7 % Aj3j3uri&ipg Consulting Licensing, Planning Engineer & RCC Consultants Shop No.101& 102,1st Floor, Konark Arcade, Beside New Municipal Corporatoin Opp. Tahsildar Office, Bhiwandi421 302. Email:fouziandassociates@gmail.com 72et .' 7)dif e : / / 20 FORM 1 [See Regulation 3] ARCHITECT'S CERTIFICATE TO, Date: 31-12-2021 The DamjiHari lnfrasti.ucture Put Ltd Unit 423, 4th Floor, The Summit Business Bay, Behind Gurunanak Petrol Pump, Opp. Cinemax, Prakash wadi, Andheri East (E) Mumbai 400 093 Subject: Certificate of Percentage of Completion of Construction Work of Type-3, Building, Single Wing of the Single Phase of the Project P51700010181 situated on the Plot bearing Survey No. 38/1(p), 38/3, Plot No. - 1, demarcated by its boundaries (latitude and longitude of the end points) S.No.39 & 207 to the North Service Road 12.0 mtr. To the South CFC Plot No. 5 to the East open space plot on S.No. 38/1(p)to the West of Division, Village-Asangaon, Taluka- Shahpur, District-Thane, PIN-421601, admeasur.ing 8880 sq.mts. Area being developed by MAHADEV DAMJI PATEL Sir, I AlimA.K.Fouzi have undertaken assignment as Architect of certifying Percentage of Completion of Construction Work of the Type -3Building, Single Wing of the Single Phase of the Project, situated on the plot bearings.No. 38/1(p), 38/3, Plot No. 1 of Division-Kokan, Village -Asangaon, Taluka-Shahpur, District-Thane, PIN-421601, admeasuring 8880 sq.mts,Area being developed by MAHADEV DAMJI PATEL. 1. Following technical professionals are appointed by owner / Promoter:- Shri Alim A.K. Fouzi as L.S. / Architect; Shri Majid Dhokle as Structural Consultant Shri as MEP Consultant Shri Prashant Mahiskar as Site Supervisor 1 I page ffmtzt % Aj3gurittlpg Consulting Licensing, Planning Engineer & RCC Consultants Shop No.101& 102,1st Floor, KonarkArcade, Beside New Municipal Corporatoin Opp. Tahsildar Office, Bhiwandi421 302. Email:fouziandassociates@gmail.com 7a4 .. 7)crfe : `3| / 12 / 202.I Ba.sed on Site Inspection, with respect to each of the Building/Wng of the aforesaid Real Estate Project , I certify that as on the date of this certificate, the Percentage of Work done for each of the buildingIving of the Real Estate Project as registered v/.de number P51700010181 under MahaRERA is aspertableAt`ereinbelow.Thepercentageofthewoi.kexecutedwithrespecttoeachoftheactivityof the entire phase is detailed in Table 8. TABLE-A /Wing otfthe h Llroiect) P ' t) Bull ding /Wing Number Type-3 (to be prepared separately for each BuildingTask/Activity Percentage of Work Sr NO. done(3) (2) (1) loo 1.2.3 Excavation 100 One Number of PlinthNumberofpodiumsStiltFloor 100 4. 100 5.6. Eight number of Slabs of Super StructureInternalWalls,InternalPlaster,Floorings within Flats/Premises, Doors 65 d W.ndows anISanitary towithin Fittings each the of the Flat Premises. Flat/Premises, Electrical Fittiiigs within theFlat/Premises 0.0 7. 65 8. Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.Theexternalplumbingandexternalplaster,elevation,completion of 65 9. terraces with waterproofing of the Building/Wing.Installationoflifts,waterpumps,FireFighting Fittings and 0.0 10. Equipment as per CFO NOC, Electrical fittings to Common Areas,electro,mechanicalequipment,Compliancetoconditionsof environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, baving of areas appurtenant to Building/Wing, CompoundWallandallotherrequirementsasmayberequiredtoobtain Occupation / Completion Certificate. 2 I page ffouzt & Aggori;=i=`'"" Consulting Licensing, Planning Engineer & RCC Consultants Shop No.101& 102,1st Floor, Konark Arcade, Beside New Municipal Corporatoin Opp. Tahsildar Office, Bhiwandi-421 302. Email:fouziandassociates@gmail.com 7a4 .. Dcke : :J| / 12. / Bog_I TABLE-B Internal and External Development Works in respect of the entire Registered Phase. Sr.No. Common areas Proposed Percentage of Details (1) and Facilities, (Yes/ No) work done (5) Amenities (2) (3) (4) 1. Internal Roads &Foothpaths Yes Nil 2. Water Supply Yes Nil 3. Sewarage (chamber, lines, Septic Tank, STP). Yes Nil 4. Storm Water Drains. Yes Nil 5. Landscaping & Tree planting. Nil Nil 6. Street Lighting. Yes Nil 7. Community Buildings. Nil Nil 8. Treatment and disposal of sewage and sullage water. Nil Nil 9. Solid Waste management & Disposal. Nil Nil 10. Water conservation, Rain water harvesting. Yes Nil 11. Energy management. Yes Nil 12. Fire protection and fire safety requirements. Yes Nil 13. Electrical meter room, sub-station, receiving station. Yes Nil 14. Others (Option to Add more). Nil Nil Yours Faithfully, Alim A.K. Fouzi (License No. ADTP/Str. Eng-1) 3 I page