.26x15.90 19.80x15.90 17.10 1.35 1.21 2.72x3.30 1.84x0.90 3.78x0.90 0.90x1.87 4.71x0.90 4.71x0.90 (ENC) BALCONY 2.00 1.50 M.W.BALC. PROJECTION 1.50 M.W.BALC. PROJECTION 1.70x2.70 1.17x2.65 LOBBY 2.28x0.90 4.71x0.90 5.25x3.10 2.28x0.90 2.50 W5 2.50 M.W. PASSAGE 2.50 M.W. PASSAGE W5 13.86 13.94 2.65 2.65 1.25 2.65 1.25 2.65 2.65 0.75 0.75 0.75 0.75 0.75 0.75 D1 VOID11 D1 D1 VOID7 D1 D1 VOID16 D1 VOID8 D1 VOID17 D1 D1 VOID9 D1 D1 VOID10 D1 2.65x0.75 2.65x0.75 1.25x0.75 2.65x0.75 1.25x0.75 2.65x0.75 2.65x0.75 V V V V V V V V V V V V WC WC WC WC WC WC WC WC WC WC WC WC 1.25x 1.25x 1.25x 1.25x 1.25x 1.25x 1.25x 1.25x 1.25x 1.25x 1.25x 1.25x 1.80 1.80 1.80 1.80 1.80 1.80 1.80 1.80 1.80 1.80 1.80 1.80 D3 D3 D3 D3 D3 D3 D3 D3 D3 D3 D3 D3 1.50 (ENC) BAL 1.50 M.W.BALC. PROJECTION 1.50 M.W.BALC. PROJECTION 1.50 M.W.BALC. PROJECTION 1.50 M.W.BALC. PROJECTION 49.11x17.10 W6 W7 W7 1.50 46.11 1.50 49.11 IT UNIT-101 IT UNIT-102 IT UNIT-103 IT UNIT-104 IT UNIT-105 IT UNIT-106 IT UNIT-107 IT UNIT-108 IT UNIT-109 IT UNIT-110 IT UNIT-111 IT UNIT-112 D A C 5.18x13.95 3.68x13.95 3.68x13.95 3.68x13.95 3.68x13.95 3.68x13.95 3.68x13.95 3.68x13.95 3.68x13.95 3.68x13.95 3.68x13.95 5.18x13.95 3.78x2.85 2.28x2.85 2.28x2.85 2.28x2.85 2.28x2.85 2.28x2.85 2.28x2.85 2.28x2.85 2.28x2.85 2.28x2.85 2.28x2.85 3.78x2.85 SECOND FLOOR PLAN CC OBTAINED VIDE LETTER NO. EE/AMB/A-40656/of 2024,Dated: -11/02/2024. SCALE 1:100 (GROUND+2ND FLOOR) 17.10 17.10 OWNERS NAME & SIGN ARCH.NAME,SIGN & ADD M/s Industrial Esters and Apices Studio Pvt Ltd Chemicals Private Limited ARCH_ADD M.S.LOFT M.S.LOFT M.S.LOFT M.S.LOFT M.S.LOFT M.S.LOFT M.S.LOFT M.S.LOFT M.S.LOFT M.S.LOFT M.S.LOFT M.S.LOFT IT UNIT-101 IT UNIT-102 IT UNIT-103 IT UNIT-104 IT UNIT-105 IT UNIT-106 IT UNIT-107 IT UNIT-108 IT UNIT-109 IT UNIT-110 IT UNIT-111 IT UNIT-112 5.18x8.20 3.68x8.20 3.68x8.20 3.68x8.20 3.68x8.20 3.68x8.20 3.68x8.20 3.68x8.20 3.68x8.20 3.68x8.20 3.68x8.20 5.18x8.20 OWNER_SIGN ARCH_SIGN PROJECT INFORMATION PLOT NO : KANSA-A-10,KANSA-A-9 USE : Industrial Buildings SUBUSE : IT / ITES NODE : CTS/CS SECTOR NO : 1.50 (ENC) BAL 1.50 M.W.BALC. PROJECTION 1.50 