SU\IARNA Gl{Osl{ AR(II IIT(I 3rd Floor, Arihant, Agyari Lane, Jambhli Naka, Thane - 400 601 .Tel.:2540 6310.e-mail : suvarnaghosh@gmail.com FORM I [see Regulation 3l ARCHITECT'S CERTIFICATE Ref:- 46150-0054-l 512021 Date: 1810812021 To M/s Al Mantasha Construction Address:T/05 New Aman Apt. Kifayat Colony, Kausa, Thane 400612 Subject:Certificate of Percentage of Completion of Construction Work of building project: The Universe, No. of Building(s)/l Wing(s) I of the Phase of the Project- l[P517000097971situated on the Plot bearing WSurvey n Thanedemarcated by its boundaries (latitude and longitude of the end points) Latitude 1 9o9' 30.72"Nlongitude 73ol'39.64"E,to the North Latitude 19o 9' 27.36"N LongitudeT3ol'40.98"Eto the South Latitude 19o9'28. T4"Nlongitude 73ol'42.04'Eto the East Latitudel9o9'30. 75"N Longitude 73'l'37.14"8to the West Of Division KOKAN. village Kausataluka THANEDistrict THANE. PIN - 400612, admeasuring 81O0Sq.Mts. area being developed by M/s Al Mantasha Constructions" Sir, IryeSMT. SUVARNA GHOSH have undertaken assignment as Architect @ of certifying Percentage of Completion of Construction Work of the building projectThe Universe No" of Building(s)/1 (Venus) Wing(s) of the A Phaseof the Projectl, situated on the plot bearing e+f=Nolffi Ne--iSurvey no. of Division KOKAN village - KAUSA Taluka - THANE District THANE (M. CORP) PlN4006l2admeasuring 8100.00 Sq.Mts. area being developed by M/s Al Mantasha Construction 1. Following technical professionals are appointed by €ryner+Promoter:- (I)MA/Shr#Smt Suvarna Ghosh as LSJArchitect; (ii) M/s lShriJSml Associated Consultants (iii) MA /Shri ISm+ENVIRO --CoNas MEP Consultant (iv) MA lStrri /SmtTanveer Ahmedas Site Supervisor Based on Site Inspection, with respect to each of the Building/Wing of the aforesaid Real Estate Project . I certify that as on the date of this certificate, the Percentage of Work done for each of the building/Wing of the Real Estate Project as registered vide number [P5l700009797lunder is as per table A herein below. The percentage of the work executed with respect to each of the activity of the entire phase is detailed in Table B. i C) .L E + \ b = J)W Table A Building 1- Venus Ailing A (Gr. Pt + l4th Floor) Sr. No Tasks /Activity Percentage of work done I Excavation 100% ) L number of Basement(sland Plinth 100% 3 number of Podiums 4 Stilt Floor r00% 5 _15 number of Slabs of Super Structure 100% 6 Internal walls, Internal Plaster, Floorings within Flats/Premises, 50% Doors and Windows to each of the Flat/Premises 7 Sanitary Fittings within the Flat/Premises, 25% Electrical Fittings within the Flat/Premises 8 Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases 70% and Lifts, Overhead and Underground Water Tanks 9 The extemal plumbing and external plaster, elevation, completion of terraces 6s% with waterproofing of the Building/Wing, l0 Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per 0% CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment ICRZ NOC, Finishing to entrance lobby/s, piinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate JIW TABLE.B Internal & External Development Works in Respect of the entire Registered Phase Sr.N Common areas and Facilities, Proposed Percentage of Details o. Amenities (Yes/l',lo) Work done 1 Internal Roads &Footpaths YES To be Completed before O.C 2 Water Supply YES To be Completed before O.C a J Sewerage (chamber, lines, Septic YES To be Completed before O.C Tank, S'fP) 4 Storm Water Drains YES To be Completcd before O.C. 5 Landscaping & Tree Planting YES To be Completed before O.C 6 Street Lighting YES To be Completed before O.C 7 Community Buildings YES To be Completed before O.C 8 Treatment and disposal of YES To be Completed before O.C. sewage and sullage water 9 Solid Waste management & YES To be Completed before O.C Disposal 10. Water conservation, Rain water YES Only Rain Water Harvesting harvesting to be provided &. will be Completed before O.C. I l. Energy management YES Solar water Heater & D.G. Set to be provided & will be Completed before O.C. 12. Fire protection and fire safety YES To be Completed betbre O.C requirements 13. Electrical meter room, sub- YES Only Electric l\'leter room to station, receiving station be provided & will be Completed before O.C. 14. Others ( Option to Add more) Yours Faithfully rtp Signature Name: - SUVARNA GHOSH of LSI Architect License NO: - CN9lll4324 ! t t\ t C' 76 * 1-- o .;r