4uc.to (€.€.er,r/) M :9823367000 lfouzi k Aslnrtu,trg Consulting Licensing, Planning Engineer & RCC Gonsultants Shop No. 101& 102, 1st Floor, KonarkArcade, Beside New tMunicipal Corporatoin opp. Tahsildar office, Bhiwandi-421 302. Email:fouziandassociates @gmail.com R"l t Da*: / /ZO FORM 1 [See Regulation 3] ARCH ITECTS CERTI FICATE To, Date: 31-12-2019 The DamjiHari lnfrastructure Pvt Ltd Unit423,4th Floor, The Summit Business Bay, Behind Gurunanak Petrol Pump, Opp. Cinemax, Prakash wadi, Andheri East (E) Mumbai400 093 Subiect: Certificate of Percentage of Completion of Construction Work of Type-3, Building, Single Wing of the Single Phase of the Project P51700010181 situated on the plot bearing Survey No. 38/1(p), 38/3, PlotNo.- L, demarcated by its boundaries (latitude and longitude of the end points) S.No.39 & 207 to the North Service Road 12.0 mtr. To the South CFC plot No. 5 to the East open space plot on S.No. 3S/l(p)to the West of Division, Village- Asangaon, Taluka- Shahpur, District-Thane, PIN-421601, admeasuring 8880sq.mts. Area being developed by MAHADEV DAMJI PATEL Si r, I AlimA.K.Fouzi have undertaken assignment as Architect of certifying percentage of Completion of Construction Work of the Type - 3Building, Single Wing of the Single phase of the project, situated on the plot bearingS.No. 38/1(p), 38/3, Plot No. 1 of Division-Kokan, Village -Asangaon, Taluka-Shahpur, District-Thane, PIN-42160L, admeasuring 8880sq.mts.Area being developed by MAHADEV DAMJI PATEL. L. Following technical professionals are appointed by owner / promoter:- L. Shri Alim A.K. Fouzi as L.S. / Architect; 2. Shri Majid Dhokle as Structural Consultant 3. Shri as MEP Consultant 4. Shri Prashant Mahiskar as Site Supervisor 1.1?age iu,ro (e.AO,"tt) M :9823367000 lfouzi & Assnrtatrg Consulting Licensing, Planning Engineer & RCC Consultants Shop No. 101& 102, 1st Floor, KonarkArcade, Beside New [tlunicipal Corporatoin Opp. Tahsildar Office, Bhiwandi-421 302. Email:fouziandassociates@gmail.com R.l t Date: --: | / t;l / ?Ot 1 Based on Site lnspection, with respect to each of the Building/Wing of the aforesaid Real Estate Project , I certify that as on the date of this certificate, the Percentage of Work done for each of the building/Wing of the Real Estate Project as registered vide number P51700010181 under MahaRERA is as per table A herein below. The percentage of the work executed with respect to each of the activity of the entire phase is detailed in Table B. TABtE.A Building /Wing Number Type-3 (to be prepared separately for each Building /Wing of the Project) Sr. No. Task/ Activity Percentage of Work (1) (21 done (3) L, Excavation L00 2 One Number of Plinth 100 3. Number of Podiums 4. Stilt Floor 100 5. Eight number of Slabs of Super Structure 100 6. lnternal Walls, lnternal Plaster, Floorings within Flats/Premises, Doors 32 and Windows to each of the Flat/Premises. 7 Sanitary Fittings within the Flat/Premises, Electrical Fittings within the 0.0 Flat/Premises 8. Staircases, Lifts Wells and Lobbies at each Floor level connecting 65 Staircases and Lifts, Overhead and Underground Water Tanks 9 The external plumbing and external plaster, elevation, completion of 0.0 terraces with waterproofing of the Building/Wing. 10. lnstallation of lifts, water pumps, Fire Fighting Fittings and 0.0 Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to obtain Occupation / Completion Certificate. 2lPage ,1*r4c {€.€.Orz,4) M :9823367000 rtruzi k, Asssrtu,trs Consulting Licensing, Planning Engineer & RCC Consultants Shop No. 101& '102, 1st Floor, KonarkArcade, Beside New [t/unicipal Corporatoin Opp. Tahsildar Office, Bhiwandi-421 302. Email:fouziandassociates@gmail.com R4 Dace: S1 / b 1 i zoli TABTE-B lnternal and External Development Works in respect of the entire Registered Phase. Sr.No Common areas Proposed Percentage of Details (1) and Facilities, (Yes/ No) work done (s) Amenities (2) (3) (4) 7. lnternal Roads &Footh paths Yes Nil 2. Water Supply Yes Nil 3. Sewarage (chamber, lines, Septic Tank, STP) Yes Nil 4. Storm Water Drains Yes Nil 5. Landscaping & Tree Planting. Nil Nil 6. Street Lighting. Yes Nil 7 Community Buildings. Nit Nil 8 Treatment and disposal of sewage and sullage water Nil Nil 9. Solid Waste management & Disposal Nil Nil 10. Water conservation, Rain water harvesting. Yes Nit Lt. Energy management. Yes Nil 12 Fire protection and fire safety requirements. Yes Nil 13 Electrical meter room, sub-station, receiving station. Yes Nil L4. Others (Option to Add more). Nil Nil Yours Faithfully, Alim A.K. Fouzi (License No. ADTP/SIr. Eng-1) 3lPage