M.W.BALC. PROJECTION 1.50 M.W.BALC. PROJECTION 1.50 M.W.BALC. PROJECTION 1.50 M.W.BALC. PROJECTION 1.50 M.W.BALC. PROJECTION 1.50 M.W.BALC. PROJECTION 1.50 M.W.BALC. PROJECTION 1.50 M.W.BALC. PROJECTION 1.50 M.W.BALC. PROJECTION 1.50 M.W.BALC. PROJECTION 1.50 M.W.BALC. PROJECTION 49.11x17.10 PLOT ADDRESS : CTS/CS:,Block No:,,Plot No:KAN W4 W3 W3 W3 W3 W3 W3 W3 W3 W3 W3 W4 SA-A-10,KANSA-A-9,Road/Street: 1.50 46.11 1.50 49.11 PERMIT NO PERMIT_NO D A C INWARD NO SWC/6/521/2025 0317/1040409 FIRST FLOOR PLAN CC OBTAINED VIDE LETTER NO. EE/AMB/A-40656/of 2024,Dated: -11/02/2024. KEY NO 0168 SCALE 1:100 SCALE 1:100 (GROUND+2ND FLOOR) DATE 17-03-2025 SHEET NO 2/4 29.89 16.22 PROJECT TYPE - Building Development BUILT UP AREA CALCULATION OF LOWER GROUND FLOOR 4.385 A 46.11 X 34.54 X 1 NO = 1592.64 SQ.MT. A SEAL OF APPROVAL I. TOTAL ADDITION = 1592.64 SQ.MT. 1 7.32 DEDUCTION Digitally signed 1. 2. 16.22 9.79 X 7.32 X 10.95 X X 1 NO 1 NO = = 118.73 SQ.MT. 107.20 SQ.MT. AREA LINE DIAGRAM OF U.G.TANK WITH PUMP ROOM 43.15 RAMESH by RAMESH PANDITRAO PANDITR SCALE 1:200 3. 1.22 X 5.70 X 1 NO = 6.95 SQ.MT. II. TOTAL ADDITION = 232.88 SQ.MT. AREA CALCULATION OF U.G.TANK WITH PUMP ROOM PATIL AUTH_SIGN Date: AO PATIL TOTAL BUA OF LOWER GR FLOOR (I-II) = 1359.76 SQ.MT. A 43.15 X 4.385 X 1 NO = 189.21 SQ.MT. I. TOTAL ADDITION = 189.21 SQ.MT. 2025.04.05 10.95 16:12:08 +05'30' 2 BUILDING: A (A-9&10) 34.54 A 9.79 34.54 3 5.70 1.22 10.57 D A C 46.11 31.24 16.65 1.22 0.58 450MM ELEVATIONAL PROJECTION AREA LINE DIAGRAM OF LOWER GROUND FLOOR SCALE 1:200 450MM ELEVATIONAL PROJECTION SLOPE SLOPE 1.50 PLOT NO. A-8 FIRE DUCT 3.30x1.05 +14.95 M LVL. TRAP +14.95 M LVL. 1.50 FIRE TOWER DOOR DN FIRESTAIR1-4FL0 -2.00 M LVL. 18.00 M.WIDE ROAD 2.40 5.70 -2.80 M LVL. NATURAL SLOPE LIFT FIRE LIFT -2.80 M LVL. 1.65 1.65 2.40x2.70 2.40x2.70 -2.00 M LVL. NATURAL SLOPE C 1.50 3.60 W1 15.15 ENTRY A D 9.15 1.58 8.22 3.75 6.47 UP 9.00 2.30 V2 FULL OPEN SC 31 SC 30 FOR -2.70 M LVL. VENTILATION ENTRANCE LOBBY OPEN TO SKY TERRACE OPEN TO SKY TERRACE SC 32 SC 29 450MM ELEVATIONAL PROJECTION 450MM ELEVATIONAL PROJECTION 8.85x1.55 2.45 