SUVARNA Gt{05l] ARCIIIIT(I 3rd Floor, Arihant, Agyari Lane, Jambhli Naka. Thane - 400 601. Tel.: 2540 6310.e-mail : suvarnaghosh@gmail.com FORM I [see Regulation 3l ARCHITECT'S CERTIFICATE Ref:- 53/S06-005 4- I 5 /2022 Date:31/1012022 To M/sAl Mantasha Construction Address:T/O5 New Aman Apt. Kifayat Colony, Kausa, Thane 400612 Subject:Certificate of Percentage of Completion of Construction Work of building project: The Universe, No. of Building(s)/l Wing(s) I ofthe Phase of the Projecr I [P5170fiX]97971 situated on the Plot bearing e+l:-+€l€+SN€JSurvey n Thanedemarcated by its boundaries (latitude and longitude ofthe end points) Latitude l9'9' 30.72"NLongitude 73ol'39.64"Eto the North Latitude I 9'9' 27.36"N LongitudeZ3ll'40.9ElEto the South Latitude l9o9'28. T4"NLongitude 73ol'42.04'Eto the East Latitudelll!-lQ-lll\ Longitude 73o I'37. I 4"Eto the West Of Division KOKAN.village Kausataluka THAI\lEDistrict THANE.PIN - 4006l2.admeasuring 8l00Sq.Mts. area being developed byM/s Al Mantgsha Constructions. Sir. l@have undertaken assignment as Architect ltieensed-Sur*eye+ of certifuing Percentage of Completion of Construction Work of the building project "The Universe"No. of Buitding(s)/1 (Venus) Wing(s) of the A Phaseof the Project l, situated on the plot bearing CN-NeleTS Ne-. /Survey no.@of Division KOKANvillage -I(tlUSATaluka - THAI\IE District THANE (M. CORP) PIN - 4006l2admeasuring 8100.00 Sq,Mts. area being developed by M/s Al Mantasha Construction I . Following technical professionals are appointed by O+vnerlPromoter:- (l)Ml#SS+#Smt Suverna Ghosh as tSJArchitect; ( ii) M/s lShril€srAssociated Consultants ( iii) MA /Shri /Sm+ENVIRO - CONas MEP Consultant (iv) MA /Shri lS*fapyeef almedas Site Supervisor Based on Site Inspection, with respect to each of the Building/Wing ofthe aforesaid Real Estate Project , I certifu that as on the date of this certificate, the Percentage of Work done for each of the building/Wing of the Real Estate Project as registered vide number [P5ffim09797lunder is as per table A herein below. The percentage ofthe work executed with respect to each ofthe activity ofthe entire phase is detailed in Table B. IC t e \). Table A Buitding 1- Venus Ailing A (Gr. Pt + 14tn Floor) Sr. No Tasks /Activity Percentage of work done I Excavation 100% ) L number of Basemen(s)-and Plinth t00% 3 number of Podiums 4 Stilt Floor 100% 5 !1 number of Slabs of Super Stmcture 100% 6 Irrternal walls. Intemal Plaster. Floorings within FlatsPremises, 100% Doors and Windows to each of the FlaVPremises 7 Sanitary Fittings within the Flat/Premises, 90% Electrical Fittings within the Flat/Premises 8 Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases 100% and Lifts, Overhead and Underground Water Tanks 9 The external plumbing and external plaster, elevation, completion of terraces 100% with waterproofing of the Building/Wing, r0 Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per 0% CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment ICRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required I I to Obtain Occupation /Completion Certificate I + e Jtfu TABLE-B Internal & External Development Works in Respect of the entire Registered Phase Sr.N Common areas and Facilities, Proposed Percentage of Details o. Amenities (Yes/IIo) Work done I Internal Roads &Footpaths YES To be Completed before O.C. 2. Water Supply YES To be Completed before O.C 1 J Sewerage (chamber, lines, Septic YES To be Completed before O.C Tank, STP) 4 Storm Water Drains YES To be Completed before O.C 5 Landscaping & Tree Planting YES To be Completed before O.C 6 Street L,ighting YES To be Completed before O.C 7 Community Buildings YES To be Completed before O.C. 8 Treatment and disposal of YES To be Completed before O.C. sewage and sullage water 9 Solid Waste management & YES To be Completed before O.C. Disposal l0 Water conservation, Rain water YES Only Rain Water Harvesting to harvesting be provided & will be Completed before O.C. 1l Energy management YES Solar water Heater & D.G. Set to be provided &. will be Completed before O.C. 12. Fire protection and fire safety, YES To be Completed before O.C requirements r3 Electrical meter room, sub- YES Only Electric Meter room to be station, receiving station provided & will be Completed before O.C. 14. Others ( Option to Add more) Yours Faithfully Jlf,{ Signature' Name: - SUVARNA GHOSH of L.Sl Architect License NO: - CN9lll4324 .Q + 5 ,t \- l1 s P, o I lfi./