APICES s t u d i o p v t . l t d. FORM 1 ARCHITECT'S CERTIFICATE Date: 18/03/2025 To, SOHAM INFRASTRUCTURE (Through its Partner Anek Gobind Rajani) Project Name : Raga’s TIMES SQUARE MahaRERA Registration Number : P51700055192 Shop no 7, A wing, Nikku Palace, Station Road, O.T. Section, Ulhasnagar 421003 SUBJECT: Certificate of Percentage of Completion of Construction Work of Raga’s TIME SQUARE having Maha Rera Registration Number P51700055192 being developed by SOHAM INFRASTRUCTURE (Through its Partner Anek Gobind Rajani) Sir, I Mr. SUDHIR THORAT have undertaken assignment as Architect of certifying Percentage of Completion of Construction Work of Raga’s TIME SQUARE having Maha RERA Registration number P51700055192 being developed by SOHAM INFRASTRUCTURE (Through its Partner Anek Gobind Rajani) Based on Site Inspection, with respect to the Building of the aforesaid Real Estate Project, I certify that as on the date of this certificate, th e Percentage of Work done for the building of the Real Estate Project under MahaRERA is as per table A herein below. The percentage of the work executed with respect to each of the activity of the entire phase is detailed in Table B. CIN : U 74210 MH 2004 PTC 148855 GST. No. 27AAACZ2153L1Z4 TEL : 2587 07 01 / 2 / 3 / 4 / 5 / 6 admin @ apices.in www.apices.in Reg Off : 203,204,205, Lodha Supremus -I, Road no.22 Wagle Estate, Thane (W) 400 604. Table A Lavout/Building/Wing Number Raga’s TIMES SQUARE (to be prepared separately for each Layout /Building /Wing of the Project) Sr. No Tasks /Activity Percentage of work done 1 Excavation 100% 2 Basements (if any) 100% 3 Podiums (if any) NA 4 Plinth 100% 5 Ground Floor / Stilt floor 100% 6 3 Slabs of Super Structure 100% 7 Internal walls, Internal Plaster, 75% Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises 8 Sanitary Fittings within the Flat/Premises, 0% Electrical Fittings within the Flat/Premises 9 Staircases, Lifts Wells and Lobbies 90% at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks 10 The external plumbing and external plaster, 0% elevation, completion of terraces with waterproofing of the Building/Wing 11 Installation of lifts, water pumps, 40% Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of sale. TABLE-B Common Areas (Internal & External Development Works) in Respect of the Registered Phase/project number Common areas Proposed Percentage of S.No and Facilities, Details (Yes/No) Work done Amenities Internal Roads & - 30% 1. Footpaths - 0% 2. Water Supply Sewerage line - 3. (chamber, lines, 40% septic tank,STP) Storm Water - 4. 0% Drains - Landscaping & 30% 5. Tree Planting - NA 6. Street Lighting 7. Community - NA Buildings Treatment and disposal of 80% 8. - sewage and sull age water Solid Waste 9. management & 80% - Disposal Water conservation 0% 10. and rain water - harvesting Energy NA 11. - management Fire protection and fire safety - 50% 12. requirements Electrical meter 13. room, sub-station, - 0% receiving station Others – Ug Tank & 14. 100% Pump Room Civil - Work Yours Faithfully Sudhir Digitally signed by Sudhir Janardan Thorat DN: c=IN, o=Personal, postalCode=400602, l=Thane, st=Maharashtra, street=A-1202 Shreeji Ville Panchpakhadi, Thane, Thane Janardan Maharashtra India- 400602- opp Nitin Company, title=7476, 2.5.4.20=c8bc3cff8d3dab87efe9d52bc8115a4 d9fd0d055f587abd517a58057b164f8ad, serialNumber=6416be833957c8712a580844f Thorat 9b75afbe8a14866914849d0c2ff762baae82d4 2, email=sudhir@apices.in, cn=Sudhir Janardan Thorat Date: 2025.03.19 12:26:46 +05'30' Architect Sudhir Thorat APICES Studio Pvt.Ltd. Agreed and Accepted by: FOR SOHAM INFRASTRUCTURE Anek Gobind Rajani Partner Date: 18th March, 2025 Place: Ambernath.