ELECTRIC SUBSTATION 5.00 5.40x2.70 1.50 OPEN TO SKY 28.27 V1 (TRANSFORMER) FIRE TOWER SC 33 SC 28 METER UP ROOM 7.32 FIRESTAIR1-4FL0 SC 34 SC 27 7.55 13.04 2.40 10.25 SC 35 SC 26 5.00 OTS1 SC 25 LIFT FIRE LIFT 9.15x13.04 1.50 1.50 2.40x2.70 2.40x2.70 1.50 SC 36 0.30 SC 24 SLOPE DOWN UP 6.43 TO SC 37 LOWER 57 CP-L SC 23 V1 GROUND SC 38 PARKING SC SC SC SC 19.85 SC 22 56 CP-L 55 CP-L 20 19 18 17 V1 SC 39 SC 21 SC 40 54 CP-L 10.95 45.39 1.50 2.40 2.40 1.50 3.30 0.30 1.50 SC 41 -4.05 M LVL. 3.30 DN TRAP LIFT LIFT TRAP 4.00 M.W. DRIVEWAY B 3.81 1.50 3.90 DOOR 2.40x2.70 2.40x2.70 DOOR 3.90 0.30 3.81 B V1 1.50 DN 1.50 W1 W1 CP-L 58 SC 10 SC 11 SC 12 SC 13 SC 14 SC 15 SC 16 53 CP-L 6.20 6.05 4.00 M.W. DRIVEWAY 4.50 M.W. DRIVEWAY 49 CP-L 51 CP-L 34.54 V1 CP-L 59 52 CP-L 8.57 48 CP-L 50 CP-L V1 01 SC CP-L-2[MECH] CP-L-2[MECH] CP-L-2[MECH] CP-L-2[MECH] CP-L 60 SC 09 5.70 07 05 02 SC B SC LIFT LIFT SC B CP-L 61 47 2.40x2.70 2.40x2.70 03 SC 46 44 42 40 CP-L 08 06 45 43 41 39 04 SC NALA SC SC 1.22 V1 OPEN TO SKY TERRACE OPEN TO SKY TERRACE 17.70 5.00 M.W. DRIVEWAY -4.05 M LVL. 5.00 M.W. DRIVEWAY -4.05 M LVL. 5.00 M.W. DRIVEWAY 10.57 V1 37 35 33 31 29 27 25 23 21 19 17 15 13 11 09 07 05 03 01 38 36 34 32 30 28 26 24 22 20 18 16 14 12 10 08 06 04 02 CP-L-2[MECH] CP-L-2[MECH] CP-L-2[MECH] CP-L-2[MECH] CP-S-2[MECH] CP-S-2[MECH] CP-S-2[MECH] CP-S-2[MECH] CP-S-2[MECH] CP-S-2[MECH] CP-S-2[MECH] CP-S-2[MECH] CP-S-2[MECH] CP-S-2[MECH] CP-S-2[MECH] CP-S-2[MECH] CP-S-2[MECH] CP-S-2[MECH] CP-S-2[MECH] V1 V1 V1 V1 V1 SLOPE SLOPE 46.11 50.31 D A C PUMP ROOM FIRE FIGHTING WATER TANK DOMESTIC WATER TANK 4.385 TERRACE FLOOR PLAN CC OBTAINED VIDE LETTER NO. EE/AMB/A-40656/of 2024,Dated: -11/02/2024. NATURAL SLOPE NATURAL SLOPE SCALE 1:100 (GROUND+2ND FLOOR) 43.15 OWNERS NAME & SIGN ARCH.NAME,SIGN & ADD M/s Industrial Esters and Apices Studio Pvt Ltd Chemicals Private Limited ARCH_ADD D A C OWNER_SIGN ARCH_SIGN PROJECT INFORMATION PLOT NO : KANSA-A-10,KANSA-A-9 USE : Industrial Buildings SUBUSE : IT / ITES NODE : CTS/CS SECTOR NO : PLOT ADDRESS : CTS/CS:,Block No:,,Plot No:KAN SA-A-10,KANSA-A-9,Road/Street: PERMIT NO PERMIT_NO INWARD NO SWC/6/521/2025 0317/1040409 KEY NO 0168 1:100 LOWER GROUND FLOOR PLAN CC OBTAINED VIDE LETTER NO. EE/AMB/A-40656/of 2024,Dated: -11/02/2024. 