FORM 1 / [See Regulation 3] ARCHITECT'S CERTIFICATE Date To, MIS SIXTH SENSE DEVLOPERS Add- Juinagar, Navi-Mumbai. Subject: Certificate of Percentage of Completion of Construction Work of 01 No. of Building(s Building(s), A - Wing(s) (Area 888.52 sq.mt) of the 1st Phase of the Project situated on the Plot bearing S.NO 23 h.No 2/2(a) C.T.S ... 4289 Demarcated by its boundaries, D.P. Road to the North, NALA to the South, D.P. road to the East, ADJ C.T.S. no 4290 to the West of Village-KHOPOLl, Taluka-Khalapur, District-Raigad.PIN- 410 203. admeasuring Built up 3956.75 sq.mts. Area being developed by MIS SIXTH SENSE DEVLOPERS. Sir, I Mr B.N. Deshmukh have undertaken assignment as Architect of certifying Percentage of Completion of Construction Work of the Building(s) - A Wing(s) (Area 888.52 sq.mt) 1st Phase of the the Project, situated on the plot bearing S.NO 23 H.No 2/2(a) C.T.S .. 4289 of Village - Khopoli, Taluka - Khalapur ,District - Raigad. PIN - 410 203 admeasuring Built up 3956.75 sq.mts. Area being developed by MIs. Sixth Sense Developer. 1. Following Technical Professionals are appointed by Owner I Promoter:- (i) MIs IShri I Smt. - B.N. Deshmukh - as Architect (ii) MIs IShri I Smt. - B.N. Deshmukh - as Structural Consultant (iii) MIs IShri I Smt.--------- as MEP Consultant (iv) Mis IShri I Smt. --------- as Site Supervisor Based on Site Inspection, with respect to each of the BuildinglWing of the aforesaid Real Estate Project , I certify that as on the date of this certificate, the Percentage of Work done for each of the buildinglWing of the Real Estate Project as registered vide number -- under MahaRERA is as per Table A herein below. The percentage of the work executed with respect to each of the activity of the entire phase is detailed in Table B. TABLE-A Building / Wing Number - A Wing Sr. No. Tasks /Activity Percentage of work done (1) (2) (3) 1. o Stilt 06 number Floor Excavation 01 Staircases, The number Sanitary Internal Installation of Podiums Plinth Lifts Fittings External Walls,of Wells of Slabs lifts, of and within Plumbing Internal waterSuper the andLobbies Plaster, pumps, at Fighting Flat/Premises, Structure External Floorings Fire each Floor Plaster, within 0% 100% 100% N/A 100% 100% 10. 8. 7. 9. the Flat/Premises. Mechanical Completion and Compound may of environment Underground be areas Electrical Entrance equipment, Certificate. required Waterproofingfittings of Wall obby/s, /CRZ appurtenant toWater the and plinth Compliance NOC, Common obtain to all Finishing Tanks. BuildinglWing, Occupation other Areas, BuildinglWing. toto/conditions requirements protection, electro, paving as Common Internal Storm Community Water Electrical Energy Fire Others Treatment Street Solid Sewerage Roads Electrical Water protection Waste Supply Lighting (Option Drains areas Management Landscaping and Work BoreweII & Conservation, Meter & 80% (4) Buildings Room,0% 50% 0%0% Management (chamber, Septic Details Tankdone Fire roposed Percentage and (3) to Disposal (5) (Yes/No) Add P YES YES NO YES N/A more). of NO NO TABLE-B Meter room S.No. Works opment Water. (2)inSeptic Lines, respectTank, of theSTP). entire Registered Phase. 10. 6. 11. 2. 9. 5. 1. 13. Yours Faithfully, •• u' _ •••• ••••• _ •• h B.E. (CML) ~.E. (~tructure) A-4, R••... ,. :-!;!. , Architect (~~No. "';;':O~t)~I, DISr. 0 ••• ~ • '. 10203. (() :(02192) ;ia2 OJ FORM 1 [See Regulation 3J ARCHITECT'S CERTIFICATE Date To, MIS SIXTH SENSE DEVloPERS Add- Juinagar, Navi-Mumbai. Subject: Certificate of Percentage of Completion of Construction Work of 01 No. of Building(s Building(s), B - Wing(s) (Area 1180.98 sq.mt) of the 1st Phase of the Project situated on the Plot bearing S.NO 23 h.No 2/2(a) C.T.S ... 