` flu"zi fe Aj3guri&±pj3 Consulting Licensing, Planning Engineer & RCC Consultants Shop No.101& 102,1st Floor, Konark Arcade, Beside New Municipal Corporatoin Opp. Tahsildar Office, Bhiwandi-421 302. Email:fouziandassociates@gmail.com 73et .. 7)th:__i / /20 FORM 1 [See Regulation 3] ARCHITECT'S CERTIFICATE Date: 31-12-2021 TO' The DamjiHari Infrastructure Pvt Ltd Unit 423, 4th Floor, The Summit Business Bay, Behind Gurunanak Petrol Pump, Opp. Cinemax, Prakashwadi, Andheri East (E) Mumbai 400 093 Subject: Certificate of Percentage of Completion of Construction Work of Type-2, Building, Single Wing of the Single Phase of the Project P51700010181 situated on the Plot bearing Survey No. 38/1(p), 38/3, Plot No. - 1, demarcated by its boundaries (latitude and longitude of the end points) S.No. 39 & 207 to the North Service Road 12.0 mtr. To the South CFC Plot No.5 to the East open space plot on S.No. 38/1(p) to the West of Division, Village -Asangaon, Taluka- Shahpur, District-Thane, PIN-421601, admeasuring 8880.00 sq.mts. Area being developed by MAHADEV DAMJI PATEL sir, I Alim A.K. Fouzi have undertaken assignment as Architect of certifying Percentage of CompletionofConstructionWorkoftheType-2Building,SingleWingoftheSinglePhaseoftheProject, situated on the plot bearing S.No. 38/1(p), 38/3, Plot No. 1 of Division-Kokan, Village-Asangaon, Taluka- Shahpur, District-Thane, PIN-421601, admeasuring 8880.00 sq.mts. Area being developed by MAllADEV DAMJI PATEL. Following technical professionals are appointed by Owner / Promoter:- Shri Alim A.K. Fouzi as L.S. / Architect ; Shri Majid Dhokle as Structural Consultant Shri as MEP Consultant Shr.L Prashant Mahiskar as Site Supervisor 1 I page ffouzt & Aj3gori&ipg Consulting Licensing, Planning Engineer & RCC Consultants Shop No.101& 102,1st Floor, Konark Arcade, Beside New Municipal Corporatoin Opp. Tahsildar Office, Bhiwandi421 302. Email:fouziandassociates@gmail.com lad; .. 7)ale : '`J`I / |> / 20Ll Based on Site Inspection, with respect to each of the Building/Wing of the aforesaid Real Estate Project , I certfty that as on the date of this certificate, the Percentage of Work done for each of the building/Wing of the Real Estate Project as registered v/de number P51700010181 under MahaRERA is as per table A herein below. The percentage of the work executed with respect to each of the activity of the entire phase is detailed in Table a. TABLE-A Building Type-2 sr. No. Task/ Activity Percentage of (2) Work done(3) (1) 1. Excavation 100 2. One number of plinth 100 3. Number of Podiums 4. Stilt Floor (Ground floor) 100 5. Eight number of Slabs of Super Structure 100 6. Internal Walls, Internal Plaster, Floorings within Flats/Premises, Doors 80 and Windows to each of the Flat/Premises. 7. Sanitary Fittings within the Flat/Premises, Electrical Fittings within the 75 Flat/Premises 8. Staircases, Lifts Wells and Lobb.ies at each Floor level connecting 80 Staircases and Lifts, Overhead and Underground Water Tanks. 9. The external plumbing and external plaster, elevation, completion of 75 terraces with waterproofing of the Building/Wing. 1o. lnstaHation of lifts, water pumps, Fire I:ighting Fittings and Equipment as 0.0 Per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to e ntrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to obtain Occupation / Completion Certificate. 2 I page & Aj390ristlpg Consulting Licensing, Planning Engineer & RCC Consultants Shop No.101& 102,1st Floor, Konark Arcade, Beside New Municipal Corporatoin Opp. Tahsildar Office, Bhiwandi-421 302. Email:fouziandassociates@gmail.com 72`! .. Date : 3\ / I.i / 20-11 TABLE-B Internal and External Development Works in respect of the entire Registered Phase. Common areas Proposed Percentage Details Sr.NO. and Facilities, (Yes/ No) of work done (5) (1) Amenities (2)InternalRoads&Foothpaths (3) (4) Yes Nil 1.2.3 Water Su pp'y Yes Nil Sewarage (chamber, lines, Septic Tank, STP).StormWaterDrains Yes Nil Yes Nil 4 Nil Nil 5 LandscapStreetLi8commun ng & Tree Planting.htin8. Yes Nil 6.7 Nil Nil ty Bui,clings. Nil Nil 8. Treatment and disposal of sewage and sullagewater Nil Nil 9 Solid Waste management & Disposal.Waterconservation,Rainwaterharvesting.Enerymanagement. Yes Nil 10 Yes Nil 11.12.13. 8re rote F 'PElectricalstation ction and fire safety requirements. Yes Nil meter room, sub-station, receiving Yes Nil Nil Nil 14. Others (Option to Add more). H][iiE[[ETif"fl` Alim A.K. Fouzi (license No. Str. Eng/162) 3 I page