SUVARNA Gl]0Sr{ AR(II IIT(I 3rd Floor, Arihant, Agyari Lane, Jambhli Naka, Thane - 400 601. TeI.: 2540 6310.e-mail : suvarnaghosh@gmail.com FORIVI 1 [see Regulation 3l ARCHITECT'S CERTIFICATE Ref:- 04/506-0054-15 12022 Date: 1410212022 To M/s Al Mantasha Construction Address:T/O5 New Aman Apt. Kifayat Colony, Kausa, Thane 400612 Subject:Certificate of Percentage of Completion of Construction Work of building project: The Universe, No. tf guilding(s)/1 Wing(s) I of the Phase of the Project- I [P517000097971situated on the Plot bearing €N,No/e+SN€JSurvey no demarcated by its boundaries (latitude and longitude of the end points) Latitude I9o9' 30.72"Nlongitude 730l'39.64"Eto the North Latitude 1909'27 36"N Longi 1'40.98"Eto the South Latitude l9o9'28. T4"NLongitude 73o1'42.04',8to the East Latitudelg0g' 30. 75"N Longitude 7301'37.14"Eto the west Of Division KOKAN. village Kausa taluka THANE District THANE. PIN - 400612. admeasuring 8100Sq.N4!s. area bein g developed by IWs Al Mantasha Constructions. Sir, I+eSMT. SUVARNA GHOSH have undertaken assignment as Architect ltieenseel-Suweyer of ...tifyilg3.r..ntug€ of Completion of Construction Work of the building project "The Universe" No. of Building(s)/1 (Venus) Wing(s) of the A Phase of the Projectl, situated on the plot bearing €+LN€/CTS |.le-. /Survey no.@ of Division KOKAN village - KAUSA Taluka - THANE District rlr^q.NE fIvI. CoRpt plN - 400612 admeasuring 8100.00 Sq.Mts. area being developed by M/s Al Mantasha Construction l. Following technical professionals are appointed by €\+n€r+Promoter:- (l)M/s/Shri/Smt Suvarna Ghosh as tSJArchitect; (ii) M/s lshri4SmlAssociated Consulm (iii) M/s /Shri/SmIENVIRO - CONas MEP Consultant (iv) L#s /Shri /Sm+Tatycer abuedas Site Supervisor Based on Site Inspection, with respect to each of the BuildingiWing of the aforesaid Real Estate Project , I certify that as on the date of this certificate, the Percentage of Work done for each of the building/Wing of the Real Estate project as registered vide number [PsI700009797]under is as per table A herein below. in The percentage of the work executed with respect to each of the activity of the entire phase is detailed Table B. + Table A Building 1- Venus /Wing A (Gr. Pt + 14th Ftoor) Sr. No Tasks /Activity Percentage of work done I Excavation 100% ) L number of Basement(sland Plinth 100% 3 number of Podiums 4 Stilt Floor 100% 5 15 number of Slabs of Super Structure r00% 6 Internal walls, Internal Plaster, Floorings within Flats/Premises, 100% Doors and Windows to each of the Flat/Premises 7 Sanitary Fittings within the Flat/Premises, 90% Electrical Fittings within the Flat/Premises 8 Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases 90% and Lifts, Overhead and Underground Water Tanks 9 The external plumbing and external plaster, elevation, completion of terraces 90% with waterproofing of the Building/Wing, l0 Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per 0% cFo Noc, Electrical fittings to common Areas, electro, mechanical equipment, Compliance to conditions of environment ICRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate TABLE-B Internal & External Development Works in Respect of the entire Registered Phase Sr.N Common areas and Facilities, Proposed Percentage of Details o. Amenities (Yes/I.{o) Work done I Internal Roads &Footpaths YES To be Completed before O.C. 2 Water Supply YES To be Completed before O.C. J Sewerage (chamber, lines, Septic YES To be Completed before O.C. Tank, STP) 4. Storm Water Drains YES To be Completed before O.C. 5 Landscaping & Tree Planting YES To be Completed before O.C. 6. Street Lighting YES To be Completed before O.C 7 Community Buildings YES To be Completed before O.C 8 Treatment and disposal of YES To be Completed before O.C. sewage and sullage water 9 Solid Waste management & YES To be Completed before O.C. Disposal t0 Water conservation, Rain water YES Only Rain Water Harvesting to harvesting be provided & will be Completed before O.C. I l. Energy management YES Solar water Heater & D.G. Set to be provided & will be Completed before O.C. 12. Fire protection and fire safety YES To be Completed before O.C. requirements l3 Electrical meter room, sub- YES Only Electric Meter room to be station, receiving station provided & will be Completed before O.C. 14. Others ( Option to Add more) Yours Faithfully rl Signa Name: HOSH of LSI Architect License t/14324 {tp