38.00 M.WIDE ROAD SCALE SCALE 1:100 (GROUND+2ND FLOOR) DATE 17-03-2025 SHEET NO 3/4 PROJECT TYPE - Building Development TERRACE OPEN TO SKY 1.20 1.20 TER FLR + 14.95 M TER FLR + 14.95 M SEAL OF APPROVAL Digitally signed 1.50 M.W.BALC. PROJ. 4.50 4.50 RAMESH by RAMESH PANDITRAO ITSS / KITCHEN GENTS TOILET WC PASSAGE ITSS UNIT-01 TOILET TOILET ITSS UNIT-02 ITSS UNIT-03 TOILET TOILET ITSS UNIT-04 ITSS UNIT-05 TOILET TOILET ITSS UNIT-06 ITSS UNIT-07 TOILET PANDITR PATIL AUTH_SIGN 2ND FLR + 10.45 M 2ND FLR + 10.45 M Date: AO PATIL FRONT OPEN SPACE ( PLOT BOUNDARY ) 1.50 2025.04.05 14.95 14.95 16:12:28 +05'30' LOFT 4.85 4.85 1.50 M.W.BALC. PROJ. 1.00 M.W.BALC. PROJ. BUILDING: A (A-9&10) VOID PLOT BOUNDARY ( REAR SIDE ) 3.20 4.52 5.18 IT UNIT-102 WC PASSAGE IT UNIT-125 IT UNIT-126 IT UNIT-127 IT UNIT-128 IT UNIT-129 IT UNIT-130 17.75 1ST FLR + 5.60 M 1ST FLR + 5.60 M 1.50 LOFT LOFT LOFT LOFT LOFT LOFT 1.20 TER FLR +14.95M 6.02 5.30 5.30 KITCHEN / ROAD STORE ROOM / 6.18 ITSS UNIT-001 @ +0.30 M 0.30 STAFF CHANGING TOILET 4.50 GROUND FLOOR GR.LVL 0.00 M GR.LVL 0.00 M IT UNIT-027 IT UNIT-028 0.30 4.35 2.80 @ -1.05 M @ -1.05 M IT UNIT-029 IT UNIT-030 @ -1.45 M @ -1.45 M 2ND FLR +10.45M (U/G)TANK(1) 4.05 PLOT BOUNDARY ( NALA SIDE ) GR.LVL -2.80 M LOWER GROUND FOR LOWER GROUND FOR 4.85 PARKING @ -4.05 M PARKING @ -4.05 M 14.95 SECTION - DD CC OBTAINED VIDE LETTER NO. EE/AMB/A-40656/of 2024,Dated: -11/02/2024. SCALE 1:100 (GROUND+2ND FLOOR) 1ST FLR +5.60M 1.20 1.20 TER FLOOR + 14.95 M TERRACE OPEN TO SKY TERRACE OPEN TO SKY TERRACE OPEN TO SKY 5.30 6.03 6.55 1.50 M.W.BALC. PROJ. 4.50 4.50 0.30 GR.LVL 0.00 M STORE 14.95 PASSAGE ROOM IT UNIT-16 ITSS UNIT-15 ITSS UNIT-14 ITSS UNIT-13 LADIES TOILET PASSAGE BANQUET HALL-2 2ND FLOOR + 10.45 M FRONT SIDE ELEVATION CC OBTAINED VIDE LETTER NO. EE/AMB/A-40656/of 2024,Dated: -11/02/2024. FRONT OPEN SPACE ( PLOT BOUNDARY ) SCALE 1:100 (GROUND+2ND FLOOR) 1.50 LOFT 4.85 4.85 1.50 M.W.BALC. PROJ. VOID 3.20 6.10 4.50 PLOT BOUNDARY ( REAR SIDE ) IT UNIT-119 IT UNIT-118 IT UNIT-117 IT UNIT-116 IT UNIT-115 IT UNIT-114 IT UNIT-113 PASSAGE WC IT UNIT-110 1ST FLOOR + 5.60 M 1.50 1.50 1.50 LOFT LOFT 5.30 5.30 6.00 6.20 6.20 6.65 6.65 3.65 7.05 7.05 ROAD 5.40 6.15 WC PASSAGE ITSS UNIT-010 @ +0.30 M GR.LVL 0.00 M IT UNIT-035 JANITOR ROOM GR.LVL 0.00 M IT UNIT-033 IT UNIT-034 @ -0.60 M @ -0.60 M ITSS UNIT-019 IT UNIT-031 IT UNIT-032 @ -1.05 M @ -1.05 M 4.35 TRAP TRAP @ -1.45 M @ -1.45 M @ -1.45 M DOOR DOOR 1.20 TERRACE OPEN TO SKY TERRACE 1.20 TERRACE OPEN TO SKY 1.20 TER FLR + 14.95 M @ +14.95 M @+14.95M TER FLOOR + 14.95 M 2.33 2.33 28 28 GR.LVL -2.80 M 26 27 27 26 25 25 24 24 23 23 22 22 2.25 2.25 LOWER GROUND FOR 21 4.50 21 1.50 M.W.BALC. PROJ. 20 20 PARKING @ -4.05 M 19 18 18 19 1.50 M.W.BALC. PROJ. R =161MM 17 17 R =161MM 16 16 T =300MM 15 15 T =300MM 4.50 4.50 4.50 14 14 2.25 2.25 13 13 12 12 SECTION - CC CC OBTAINED VIDE LETTER NO. EE/AMB/A-40656/of 2024,Dated: -11/02/2024. 8 9 10 11 R =161MM T =300MM R =161MM T =300MM 11 10 9 8 WC 2.25 2.25 7 7 SCALE 1:100 (GROUND+2ND FLOOR) 6 6 5 5 4 4 ITSS UNIT-01 PASS ITSS UNIT-08 3 3 LADIES TOILET PASS ITSS UNIT-17 2ND FLR + 10.45 M 2 1 @ +10.45 M TOILET WC @ +10.45 M 30 1 2 2ND FLOOR + 10.45 M LIFT VOID LIFT VOID 2.26 2.26 29 29 28 28 27 27 PLOT BOUNDARY ( 18.0M W ROAD SIDE ) 26 26 25 25 14.95 1.50 M.W.BALC. PROJ. 24 24 2.43 2.43 23 23 22 22 4.85 21 21 1.50 M.W.BALC. PROJ. 20 20 19 19 18 18 R =162MM R =162MM PLOT BOUNDARY ( NALA SIDE ) 17 17 4.85 16 16 4.85 4.85 T =300MM T =300MM 2.43 2.43 15 15 14 14 13 13 12 12 4.53 10 11 R =162MM R =162MM 11 10 WC 5.30 9 9 T =300MM T =300MM 2.43 2.43 8 8 7 7 6 6 5 5 4 4 IT UNIT-125 PASS IT UNIT-130 3 3 IT UNIT-113 1ST FLR + 5.60 M 2 1 @ +5.60 M TOILET WC @ +5.60 M 32 1 2 1ST FLOOR + 5.60 M 2.62 2.62 32 31 31 30 30 29 29 28 28 1.50 27 27 26 R =166MM R =166MM 26 25 25 2.65 2.65 T =300MM T =300MM 5.30 LOFT 24 23 23 24 22 22 21 21 20 20 19 19 R =166MM 18 18 R =166MM 17 17 T =300MM 16 16 T =300MM 15 15 2.65 2.65 6.03 6.80 6.20 14 14 13 13 6.20 12 12 11 11 10 10 4.55 9 9 2.65 2.65 8 8 ROAD 7 7 5.60 6 6 5 5 4 4 3 3 2 