ffinwrua fu ffiwffiwwNwkww Consulting Licensing, Planning Engineer & RCC Consultants Shop No. 101 & 102,1st Floor, Konark Arcade, Eesfde New Municipal Corparatain opp. Tahsildar Office. Bhiwandi-421 302. Email:fouziandassociates@gmail"com Ped: Date: / / eO FORM 1 [See Regulation 3] ARCHITECT' S CERTIFICATE To, Date: 30-09-2019 The Damii Hari Infrastructure Pvt Ltd rJnit423,46 Floor, The Summit Business Bay, Behind Gurunanak Petrol PumP, Opp. Cinemax, Prakashwadi, Andheri East (E) Mumbai 400 093 Subject: Certificate of Percentage of Completion of Construction Work ofType-3, Building, Single Wing of the Single Phase of the Project P51700010181 situated on the Plot bearing Survey No. 38/1(p), 38/3, Plot No. - 1, demarcated by its boundaries (latitude and longitude of the end points) S.No.39 & 207 to the North Service Road 12.0 mtr. To the South CFC Plot No.5 to the East open space plot on S.No. 38/1(p)to the West of Division, Village- Asangaon, Taluka- Shahpur, District-Thane, PIN-421601, admeasuring 8880.00 sq.mts. Area being developed by MAHADEV DAMJI PATEL Sir, I Alim A.K. Fouzi have undertaken assignment as Architect of certif,,ing Percentage of Completion of Construction Work of the Type - 3Building, Single'Wing of the Single Phase of the Project, situated on the plot bearing S.No. 38/1(p), 38/3, Plot No. 1 of Division-Kokan, Village - Asangaon, Taluka-Shahpur, District-Thane, PIN-421601, admeasuring 8880.00 sq.mts. Area being developed by MAHADEV DAMJI PATEL. 1 Following technical professionals are appointed by Owner'/ Promoter:- 1. Shri Alim A.K. Fouzi as L.S. / Architect; 2. Shri Majid Dhokle as Structural Consultant J. Shri as MEP Consultant 4. Shri Prashant Mahiskar as Site Supervisor Page 1 of 3 Wnww,s k ffiw%ffiwNwkww Consulting Licensing, Planning Engineer & RCC Consultants Shop No. 101 & 1O2,1st Floor, Konark Arcade, Beside New Municipal Corporatoin opp Tahsildar Office. Bhiwandi-421 302. Email:fouziandassociates@gmail'com Date: eo / dq / 20 lcl Rel: Based on Site Inspection, with respect to each of the BuildingAMing of the aforesaid Real Estate Project , I certiff that as on the date of this certificate, the Percentage of work done for each of the project as registered vide mtmber P51700010181 under MahaRERA is building/Wing of the Real Estate as per table A herein below. The percentage of the work executed with respect to each of the activity of the entire phase is detailed in Table B. TABLE.A Number (to be separately for each Building of the Building Task/ Activity Percentage of Work Sr. No. (2) done (1) 100 I Excavation 100 2. One Number of Plinth J Number of Podiums 100 4 Stilt Floor 100 5 number of Slabs of Structure 6. Internal "Walls, Internal Plaster, Floorings within Flats/Premises, 30 Doors and Windows to each of the FlaUPremises. Sanitary Fittings within the FlaVPremises, Electrical Fittings within 0.0 7 the Flat/Premises 65 8. Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Overhead and Wrater T,anks. 9 The external plumbing and external plaster, elevation, comPletion of 0.0 teraces with waterproofing of the Building/Wing' Installation of lifts, water pumps, Fire Fighting Fittings and 0.0 10. Equipment as per CFO NOC, Electrical fittings to Common Areas' electro, mechanical equipment, Compliance to conditions of environment /cRZ NO-C, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to BuildingAVing, Compound Wall and- all other requirements as may be required to obtain IC Certificate. Page 2 of 3 4tir,n O : 02522-220769 / M : 9823357000 rtouzi & Assnrt *bs Architect & RCC Consultants 72 I 73,3rd Nizampur, Bhiwandi, Dist. Thane - 421 3A2 Email:fouziandassociates@yahoo.co.in R4, Da.tc : Zo / eq / zo lJ TABLE-B Internal and External Works in ofthe entire Phase. Sr.No Common areas Proposed Percentage of Details (1) and Facilities, (Yes/No) work done (s) Amenities (3) (4) 1 Internal Roads &F Yes Nil 2. Water Yes Nil 3 chamber S Yes Nil 4. Storm Water Drains. Yes Nil 5. Landscapins & Tree Planting. Nil Nil 6 Street Yes Nil 7 Nit Nil 8. Treatment and of and water Nil Nil 9 Solid Waste & Nil Nil 10. Water Rain water Yes Nil 11 Yes Nil 12. Fire and fire Yes Nil 13. Electrical meter sub-station, receiving station. Yes Nil t4 Others (Option to Add more). Nil Nil Yours Alim A.K. Fouzi No. ADTP/Str. Eng-l) Page 3 of 3