(g.Ae,r/rl) M :9823367000 l{o\zi k Assnrt ai.rls Consulting Licensing, Planning Engineer & RCC Consultants Shop No. 101& 102, 1st Floor, KonarkArcade, Beside New Municipal Corporatoin Opp. Tahsildar Office Bhiwandi-421 302, Email:fouziandassociates@gmail.com Re/ Date: / /ZO FORM 1 [,See Regulation 3] ARCHITECT'S CERTIFICATE To, Date: 30-09-2019 Damji Hari_Infrastructure Pvt. Ltd. rJnit 423,4m Floor, The Summit Business Bay, Behind Gurunanak Petrol Pump, Opp. Cinemax, Prakashwadi, Andheri East (E) Mumbai 400 093 Subject: Certificate of Percentage of Completion of Construction Work of Type-l, Building, Single Wing of the Single Phase of the Project P51700010181 situated on the Plot bearing Survey No. 38/1(p), 38/3, Plot No. - 1, demarcated by its boundaries (latitude and longitude of the end points) S.No. 39 & 207 to the North Service Road 12.0 mtr. To the South CFC Plot No. 5 to the East open space plot on S.No.38/1(p) to the West of Division, Village-Asangaon, Taluka- Shahpur, District*Thane, PIN-421601, admeasuring 8880.00 sq.mts. Area being developed by MAHADEV DAMJI PATEL Sir, I Alim A.K. Fouzi have undertaken assignment as Architect of certifi,ing Percentage of Completion of Construction Work of the Type -1 Building, Single Wing of the Single Phase of the Project, situated on the plot bearing S.No. 38/1(p), 3813, Plot No. 1 of Division-Kokan, Village - Asangaon, Taluka-Shahpur, District-Thane, PIN-421601, admeasuring 8880.00 sq.mts.Area being developed by MAIIADEV DAMJI PATEL. 1 Following technical professionals are appointed by Owner / Promoter:- l. Shri Alim A.K. Fouzi as L.S. / Architect ; 2. Shri Majid Dhokle as Structural Consultant Shri as MEP Consultant 4. Shri Prashant Mahiskar as Site Supervisor Page 1 of 3 (e.€.e,"4) M :9823367000 o l{ouzi k Assnrt a|.rls Consulting Licensing, Planning Engineer & RCC Consultants Shop No. 101& 102, 1st Floor, KonarkArcade, Beside New Municipal Corporatoin Opp. Tahsildar Office. Bhiwandi-421 302. Email:fouziandassociates@gmail.com R"l t Date: 90 / 01 / 20tq Based on Site Inspection, with respect to each of the Building/Wing of the aforesaid Real Estate Project , I certiff that as on the date of this certificate, the Percentage of Work done for each of the building/Wing of the Real Estate Project as registered vide nrtmber P51700010181 under MahaRERA is as per table A herein below. The percentage of the work executed with respect to each of the activity of the entire phase is detailed in Table B. TABLE.A Building Type-1 Sr. No. Task/ Activity Percentage of Work done (1) (2) (3) I Excavation 100 2 One number of plinth 100 Number of Podiums 4 Stilt Floor (Ground floor) 20 5 Two number of Slabs of Super Structure 00 6. Internal Walls, Internal Plaster, Floorings within Flats/Premises, 00 Doors and Windows to each of the FlaVPremises. 7 Sanitary Fittings within the Flat/Premises, Electrical Fittings within 00 the Flat/Premises 8. Staircases, Lifts Wells and Lobbies at each Floor level connecting 00 Staircases and Lifts, Overhead and Underground Waterlq\s 9 The external plumbing and external plaster, elevation, completion of 00 terraces with waterproofing of the Building/Wing 10 Installation of lifts, water pumps, Fire Fighting Fiffings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of 00 environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to obtain Occupation / Completion Certificate. Page 2 of 3 M :9823367000 O ffouzi k Assnrt atrs Consulting Licensing, Planning Engineer & RCC Consultants Shop No. 101& 102, 1st Floor, KonarkArcade, Beside New Municipal Corporatoin opp. Tahsildar office. Bhiwandi-421 302. Email.fouziandassociates@ gmail.com Rel Date:,]a /o1 /2011 TABLE-B Internal and External Works in of the entire Registered Phase. Sr.No. Common areas Proposed Percentage of Details (1) and Facilities, Amenities (2) (Yes/No) (3) work done (4) (s) 1 Internal Roads &F Yes Nil 2 Water Yes Nil J Sewarage (chamber, lines, Septic Tank, Yes Nil 4. Storm Water Drains. Yes Nil 5 & Tree Nit Nil 6. Street Lighting. Yes Nil 7 B Nil Nil 8 Treatment and disposal of sewage and Nil Nil water 9 Solid Waste & Nil Nit 10 Water Rain water Yes Nit 11 Yes Nil t2 Fire and fire Yes Nil 13 Electrical meter room, sub-station, receiving Yes Nil station. 14. Others to Add more Yes Nil Yours t' AlimA.K. Fouzi (License No. Sh. En!162) Page 3 of 3