2 1 @ +0.30 M TOILET WC @ +0.30 M 1 GR.LVL 0.00 M WAY TO JANITOR GR.LVL 0.00 M WC @ -0.60 M KITCHEN PDR AREA WC ROOM ITSS UNIT-013 @ -0.60 M TRAP DOOR 1.20 1.20 TER FLR + 14.95 M TERRACE OPEN TO SKY @+14.95M 27 TERRACE TER FLOOR + 14.95 M 4.35 4.35 26 25 24 23 22 21 R =166MM 20 19 @+13.45M 1.50 M.W.BALC. PROJ. T =300MM 18 LOWER GROUND FOR LOWER GROUND FOR 16 17 PARKING @ -4.05 M PARKING @ -4.05 M 15 4.50 4.50 14 13 12 R =166MM OPEN TO SKY @+11.95M 10 11 T =300MM 9 LIFT 8 7 6 5 SECTION - BB CC OBTAINED VIDE LETTER NO. EE/AMB/A-40656/of 2024,Dated: -11/02/2024. 4 BANQUET HALL-1 LOBBY 3 PASS SCALE 1:100 (GROUND+2ND FLOOR) 2 @+10.45M 2ND FLR + 10.45 M 1 @+10.45M 2ND FLOOR + 10.45 M LIFT VOID 27 26 FRONT OPEN SPACE ( PLOT BOUNDARY ) 25 24 23 1.50 14.95 22 21 14.95 @+8.83M 20 R =179MM LOFT 19 18 T =300MM 17 16 VOID 15 4.85 4.85 1.50 M.W.BALC. PROJ. 14 13 VOID PLOT BOUNDARY ( REAR SIDE ) 12 R =179MM 11 @+7.22M 10 3.20 4.50 T =300MM 9 6.10 8 LIFT 7 17.75 6 5 IT UNIT-106 WC LOBBY 4 2 3 PASS @+5.60M 1ST FLR + 5.60 M 30 1 @+5.60M 1ST FLOOR + 5.60 M 29 28 27 26 1.50 25 1.50 24 23 1.00 LOFT R =176MM 22 21 @+3.83M OWNERS NAME & SIGN ARCH.NAME,SIGN & ADD T =300MM 20 19 M/s Industrial Esters and Apices Studio Pvt Ltd 18 16 17 Chemicals Private Limited 5.30 5.30 ARCH_ADD 15 14 6.00 13 R =177MM @+2.07M 12 T =300MM 3.65 11 10 9 8 ROAD 7 6 LIFT 5 7.10 ITSS UNIT-006 @ +0.30 M LIFT 4 OWNER_SIGN ARCH_SIGN 0.30 3 WC LOBBY @ +0.30 M 2 @+0.30M GROUND FLOOR 1 18 PROJECT INFORMATION GR.LVL 0.00 M 17 GR.LVL 0.00 M 15 16 PLOT NO : KANSA-A-10,KANSA-A-9 14 USE : Industrial Buildings 4.35 13 0.30 12 11 @-1.20M 9 10 R =166MM SUBUSE : IT / ITES 2.80 NODE : CTS/CS 8 T =300MM (U/G)TANK(1) 7 6 4.35 5 SECTOR NO : 4.05 4 3 2 PLOT ADDRESS : CTS/CS:,Block No:,,Plot No:KAN @ -2.70 M 1 GR.LVL -2.80 M SA-A-10,KANSA-A-9,Road/Street: LOWER GROUND FOR LOWER GROUND FOR PERMIT NO PERMIT_NO PARKING @ -4.05 M PARKING @ -4.05 M INWARD NO SWC/6/521/2025 0317/1040409 1.50 KEY NO 0168 SCALE 1:100 SECTION - AA CC OBTAINED VIDE LETTER NO. EE/AMB/A-40656/of 2024,Dated: -11/02/2024. DATE 17-03-2025 SHEET NO SCALE 1:100 (GROUND+2ND FLOOR) 4/4