/4*/,tc (e.€.Oarl) M :98233670 lfouzi k Assnrtatrg Gonsulting Licensing, Planning Engineer & RCC Consultants Shop No. 101& 102, 1st Floor, KonarkArcade, Beside New N/unicipal Corporatoin Opp. Tahsildar Office, Bhiwandi-421 302. Email:fouziandassociates@gmail.com Rel Date' / /ZO FORM 1 [See Regulation 3] ARCH ITECTS CERTI F]CATE To, Date: 3L-12-2019 The DamiiHari lnfrastructure Pvt Ltd Unit 423, 4h Floor, The Summit Business Bay, Behind Gurunanak Petrol Pump, Opp. Cinemax,Prakashwadi, Andheri East (E) Mumbai400 093 Subject: Certificate of Percentage of Completion of Construction Work of Type-2, Building, Single Wing of the Single Phase of the Project P51700010181 situated on the Plot bearing Survey No. 38lL(p1,38/3, Plot No. - 1, demarcated by its boundaries (latitude and longitude of the end points) S.No. 39 & 2O7 to the North Service Road 12.0 mtr. To the South CFC Plot No.5 to the East open space ptot on S.No. 38/1(p) to the West of Division, Village - Asangaon, Taluka- Shahpur, District-Thane, PIN-421601, admeasuring 8880.00 sq.mts. Area being developed by MAHADEV DAMJI PATET Sir, I Alim A.K. Fouzi have undertaken assignment as Architect of certifliing Percentage of Completion of Construction Work of the Type-2 Building, Single Wing of the Single Phase of the Project, situated on the plot bearing S.No. 3S/1(p1,38/3, Plot No. 1 of Division-Kokan, Village-Asangaon, Taluka- Shahpur, District-Thane, PIN-421601, admeasuring 8880.00 sq.mts. Area being developed by MAHADEV DAMJIPATEL. L Following technical professionals are appointed by Owner / Promoter:- 1. ShriAlim A.K. Fouzi as L.S. / Architect; 2. Shri Majid Dhokle as Structural Consultant 3. Shri- as MEP Consultant 4. Shri Prashant Mahiskar as Site Supervisor 1lP*g* ,4/ir,L (€.Ae,r,,/) M:9823367000 lfouzi *, Axsnrtatr 8 Consulting Licensing, Planning Engineer & RCC Consultants Shop No. 101& 102, 1st Floor, KonarkArcade, Beside New [t/unicipal Corporatoin Opp. Tahsildar Office, Bhiwandi-421 302. Email.fouziandassociates@gmail.com Pe4 Da.te: Jt / tA / zolq Based on Site lnspection, with respect to each of the Building/Wing of the aforesaid Real Estate Project , I certify that as on the date of this certificate, the Percentage of Work done for each of the building/Wing of the Real Estate Project as registered vide number P51700010181 under MahaRERA is as per table A herein below. The percentage of the work executed with respect to each of the activity of the entire phase is detailed in Table B. TABLE-A Building Type-2 Sr. No Task/ Activity .:J : Percentage of (1) (21 Work done (3) 7 Excavation 100 2 One number of plinth 100 3 Number of Podiums 4. Stilt Floor (Ground floor) 100 5. Eight number of Slabs of Super Structure 100 6 lnternal Walls, lnternal Plaster, Floorings within Fl ats/Premises, Doors 55 and Windows to each of the Flat/Premises. 7 Sanitary Fittings within the Flat/Premises, Electrical Fittings within the 0.0 Flat/Premises 8. Staircases, Lifts Wells and Lobbies at each Floor level connecting 80 Staircases and Lifts, Overhead and Unde Water Tanks. 9 The external plumbing and external plaster, elevatidn, completion of 0.0 terraces with waterproofing of the Building/Wing. 10. lnstallation of lifts, water pumps, Fire Fighting Fittings and EquiPment as 0.0 per cFo Noc, Electrical fittings to common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/wing, compound wall and all other requirements as may be required to obtain occupation / completion Certificate. 2lPage /4&r,tc (€E.ead) M:9823367 I{o$zi & Asssrtatrs Consulting Licensing, Planning Engineer & RCC Consultants Shop No. '101& 102, 1st Floor, KonarkArcade, Beside New N/lunicipal Corporatoin Opp. Tahsildar Office, Bhiwandi-421 302. Email.fouziandassociates@gmail.com R"l' Date'-4t /t)"/?Ot'j TABLE-B lnternal and External Development Works in respect of the entire Registered Phase. Sr.No. Common areas Proposed Percentage Details (1) and Facilities, (Yes/ No) of work done (s) Amenities (2) (3) (4) L. lnternal Roads & Foothpaths Yes Nil 2. Water Supply Yes Nil 3. Sewarage (chamber, lines, Septic Tank, STP) Yes Nil 4. Storm Water Drains. Yes Nil 5. Landscaping & Tree Planting Nil Nil 5. Street Lighting. Yes Nil 7 Community Buildings Nil Nil 8. Treatment and disposalof sewage and sullage Nil Nil water. 9. Solid Waste management & Disposal. Nil Nil 10. Water conservation, Rain water harvesting. Yes Nil 77. Energy management. Yes Nil 72. Fire protection and fire safety requirements. Yes Nil 13. Electrical meier room, sub-station, receiving Yes Nil station. 14. Others (Option to Add more). Nil Nil Yours Faithfully, Alim A.K. Fouzi (License No. Str. EnelL62l 3lPage