AnnexureA FORM 1 [see Regulation 3] ARCHITECT'S CERTIFICATE {To be submitted at the time of Registration of Ongoing Project and for withdrawal of Money from Designated Account) Date: 20/07/2026 (Information as on: 31/06/2026) To, F/201, Nandadeep residency, survey nos.3/1b, 4/1, 4/2, 4/3, 4/4a2, 4/4b, 81/1b, Vadavali tarfe Varedi, Karjat, Raigad, Maharashtra 410 201 Subject: Certificate of percentage of Work of completion of construction work of NANDADEEP RESIDENCY having MahaRERA Registration Number P51700009698 (Only Applicable after project Registration) being developed by NANDADEEP HOMES PVT. LTD. Sir, I/We, Sunil Jagnar Architects have undertaken assignment as Architect /Licensed Surveyor of certifying Percentage of completion of Construction Work of NANDADEEP RESIDENCY having MahaRERA Registration Number P51700009698 (Only Applicable after project Registration, being developed by NANDADEEP HOMES PVT. LTD.) Based on Site Inspection, with respect to Layout / each of the Building/Wing of the aforesaid Real Estate Project I certify that as on the date of this certificate, the Percentage of Work done for each of the building/Wing of the Real Estate Project under MahaRERA is as per Table A herein below. The percentage of the work executed with respect to each of the activities of the entire phase is detailed in Table B. Table A Phase I, Building No-02 (Wing F/E/D) 01 Number of Building Comprising of 3 Wings Percentage of Actual Work Sr. Tasks/Activity Done No. (As on date of the Certificate) (1) (2) (3) 1 Excavation 100.00 2 Basements (if any) 100.00 3 Podiums (if any) NA 4 Plinth, 100.00 5 Stilt Floor 100.00 6 Slabs of Super Structure 100.00 7 Internal walls, Internal plaster, Floorings, Floors and windows within Flats/Premises 100.00 8 Sanitary Fitting within the Flat/Premises 100.00 Staircases, lifts Wells and Lobbies at each Floor level Overhead and Underground 9 100.00 Water Tanks External plumbing and external plaster, elevation, completion of terraces with waterproofing 10 100.00 of the building/wing. Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions of environment/CRZ NOC, 11 Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, 100.00 Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. Any other activities. Table A Phase II, Building No-A1-A2, 01 Number of Building Comprising of 2 Wings Percentage of Actual Work Tasks/Activity Done (As on date of the Certificate) (1) (2) (3) 1 Excavation 100.00 2 Basements (if any) 100.00 3 Podiums (if any) NA 4 Plinth, 100.00 5 Stilt Floor NA 6 Slabs of Super Structure 100.00 7 Internal walls, Internal plaster, Floorings, Floors and windows within Flats/Premises 100.00 8 Sanitary Fitting within the Flat/Premises 100.00 Staircases, lifts Wells and Lobbies at each Floor level Overhead and Underground 9 100.00 Water Tanks External plumbing and external plaster, elevation, completion of terraces with waterproofing 10 100.00 of the building/wing. Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions of environment/CRZ NOC, 11 Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, 100.00 Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. Any other activities. Table A Phase Ill, Building No-C1-C2, 01 Number of Building Comprising of 2 Wings Percentage of Actual Work Tasks/Activity Done (As on date of the Certificate) (1) (2) (3) 1 Excavation 100.00 2 Basements (if any) 100.00 3 Podiums (if any) NA 4 Plinth, 100.00 5 Stilt Floor NA 6 Slabs of Super Structure 100.00 7 Internal walls, Internal plaster, Floorings, Floors and windows within Flats/Premises 100.00 8 Sanitary Fitting within the Flat/Premises 100.00 Staircases, lifts Wells and Lobbies at each Floor level Overhead and Underground 9 100.00 Water Tanks External plumbing and external plaster, elevation, completion of terraces with waterproofing 10 100.00 of the building/wing. Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions of environment/CRZ NOC, 11 Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, 100.00 Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. Any other activities. Table A Phase IV, Building No-A3-A4, 01 Number of Building Comprising of 2 Wings Percentage of Actual Work Tasks/Activity Done (As on date of the Certificate) (1) (2) (3) 1 Excavation 100.00 2 Basements (if any) 100.00 3 Podiums (if any) NA 4 Plinth, 100.00 5 Stilt Floor NA 6 Slabs of Super Structure 100.00 7 Internal walls, Internal plaster, Floorings, Floors and windows within Flats/Premises 100.00 8 Sanitary Fitting within the Flat/Premises 100.00 Staircases, lifts Wells and Lobbies at each Floor level Overhead and Underground 9 100.00 Water Tanks External plumbing and external plaster, elevation, completion of terraces with waterproofing 10 100.00 of the building/wing. Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions of environment/CRZ NOC, 11 Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, 100.00 Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. Any other activities. Table A Phase V, Building No-C3-C4, 01 Number of Building Comprising of 2 Wings Percentage of Actual Work Tasks/Activity Done (As on date of the Certificate) (1) (2) (3) 1 Excavation 100.00 2 Basements (if any) 100.00 3 Podiums (if any) NA 4 Plinth, 100.00 5 Stilt Floor NA 6 Slabs of Super Structure 100.00 7 Internal walls, Internal plaster, Floorings, Floors and windows within Flats/Premises 100.00 8 Sanitary Fitting within the Flat/Premises 100.00 Staircases, lifts Wells and Lobbies at each Floor level Overhead and Underground 9 100.00 Water Tanks External plumbing and external plaster, elevation, completion of terraces with waterproofing 10 100.00 of the building/wing. Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions of environment/CRZ NOC, 11 Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, 100.00 Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. Any other activities. Table A Phase VI, Building No-CS, 01 Number of Building Comprising of 1 Wing Percentage of Actual Work Tasks/Activity Done (As on date of the Certificate) (2) (3) 1 Excavation 100.00 2 Basements (if any) 100.00 3 Podiums (if any) 100.00 4 Plinth, 100.00 5 Stilt Floor 100.00 6 Slabs of Super Structure 100.00 7 Internal walls, Internal plaster, Floorings, Floors and windows within Flats/Premises 100.00 8 Sanitary Fitting within the Flat/Premises 35.00 Staircases, lifts Wells and Lobbies at each Floor level Overhead and Underground 9 90.00 Water Tanks External plumbing and external plaster, elevation, completion of terraces with waterproofing 10 96.00 of the building/wing. Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions of environment/CRZ NOC, 11 Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, 0.00 Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. Any other activities. Table A Phase VII, Building No-A5-A6-A7, 01 Number of Building Comprising of 3 Wings Percentage of Actual Work Tasks/Activity Done (As on date of the Certificate) (1) (2) (3) 1 Excavation 100.00 2 Basements (if any) 100.00 3 Podiums (if any) 100.00 4 Plinth, 100.00 5 Stilt Floor 100.00 6 Slabs of Super Structure 100.00 7 Internal walls, Internal plaster, Floorings, Floors and windows within Flats/Premises 100.00 8 Sanitary Fitting within the Flat/Premises 100.00 Staircases, lifts Wells and Lobbies at each Floor level Overhead and Underground 9 100.00 Water Tanks External plumbing and external plaster, elevation, completion of terraces with waterproofing 10 100.00 of the building/wing. Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions of environment/CRZ NOC, 11 Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, 0.00 Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. Any other activities. Table A Phase VIII, Building No-A12-A13-A14, 01 Number of Building Comprising of 3 Wings Percentage of Actual Work Tasks/Activity Done (As on date of the Certificate) (1) (2) (3) 1 Excavation 0.00 2 Basements (if any) 0.00 3 Podiums (if any) NA 4 Plinth, 0.00 5 Stilt Floor NA 6 Slabs of Super Structure 0.00 7 Internal walls, Internal plaster, Floorings, Floors and windows within Flats/Premises 0.00 8 Sanitary Fitting within the Flat/Premises 0.00 Staircases, lifts Wells and Lobbies at each Floor level Overhead and Underground 9 0.00 Water Tanks External plumbing and external plaster, elevation, completion of terraces with waterproofing 10 0.00 of the building/wing. Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions of environment/CRZ NOC, 11 Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, 0.00 Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. Any other activities. Table A Phase IX, Building No-A8-A9, 01 Number of Building Comprising of 2 Wings Percentage of Actual Work Tasks/Activity Done (As on date of the Certificate) (1) (2) (3) 1 Excavation 0.00 2 Basements (if any) 0.00 3 Podiums (if any) NA 4 Plinth, 0.00 5 Stilt Floor NA 6 Slabs of Super Structure 0.00 7 Internal walls, Internal plaster, Floorings, Floors and windows within Flats/Premises 0.00 8 Sanitary Fitting within the Flat/Premises 0.00 Staircases, lifts Wells and Lobbies at each Floor level Overhead and Underground 9 0.00 Water Tanks External plumbing and external plaster, elevation, completion of terraces with waterproofing 10 0.00 of the building/wing. Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions of environment/CRZ NOC, 11 Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, 0.00 Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. Any other activities. Table A Phase X, Building No-A10-A11, 01 Number of Building Comprising of 2 Wings Percentage of Actual Work Tasks/Activity Done (As on date of the Certificate) (1) (2) (3) 1 Excavation 0.00 2 Basements (if any) 0.00 3 Podiums (if any) NA 4 Plinth, 0.00 5 Stilt Floor NA 6 Slabs of Super Structure 0.00 7 Internal walls, Internal plaster, Floorings, Floors and windows within Flats/Premises 0.00 8 Sanitary Fitting within the Flat/Premises 0.00 Staircases, lifts Wells and Lobbies at each Floor level Overhead and Underground 9 0.00 Water Tanks External plumbing and external plaster, elevation, completion of terraces with waterproofing 10 0.00 of the building/wing. Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions of environment/CRZ NOC, 11 Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, 0.00 Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. Any other activities. Table A Phase XI, Building No-B1-B2, 01 Number of Building Comprising of 2 Wings Percentage of Actual Work Tasks/Activity Done (As on date of the Certificate) (1) (2) (3) 1 Excavation 100.00 2 Basements (if any) 100.00 3 Podiums (if any) NA 4 Plinth, 100.00 5 Stilt Floor NA 6 Slabs of Super Structure 50.00 7 Internal walls, Internal plaster, Floorings, Floors and windows within Flats/Premises 0.00 8 Sanitary Fitting within the Flat/Premises 0.00 Staircases, lifts Wells and Lobbies at each Floor level Overhead and Underground 9 0.00 Water Tanks External plumbing and external plaster, elevation, completion of terraces with waterproofing 10 0.00 of the building/wing. Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions of environment/CRZ NOC, 11 Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, 0.00 Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. Any other activities. Table B Common Areas (Internal and External Development Works) in respect of Registered Phase / Project Number) Percentage of Actual Work Is Available (Yes/ Done Common areas and facilities Details No) (As on date of the Certificate) (2) (3) (4) (5) � As per 1 Internal Roads & Footpaths Yes 100.00 standard As per 2 Water Supply Yes 100.00 standard Sewerage (Chamber, Lines, Septic Tank , As per 3 Yes 80.00 STP) standard As per 4 Storm Water Drains Yes 90.00 standard As per 5 Landscaping & Tree Planting Yes 100.00 standard As per 6 Street Lighting Yes 100.00 standard As per 7 Community Buildings Yes 100.00 standard Treatment And Disposal of Sewage and 8 No 0.00 NA Sullage Water � Solid Waste Management and Disposal No 0.00 NA As per 10 Water conservation / Rain-water harvesting Yes 100.00 standard Energy management No 0.00 NA Fire protection and fire safety requirements No 0.00 NA � Electrical meter room, sub-station, receiving As per 13 Yes 85.00 station standard As per 14 Aggregate area of recreational Open Space Yes 85.00 standard As per 15 Open Parking Yes 90.00 standard As per 16 Fitness Room Yes 100.00 standard As per 17 Swimming Pool Yes 100.00 standard Note: Building (A5, A6, A? & C5) are being developed by Ashwamegh Construction. Building (B1 & B2) are being developed by Sugoni Developers. Yours Faithfully Sunil Jagnar Architects Digitally signed by SUNIL BABAN SUNIL BABAN JAGNAR JAGNAR Date: 2026.07.20 16:37:15 +05'30' Signature & Name (IN BLOCK LETTERS) of L.S/ Architect (License No: CA/2020/128580) Date of Certificate: 20/07/2026 Agreed and accepted by: Signature of Promoter Name: NANDADEEP HOMES PVT. LTD. Date: 20/07/2026