If ouzi k Assnri al.rls 72 I 73,3rd Nizampur, Bhiwandi, Dist. Thane - 421 302 Email:fouziandassociates@yahoo.co.in Rel Da.te: / / ZO FORM-2 [See Regulation 3] ENG I N EER'S CERTIFICATE (To be submitted at the time of Registration of Ongoing Project and for withdrawal of Money from Designated Account- Project wise) Date:30/06/2077 To, The,DAMJI HARI INFRASTRUCTURE PW LTD UNIT NO. 423,4TH FLOOR ,,THE SUMMIT BUSINESS BAY" PRAKASHWADI, ANDHERI EAST BEHIND GURUNANAK PETROL PUMP, OPP. CINEMAX OFF. ANDHERI KURLA ROAD Mumbai400093 Subject : Certificate of Cost Incurred for Development of PENTAGON ENCALVE for Construction of Type - 1 of the Phase ( MahaRERA Registration Number) situated on the Plot bearing C.N. NO./CTS No/SURVEY NO./ Final Plot No.38/1 (p) ,38/1-(p1,38/3 demarcated by its boundaries (latitude and longitude of the end points) SURVEY NO. 37, RUKMA UDYOG NAGAR to the North SERVICE ROAD 12 MTR to the South NATIONAL HIGHWAY lll. to the East PLOT NO. 2 OF TOTAL APPROVED LAYOUT to the West of Kokan- Division, Village Asangaon Taluka Shahapur District Thane PIN 42L601 admeasuring _8880.00_sq.mts. area being developed by IPromoter] Ref : MahaRERA Registration Number Sir, l/ We Alim A.K. Fouzi have undertaken assignment of certifying Estimated Cost for the Subject Real Estate Project proposed to be registered under MahaRERA, being Type-L Building Single Wing of the Phase situated on the plot bearing C.N. No./CTS No./Survey No./ Final Plot No. 38/1 (p) ,38/1(p) ,38/3 of Division-Kokan, Village Asangaon Taluka Shahapur District Thane,PlN 42'J,60ladmeasuring 8880.00 sq.mts. area being developed by [Owner/Promoter] Following technical professionals are appointed by Owner / Promoter :- (i) Shri Alim A.K. Fouzias L.S. /Architect; If ouzi k Assnrt afus 72 I 73,3rd Nizampur, Bhiwandi, Dist, Thane - 421 302 Email:fouziandassociates@yahoo.co.in R"l t DaA: /zo (ii) Shri Majid Dhokle as Structural Consultant (iii) Shri as MEP Consultant (iv) Shri Prashant Mashilkar as Site Surveyor * We have estimated the cost of the completion to obtain Occupation Certificate/ Completion Certificate, of the Civil, MEP and Allied works, of the Building(s) of the project. Our estimated cost calculations are based on the Drawings/plans made available to us for the project under reference by the Developer and Consultants and the Schedule of items and quantity for the entire work as calculated by Mr.Prashant Mashilkar quantity Surveyor* appointed by Developer/Engineer, and the assumption of the cost of material, labour and other inputs made by developer, and the site inspection carried out by us. 3. We estimate Total Estimated Cost of completion of the building(s) of the aforesaid project under reference as Rs. 2280.00 {Lacs) (Total Proiect). The estimated Total Cost of project is with reference to the Civil, MEP and allied works required to be completed for the purpose of obtaining occupation certificate / completion certificate for the building(s) from the Town Planning Thane being the Planning Authority under whose jurisdiction the aforesaid project is being implemented. 4. The Estimated Cost Incurred till date is calculated at Rs.319.07 lacs (Total Project _. The amount of Estimated Cost Incurred is calculated on the base of amount of Total Estimated Cost. 5. The Balance cost of Completion of the Civil, MEP and Allied works of the Building(s) of the subject project to obtain Occupation Certificate / Completion Certificate from Town Planning Thane (planning Authority) is estimated at Rs. 1960.93/- lacs 5. I certify that the Cost of the Civil, MEP and allied work for the aforesaid Project as completed on the date of this certificate is as given in Table A and B below : Tngle A Building /Wing bearing called PENTA COMPLEX (Type 1-) (to be prepared separately for each Building /Wine of the Real Estate Project) Sr. No Particulars Amounts (Rs. In lacs) (1) (21 (3) Total Estimated cost of the building/wing as on Rs. 562.48[ 30.06.2017 date of Registration is Cost incurred as on 3O.O6.2OL7 (based on the Rs. Nil /- Estimated cost ) If ouzi k Asssri al.rls 72l73,3rd Nizampur, Bhiwandi, Dist. Thane - 421 302 Email:fouziandassociates@yahoo.co.in R4 /za Work done in Percentage (as Percentage ofthe estimated cost ) Balance Cost to be Incurred (Based on Estimated Cost) 5 Cost lncurred on Additionol /Extro ltems os on 30.06.20L7 not included in the Estimated Cost (Annexure A) TneLe B Sr. No. Particulars Amounts (Rs.ln Lacs) (1) (21 (3) Total Estimated cost ofthe Internal and External Rs. 2280.00/- Development Works including amenities and Facilities in the layout as on 30.06.2017 date of Registration is (1) (21 (3) Cost incurred as on 3O.O6.2OL7 (based on the Estimated cost). Work done in Percentage (as Percentage of the estimated cost). Balance Cost to be Incurred (Based on Estimated Cost). Cost Incurred on Additional /Extra ltems as on not included in the Estimated Cost (Annexure A). Yours Faithfully, Signature bf Engineer. (Licence No.Str. Eng./Ll If ouzi k Assnri atts 72 | 73,3rd Nizampur, Bhiwandi, Dist. Thane - 421 3O2 Email:fouziandassociates@yahoo.co.in R4.' Da*: / / zo Note: 1. The scope of work is to complete entire Real Estate Project as per drawings approved from time to time so as to obtain Occupation Certificate/Completion Certificate. 2. (*) Quantity survey can be done by office of Engineer or can be done by an independent Quantity Surveyor, whose certificate of quantity calculated can be relied upon by the Engineer. In case of independent quantity surueyor being appointed by Developer, the name has to be mentioned at the place marked (*) and in case quantity are being calculated by office of Engineer, the name of the person in the office of Engineer, who is responsible for the quantity calculated should be mentioned at the place marked (*). 3. The estimated cost includes all labour, material, equipment and machinery required to carry out entire work. 4. As this is an estimated cost, any deviation in quantity required for development of the Real Estate Project will result in amendment of the cost incurred / to be incurred. 5. All components of work with specifications are indicative and not exhaustive. Annexure A List of Extra/Additional ltems executed with Cost (which were not part of the original Estimate of Total Cost)