4289 Demarcated by its boundaries, D.P. Road to the North, NALA to the South and Wing A of the Project, D.P. road to the East, ADJ C.T.S. no 4290 to the West of Village-KHOPOLl, Taluka-Khalapur, District-Raigad.PIN- 410203. admeasuring Built up 3956.75 sq.mts. Area being developed by MIS SIXTH SENSE DEVLOPERS. Sir, I Mr B.N. Deshmukh have undertaken assignment as Architect of certifying Percentage of Completion of Construction Work of the Building(s) - B Wing(s) (Area 1180.98 sq.mt) 1st Phase of the the Project, situated on the plot bearing S.NO 23 H.No 2/2(a) C.T.S .. 4289 of Village - Khopoli, Taluka - Khalapur ,District - Raigad. PIN - 410 203 admeasuring Built up 3956.75 sq.mts. Area being developed by M/s.Sixth Sense Developer. 2. Following Technical Professionals are appointed by Owner I Promoter:- (v) Mis IShri I Smt. - B.N. Deshmukh - as Architect (vi) Mis IShri I Smt. - B.N. Deshmukh - as Structural Consultant (vii) Mis IShri I Smt.--------- as MEP Consultant (viii) Mis IShri I Smt. --------- as Site Supervisor Based on Site Inspection, with respect to each of the BuildinglWing of the aforesaid Real Estate Project , I certify that as on the date of this certificate, the Percentage of Work done for each of the buildinglWing of the Real Estate Project as registered vide number -- under MahaRERA is as per Table A herein below. The percentage of the work executed with respect to each of the activity of the entire phase is detailed in Table B. / TABLE-A Building / Wing Number - B Wing Sr. No. Tasks /Activity Percentage of work done (1) (2) (3) 1. . 01 Excavation Stiltnumber Floor Staircases, 6 Sanitary Thenumber Walls, Installation Internal of External . Plinth ofPodiums Lifts of Fittings Wells lifts, Internal Slabs water of within Plumbing and Super and the Lobbies Plaster, pumps, Externalat each Structure Floorings Fire Floor Fighting within Plaster, Flat/Premises, 100% 100% 100% 100% 0% N/A 60% 9. 7. 10. 8. Mechanical of the and environment areas be equipment, Flat/Premises. Compound may Completion of Entrance Electrical Wall required appurtenant Waterproofing of obby/s, Underground fittings /CRZ and toWater the Certificate. plinth NOC, all to Common obtain Finishing Compliance other BuildinglWing. conditions requirements Building/Wing, protection, Tanks. Occupation Areas, toto electro, as paving / Storm Internal Others Street Fire Energy Water Solid Water Common Electrical Roads protection Electrical Supply Treatment Waste Community Meter (Option Lighting Landscaping Sewerage andDrains & & Borewell areas Work Conservation, (chamber, Septic and to (3) Management 80% 50% 0% 0% Add Tank Room, (5) Buildings 0% Management done Fire Disposal (4) PercentageDetails NO N/A YES YES more). (Yes/No) Proposed of YES NO NO TABLE-B Meter room .No. (2) Lines,inSeptic ment Works er. respectTank, of theSTP). entire Registered Phase. 6. 11. 3. 14. 10. 5. 13. Yours Faithfully, I.E. ( 4-4, R. t r Architect (lJdetl"S~li.-.~;:~r.:F:'J.L1} DISY. lAIGAD - {.t0203. (() :(02192) 262133 ./ FORM 1 [See Regulation 3J ARCHITECT'S CERTIFICATE Date To, MIS SIXTH SENSE DEVLOPERS Add- Juinagar, Navi-Mumbai. Subject: Certificate of Percentage of Completion of Construction Work of 01 No. of Building(s Building(s), C - Wing(s) (Area 1220.11 sq.mt) of the 2nd Phase of the Project situated on the Plot bearing S.NO 23 h.No 2/2(a) C.T.S ... 4289 Demarcated by its boundaries, D.P. Road to the North, NALA to the South and Wing B of the Project, D.P. road to the East, ADJ C.T.S. no 4290 to the West of Village-KHOPOLl, Taluka-Khalapur, District-Raigad.PIN- 410 203. admeasuring Built up 3956.75 sq.mts. Area being developed by MIS SIXTH SENSE DEVLOPERS. Sir, I Mr B.N. Deshmukh have undertaken assignment as Architect of certifying Percentage of Completion of Construction Work of the Building(s) - C Wing(s) (Area 1220.11 sq.mt) 2nd Phase of the the Project, situated on the plot bearing S.NO 23 H.No 2/2(a) C.T.S .. 4289 of Village - Khopoli, Taluka - Khalapur ,District - Raigad. PIN - 410 203 admeasuring Buflt up 3956.75 sq.mts. Area being developed by M/s.Sixth Sense Developer. 3. Following Technical Professionals are appointed by Owner I Promoter :- (ix) MIs IShri I Smt. - B.N. Deshmukh - as Architect (x) MIs IShri I Smt. - B.N. Deshmukh - as Structural Consultant (xi) MIs IShri I Smt.--------- as MEP Consultant (xii) MIs IShri I Smt. ---------as Site Supervisor Based on Site Inspection, with respect to each of the BuildinglWing of the aforesaid Real Estate Project , I certify that as on the date of this certificate, the Percentage of Work done for each of the buildinglWing of the Real Estate Project as registered vide number -- under MahaRERA is as per Table A herein below. The percentage of the work executed with respect to each of the activity of the entire phase is detailed in Table B. ABLE-A Building / Wing Number - C Wing Sr. No. Tasks /Activity Percentage of work done (1) (2) (3) 1. o Stilt Floor Excavation 01 number number Staircases, Walls, External Installation Internal Sanitary The 06 . Podiums Plinth ofof Lifts Fittings of Wells Slabs of and water within Internal lifts, Plumbing the Lobbies pumps, Super FlaUPremises, External Plaster, and at each Structure Floorings Fire Floor within Plaster, Fighting 100% 0% N/A 100% 0% 0% 7. 9. 8. 10. Mechanical the of Electrical and environment Waterproofing Entrance Compound may be areas Completion of Undergroundequipment, FlaUPremises. obby/s, Wall /CRZ of and plinth the Certificate. required appurtenant fittings toWater NOC, all Common obtain to Finishing Compliance other protection, BuildinglWing. BuildinglWing, Occupation Tanks.Areas, toto/ pavingconditions requirements electro, as Storm Internal Fire Common Sewerage Water Electrical Electrical Treatment Water Solid Others Energy Street Community Water Roads WasteMeter Conservation, (Option and areas Drains (chamber, Management Percentage Management (4) & (3) Room, (5) Supply Borewell 0% 80% Landscaping protection Work & Septic Lighting Add Disposal to Buildings and 0% 50% 0% Tankdone Details Firemore). Proposed (YeslNo) of NO YES YES YESNO YES YES NO N/A TABLE-B Meter room S.No. Lines, pment Works ater. (2) inSeptic respectTank, of theSTP). entire Registered Phase. 17. 10. 16. 16. 19. 15. 9. 13. Yours Faithfully, •. ~ ..•. ~~~ ..... _kh .Z. (ctftt) Kt I~tructure) 4-4, R n." EX, Architect tti~~"se No .. ·,.·.·vfOU) DIST. RA!vf\D - 410203 (() :(02192 j 26213) FORM 1 [See Regulation 3] ARCHITECTS CERTIFICATE Date To, MIS SIXTH SENSE DEVLOPERS Add- Juinagar, Navi-Mumbai. Subject: Certificate of Percentage of Completion of Construction Work of 01 No. of Building(s Building(s),0- Wing(s) (Area 667.14 sq.mt) of the 2nd Phase of the Project situated on the Plot bearing S.NO 23 h.No 2/2(a) C.TS ... 4289 Demarcated by its boundaries, D.P. Road to the North, NALA to the South and Wing C of the Project, D.P. road to the East, ADJ C.TS. no 4290 to the West of Village-KHOPOLl, Taluka-Khalapur, District-Raigad.PIN- 410 203. admeasuring Built up 3956.75 sq.mts. Area being developed by MIS SIXTH SENSE DEVLOPERS. Sir, I Mr B.N. Deshmukh have undertaken assignment as Architect of certifying Percentage of Completion of Construction Work of the Building(s) - 0 Wing(s) (Area 667.14 sq.mt) 2nd Phase of the the Project, situated on the plot bearing S.NO 23 H.No 2/2(a) C.TS .. 4289 of Village - Khopoli, Taluka - Khalapur ,District - Raigad. PIN - 410 203 admeasuring Built up 3956.75 sq.mts. Area being developed by M/s.Sixth Sense Developer. Following Technical Professionals are appointed by Owner I Promoter :- (xiii) Mis IShri I Smt. - B.N. Deshmukh - as Architect (xiv) Mis IShri I Smt. - B.N. Deshmukh - as Structural Consultant (xv) Mis IShri I Smt.--------- as MEP Consultant (xvi) Mis IShri I Smt. ---------as Site Supervisor Based on Site Inspection, with respect to each of the BuildinglWing of the aforesaid Real Estate Project , I certify that as on the date of this certificate, the Percentage of Work done for each of the buildinglWing of the Real Estate Project as registered vide number -- under MahaRERA is as per Table A herein betow. The percentage of the work executed with respect to each of the activity of the entire phase is detailed in Table B. TABLE-A Building / Wing Number - D Wing Sr. No. Tasks /Activity Percentage of work done (1) (2) (3) 1. Excavation 01 o The number number Staircases, Internal External number Sanit;3ry 06 Walls, Installation of. Stilt Plinth Podiums Lifts Fittings of of Floor Wells Slabs Plumbing within Internal lifts, of water and and Super the Lobbies Flat/Premises, External Plaster, at each Structure pumps, Plaster, Floorings Fire within 100% Floor Fighting 0% 0% 100% N/A 7. 8. 10. 9. the of Compound may and Flat/Premises. Mechanical environment Completion be Waterproofing Unaerground Electrical areas Entrance equipment, Certificate. Wall required obby/s, fittingsof/CRZ appurtenant and the toWater NOC, allCompliance Finishing other BuildinglWing. obtain plinth Common to Occupation Tanks. conditions requirements protection, BuildinglWing, Areas, toto/ paving electro, as (2) Storm InternalWater Electrical Fire Others Water Sewerage Energy Electrical Conservation, protection Supply Community(Option Landscaping Street Treatment Solid Roads WasteMeter and LightingDrains & & Borewell Work Room, and to Septic 0% 0% 80% (4) (chamber, (3) Management 50% 0% Add Details (Yes.:No Fire Percentage (5) Tank Buildings Managementdone Disposal more). Proposed YES N/A of NO NONO YES YES ABLE-B Meter room Common Lines, pment Works Water. in Septic areas Tank, respect of the STP). entire Registered Phase. 19. 20. 21. 14. 24. 20. Yours Faithfully, 13. 'tsnmukh, rocture) :'A. r.rpI Architec'~ense tlIo.K,f~jP.'ltI..) DlSl. lAIGAD . 41020l (f) :(02192) 26213) Ph. (02192) 262133 Cell: 9423378584 • ARCHITECTS • CIVIL ENGINEERS B. DESHMUKH • R. C. C. CONSULTANTS a.E. (Civil) M.E. (Structure) • L. I. C. VALUERS A-4, R. D. Complex, Bazarpeth, • F. I. V Khopoli .. 410 203, Dist. Raigad 'Date: WHOM SO EVER IT MAY CONCERN This is to certify that the building named Gagangiri Hills on plot bearing Survey no 23. Hissa no 2.C.T.S No. 4289/1 at Khopoli, Tal Khalapur, Dist - Raigad for Mis. SIXTH SENSE DEVELOPERS. The said work is under progress and in 'A' type R.C.C, Brickwork, Plastering, Flooring, Tiling, Electrical, Plumbing, Doors, Windows, Fabrication and Painting Work is Completed. 'B' type R.C.C and Brickwork is completed. Fabrication work is in Progress. 'c' & '0' type Plinth is completed. The construction cost incurred so far is Rs. 425.00 lacs approx. This is to certify that accordingly. # ~. tlESHMtJJ