FORM 1 ARCHITECT’S CERTIFICATE Date: 31 July 2017 To, M/s. Riel Infrastructure Pvt. Ltd, Naren Monisha Apt. Shop No-4 Ground Floor, Opposite Railway Station Asangaon (East), Shahapur Thane - 421601 Subject: Certificate of Percentage of Completion of Construction Work of Jolly Apartment (Residential Building), 01 No. of Building/02 Wings of the Project situated on the Plot bearing Plot No. 92/1 demarcated by its boundaries Property no – S.No- 89 to the north, Property No – S.No – 92/2 to the south, Type –B – Jolly apartment to the East S.No – 92/1 & open space to the south of Division Konkan village Shahpur taluka Shahapur District Thane PIN 421601 admeasuring 4150 sq.mts. Area being developed by M/s. Riel Infrastructure Pvt. Ltd Sir, We, Universal Consultants & Valuers LLP. have undertaken assignment as Architect of certifying Percentage of Completion of Construction Work of the Jolly Apartment (Residential Building), 01 No. of Building/02 Wings of the Project [MahaRERA Registration Number] situated on the Plot No. 92/1 demarcated by its village village Shahpur taluka Shahapur District Thane PIN 421601 admeasuring 4150 sq.mts. Area being developed by M/s. Riel Infrastructure Pvt. Ltd 1. Following technical professionals are appointed by Owner / Promoter:– (i) M/s. Archilogic Consultants as Design Architect (ii) M/s. Archilogic Consultants as Structural Consultant (iii) M/s. Archilogic Consultants as MEP Consultant (iv) Shri. Sachin Vekhande as Site Supervisor Based on Site Inspection, with respect to each of the Building of the aforesaid Real Estate Project , I certify that as on the date of this certificate, the Percentage of Work done for each of the building of the Real Estate Project as registered vide number (to be received after registration) under MahaRERA is as per table A herein below. The percentage of the work executed with respect to each of the activity of the entire phase is detailed in Table B. TABLE A Building no. 1 – Wing - A Sr.No. Tasks / Activity Percentage of (1) (2) work done (3) 1 Excavation 100 2 Plinth 100 3 number of Podiums NA 4 Stilt floor 100 5 05 number of Slabs of Super Structure 100 6 Internal Walls, Internal Plaster, Floorings within 40 Flats/Premises, Doors and Windows to each of the Flat/Premises. 7 Sanitary Fittings within the Flat/Premises, Electrical 0 Fittings within the Flat/Premises. 8 Staircases, Lifts Wells and Lobbies at each Floor level 60 connecting Staircases and Lifts, Overhead and Underground Water Tanks. 9 The external plumbing and external plaster, elevation, 70 completion of terraces with waterproofing of the Building/Wing. 10 Installation of lifts, water pumps, Fire Fighting Fittings and 10 Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to obtain Occupation / Completion Certificate. TABLE A Building no. 1 – Wing - B Sr.No. Tasks / Activity Percentage of (1) (2) work done (3) 1 Excavation 100 2 Plinth 100 3 number of Podiums NA 4 Stilt floor 100 5 05 number of Slabs of Super Structure 100 6 Internal Walls, Internal Plaster, Floorings within 40 Flats/Premises, Doors and Windows to each of the Flat/Premises. 7 Sanitary Fittings within the Flat/Premises, Electrical 0 Fittings within the Flat/Premises. 8 Staircases, Lifts Wells and Lobbies at each Floor level 60 connecting Staircases and Lifts, Overhead and Underground Water Tanks. 9 The external plumbing and external plaster, elevation, 70 completion of terraces with waterproofing of the Building/Wing. 10 Installation of lifts, water pumps, Fire Fighting Fittings and 10 Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to obtain Occupation / Completion Certificate. TABLE B Sr. Common areas Proposed Percentage Details No. and facilities, (Yes/No) of work (1) amenities (3) one (5) (2) (4) 1 Internal Roads & Yes 0% Access Road Footpaths. 2 Water Supply Yes 0% Water supply from Grampanchayat 3 Sewerage Yes 10% All sewage from the flats will be (chamber, lines, collected and connected to Septic Tank, main sewer line through pipes STP). 4 Storm Water Yes 0% All storm water will be collected Drains through dedicated pipes and will be diverted to Natural Culvert 5 Landscaping & Yes NA As per the Landscape design Tree Planting 6 Street Lighting Yes 0% As per the design 7 Community No NA Buildings 8 Treatment and No NA disposal of sewage and sullage water. 9 Solid Waste No NA management & Disposal. 10 Water No NA conservation, Rain water harvesting. 11 Energy No NA management 12 Fire protection No NA and fire safety requirements 13 Electrical meter Yes 0% Electrical meter room provided room, sub- station, receiving station 14 Others (Option No NA to Add more). Yours Faithfully, ABHIJEET V. PATIL ARCHITECT License no.: CA/2013/60945