/4(ir,tc (AE.etu/) M:9823367000 lflouzi & Asssrtatrg Consulting Licensing, Planning Engineer & RCG Consultants Shop No. 101& 102, 1st Floor, KonarkArcade, Beside New [/unicipal Corporatoin Opp. Tahsildar Office, Bhiwandi-421 302. Email:fouziandassociates@gmail.com Rel Da*, / /ZO FORM 1 [See Regulation 3] ARCH ITECT'S CERTI FICATE To,, Date:31-12-2019 DamjiHari lnfrastructure Pvt. Ltd. Unit 423, 4th Floor, The Summit Business Bay, Behind Gurunanak Petrol Pump, Opp. Cinemax,Prakashwadi, Andheri East (E) Mumbai400 093 Subject: Certificate of Percentage of Completion of Construction Work of Type-l, Building, Single Wing of the Single Phase of the Project P51700010181 situated on the Plot bearing Survey No. 38/1(p), 38/3, PlotNo. - 1, demarcated by its boundaries (latitude and longitude of the end points) S.No. 39 & 207 to the North Service Road !.2.0 mtr. To the South CFC Plot No.5 to the East open space plot on S.No. 38/1(p) to the West of Division, Village-Asangaon, Taluka- Shahpur, District-Thane, PIN-421601, admeasuring 8880sq.mts. Area being developed by MAHADEV DAMJIPATET Sir, I Alim A.K. Fouzi have undertaken assignment as Architect of certifying Percentage of Completion of Construction Work of the Type-l Building, Single Wing of the Single Phase of the Project, situated on the piot bearing S.No. 38/1(p),3813, Plot No. 1 of Division-Kokan, Village -Asangaon, Taluka- Shahpur, District-Thane, Pl,N-421601, admeasuring 8880sq.mts.Area being developed by MAHADEV DAMJ! PATEL. 1. Following technical professionals are appointed by Owner / Promoter:- L. ShriAlim A.K. Fouzi as L.S. / Architect; 2. Shri Majid Dhokle as Structural Consultant 3. Shri_ as MEP Consultant 4. Shri Prashant Mahiskar as Site Supervisor I l lPage (8.€.Oc"rt) M:9823367000 lfrouzi k, Asssrtntrg Consulting Licensing, Planning Engineer & RCC Consultants Shop No. 101& '102, 1st Floor, KonarkArcade, Beside New lt/unicipal Corporatoin Opp. Tahsildar Office, Bhiwandi-421 302. Email.fouziandassociates@gmail.com R"l , Da*: ]l / tqizOl"i Based on Site lnspection, with respect to each of the Building/Wing of the aforesaid Real Estate Project , I certify that as on the date of this certificate, the Percentage of Work done for each of the building/Wing of the Real Estate Project as registered vide number P51700010181 under MahaRERA is as per table A herein below. The percentage of the work executed with respect to each of the activity of the entire phase is detailed in Table B. TABLE.A Building Type-1 Sr. No. Task/ Activity Percentage of Work done (1) (21 (3) 7 Excavation 100 2 One number of plinth 100 3 Number of Podiums 4. Stilt Floor (Ground floor) 25 5 Two number of Slabs of Super Structure 00 6. lnternal Walls, lnternal Plaster, Floorings within Flats/Premises, 00 Doors and Windows to each of the Flat/Premises. 7 Sanitary Fittings within the Flat/Premises, Electrical Fittings within 00 the Flat/Premises 8. Staircases, Lifts Wells and Lobbies at each Floor level connecting 00 Staircases and Lifts, Overhead and Underground Water Tanks 9. The external plumbing and external plaster, elevation, completion 00 of terraces with waterproofing of the Building/Wing 10. lnstallation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of 00 environment ICRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to obtain Occupation / Complet ion Certificate 2lPage (A.€.e.,r/) M:9823367000 lfouzi k Assnriu,trs Consulting Licensing, Planning Engineer & RCC Consultants Shop No. 101& 102, 1st Floor, Kona rk Arcade, Beside New ltlunicipal Corporatoin Opp. Tahsildar Office, Bhiwandi-42 1 302. Email:fouziandassociates@gmail.com R"l' Date, 3l / l:; / 20 {7 TABLE.B lnternal and External Development Works in respect ofthe entire Registered Phase. Sr.No. Common areas Proposed Percentage of Details (Yes/ No) (3) work done (4) (s) and Facilities, Amenities (2) lnternal Roads & hs Yes Nil 1 Water Su Yes Nil 2 Sewa mbe r, lines, Yes Nil 3 4. Storm Water Drains. Yes Nil Landsca & Tree Pla Nil Nil 5. 6. Street Lighti Yes Nil Com Buildi Nil Nil 7 8 Treatment and disposal of sewage and Nil Nil sul water. Solid Waste m & Nil Nil 9. Water conservatio Rain water harvest Yes Nil 10. ma Yes Nil LL. Ene Fire n and fire safety reqqllgrnen!1_ Yes Nil L2 Electrical meter room, sub-station, receiving Yes Nil 13 station. Yes Nil 74. Others (Opti on to Add more). Yours Faithfully, <@- Alim A.K. Fouzi (License No. Str. Eng/L621 3lPage