(e.€.er"r/) M :9823367000 ffouzi k Assnrt atts Consulting Licensing, Planning Engineer & RCC Consultants Shop No. 101& 102, 1st Floor, KonarkArcade, Beside New Municipal Corporatoin Opp. Tahsildar Office. Bhiwandi-421 302. Email:fouziandassociatos@gmail.com Pel Date: / / ZO FORM 1 [,See Regulation 3] ARCHITECT' S CERTIFICATE To, Date: 30-09-2019 The Damji Hari Infrastructure Pvt Ltd rJfit 423,4ft Floor, The Summit Business Bay, Behind Gurunanak Petrol Pump, Opp. Cinemax, Prakashwadi, Andheri East (E) Mumbai 400 093 Subject: Certificate of Percentage of Completion of Construction Work of Type-2, Building, Single Wing of the Single Phase of the Project P51700010181situated on the Plot bearing Survey No. 38/1(p), 38/3, Plot No. - 1, demarcated by its boundaries (latitude and longitude of the end points) S.No.39 & 207 to the North Service Road 12.0 mtr. To the South CFC Plot No.5 to the East open space plot on S.No. 38/1(p) to the West of Division, Village-Asangaon, Taluka- Shahpur, District-Thane, PIN-421601, admeasuring 8880.00 sq.mts. Area being developed by MAHADEV DAMJI PATEL Sir, I Alim A.K. Fouzi have undertaken assignment as Architect of certiffing Percentage of Completion of Construction Work of the Type-2 Building, Singlq Wing of the Single Phase of the Project, situated on the plot bearing S.No. 38i1(p), 38i3, Plot No. 1 of Division-Kokan, Village- Asangaon, Taluka-Shahpur, District-Thane, PIN-421601, admeasuring 8880.00sq.mts.Area being developed by MAHADEV DAMJI PATEL. 1 Following technical professionals are appointed by Owner / Promoter:- 1 Shri Alim A.K. Fouzi as L.S. / Architect; 2 Shri Majid Dhokle as Structural Consultant J Shri as MEP Consultant 4 Shri Prashant Mahiskar as Site Supervisor Page 1 of 3 (e.€, M :9823367000 If ouzi k Assnrt atrs Consulting Licensing, Planning Engineer & RCC Consultants Shop No. 101& 102, 1st Floor, KonarkArcade, Beside New Municipal Corporatoin opp Tahsildar Office. Bhiwandi- 421 302. Email:fouziandassociates@gmail.com Rel Date: 3o / 01 / 2Ol? Based on Site Inspection, with respect to each of the Building/Wing of the aforesaid Real Estate Project , I certi$, that as on the date of this certificate, the Percentage of Work done for each of the buildingAMing of the Real Estate Project as registered vide number P51700010181 under MahaRERA is as per table A herein below. The percentage of the work executed with respect to each of the activity of the entire phase is detailed in Table B. TABLE-A Building Type-2 Sr. No Task/ Activity Percentage of (1) (2) Work done (3) I Excavation 100 2 One number of plinth 100 3 Number of Podiums 4 Stilt Floor (Ground floor) 100 5 Eight number of Slabs of Super Structure 100 6 Internal Walls, lnternal Plaster, Floorings within FlatsiPremises, Doors 50 and Windows to each of the Flat/Premises. 7 Sanitary Fittings within the Flat/Premises, Electrical Fittings within the 0.0 Flat/Premises 8 Staircases, Lifts Wells and Lobbies at each Floor level connecting 80 Staircases and Lifts, Overhead and Underground Water Tanks. 9 The external plumbing and external plaster, elevation, completion of 0.0 terraces with waterproofihg of the Building/lVing. 10 Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as 0.0 per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environmerfi ICW NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to BuildingAVing, Compound Wall and all other requirements as may be required to obtain Occupation / Completion Certificate. 2 | F ,t ''..; r: a M : 9823367000 If nuzi k Assnrt atts Consulting Licensing, Planning Engineer & RCC Consultants Shop No. 101& 102, 1st Floor, KonarkArcade, Beside New tt/l u nicipal Corporatoin Opp. Tahsildar Office, Bhiwandi-421 302. Email:fouzianda ssociates@gmail.com Re/: Date: ga /a1 / ZO11 TABLE-B Internal and External Development Works in of the entire Registered Phase Sr.No Common areas Proposed Percentage of Details (1) and Facilities, (Yes/No) work done (s) Amenities (2) (3) (4) I Internal Roads Yes Nil 2. Water Yes Nil a J S chamber S Yes Nil 4. Storm Water Drains Yes Nil 5 & Tree P Nil Nil 6 Street Yes Nil 1 Nil Nil 8 Treatment and disposal of sewage and sullage Nil Nil water, 9 Solid Waste & sal Nil Nil 10 Water Rain water Yes Nil 11 Yes Nil l2 Fire and fire Yes Nit 13 Electrical meter room, sub-station, receiving Yes Nil station. t4 Others to Add more NiI Nil Yours Faithfully, t,, Alim A.K. Fouzi (License No. Str. Engl162) 3l?i:ig,i: