SUVARNA Gl{05l.l AR(flIIT(I 3rd Floor, Arihant, Agyari Lane, Jambhli Naka, Thane - 400 601 . Tel.: 2540 6310.e-mail : suvarnaghosh@gmail.com FORM I [see Regulation 3] ARCHITECT'S CERTIFICATE Date: 09/0312021 To M/s Al Mantasha Construction Address: T/05 New Aman Apt. Kifayat Colony, Kausa, Thane 400612 Subject: Certificate of Percentage of Completion of Construction Work of building project: The Universe, No. of Building(s)/ I Wing(s) 1 of the Phase of the Project- I [P5f 7000097971situated on the Plot bearing Wsurvey no,/FinalPlet-ne 112. H. NO. I at Village: Kausa. Thane demarcated by its boundaries (latitude and longitude of the end points) Latitude 19o 9' 30.72"Nlongitude 73o1',39.64"8 to the North Latitude 19o 9' 27.36"N LongitudeT3ol'40.98"E to the South Latitude l9o 9' 28. T4"Nlongitude 73o1',42.04',8 to the East Latitudel90 9' 30. 75"N Longitude 73ol'37.14"8 to the west Of Division KOKAN village Kausa taluka THANE District THANE PIN 4006f2 admeasuring 8100ss.!4!s. Area being developed by lWs Al Mantasha Constructions Sir, Irye-SMT. SUVARNA GHOSH have undertaken assignment as Architect,trieensed-Surreyor of certifying Percentage of Completion of Construction Work of the building project The Universe No. of Building(s)/1 (Venus) Wing(s) of the A Phase of the Project l, situated on the plot bearing elLlIe€,TS Ne-. /Survey no. f Division KOKAN village KAUSA talUka THANE District THANE (M. CORP) PIN400612 admeasuring 8100.00 Sq.Mts. area being developed by M/s Al Mantasha Construction l. Following technical professionals are appointed by O\nm€r+Promoter:- (I) MA/S'hrilSmt Suvarna Ghosh as L*lArchitect; (ii) M/s lshri+SmtAssociated Consulm (iii) M/s /Shri /Sffit ENVIRO - CON as MEP Consultant (iv) Mls lShri l€mrlanveer Ahmed as Site Supervisor a cN$\\\1111 t Based on Site Inspection, with respect to each of the Building/Wing of the aforesaid Real Estate Project , I certify that as on the date of this certificate, the Percentage of Work done for each of the building/Wing of the Real Estate Project as registered vide number [P51700009797]under is as per table A herein below. The percentage of the work executed with respect to each of the activity of the entire phase is detailed in Table B. Table A Building 1- Venus Ailing A (Gr. Pt + l4th Floor) Sr. No Tasks /Activity Percentage of work done I Excavation t00% 2 l_ number of Basement(sland Plinth 100% 3 number of Podiums 4 Stilt Floor 100% 5 15 number of Slabs of Super Structure t00% 6 Intemal walls, Internal Plaster, Floorings within FlatslPremises, 60% Doors and Windows to each of the Flat/Premises 7 Sanitary Fittings within the Flat/Premises, 35% Electrical Fittings within the Flat/Premises 8 Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases 60% and Lifts, Overhead and Underground Water Tanks 9 The external plumbing and external plaster, elevation, completion of terraces 65% with waterproofing of the Building/Wing, l0 Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per 5% CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment ICRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate r51r cN\g\\\l ,4 ,\. I TABLE-B Internal & External Development Works in Respect of the entire Registered Phase Sr. Common areas and Facilities, Proposed Percentage of Details No. Amenities (Yes/l{o) Work done I lnternal Roads &Footpaths YES To be Completed before O.C. 2 Water Supply YES To be Completed before O.C. J Sewerage (chamber, lines, Septic YES To be Completed before O.C Tank, STP) 4 Storm Water Drains YES To be Completed beiore O.C 5 Landscaping & Tree Planting YES To be Completed before O.C 6 Street Lighting YE,S To be Completed before O.C 7 Community Buildings YES To be Completed before O.C 8 Treatment and disposal of YES To be Completed before O.C. sewage and sullage water 9 Solid Waste management & YES To be Completed before O.C. Disposal 10. Water conservation, Rain water YES Only Rain Water Harvesting to harvesting be provided & will be Completed before O.C. l1 Energy management YES Solar water Heater & D.G. Set to be provided & will be Completed before O.C. 12. Fire protection and fire safety YES To be Completed before O.C. requirements 13. Electrical meter room, sub- YES Only Electric Meter room to be station, receiving station provided & will be Completed before O.C. 14. Others ( Option to Add more) Yours Faithfully l\p Signature Name: - SUVARNA GHOSH of L.Sl Architect License NO: - CN9lll4324 v j cAnll1-1:? ;,') I (.,'