r I I Associqt@s {,chitects, {Qgd. cQa[uers Qngineers, clnterior {}esignars 304, Vardhaman Shopping Centre, 3rd Floor, Manpada Road, Dombivli (E) 421201 Shop No. 1, Rajshree Tower, Rambaug Lane No. 6, Kalyan (W 421 304. FORM 1 [see Regulation 3] ARCH ITECT'S CERTI FICATE Dale:28.07.2Ot7 To, M/S. Diksha Developers, Malhar venu, shop No.2 B-wing, Mahatma phule road, Garibacha Wada, Dombivli West. Subject : Certificate of Percentage of Completion of Construction Work of Building No 1 A & B - Wing of the Project Sajjan Heights IMahaRERA Registration Number] situated on the Plot bearing Survey No. 164 & 29 Hissa No. 6 demarcated by its boundaries (latitude and longitude of the end points) 6.00 M.wide internal Road H.Ns.2 & 3,4 to the North, New Survey No. 29 (Old Survey No. 164) Hissa No. 7 & 10 to the South, New Survey No. 31 (Old Survey No. 344) Hissa No. 26 to the East, New Survey No. 29 (Old Survey No. 164) Hissa No. 12 & 13 to the West of Division Village Shivajinagar taluka Kalyan District Thane PIN 421202 admeasuring 1920.00 Sq. Mtrs. area being developed by M/s. Diksha Developers. Sir, I Mr. Tibin Tonson Thomas Partner of M/s. De-con Associates have undertaken assignment as Architect of certifying Percentage of Completion of Construction Work of the Two Buildings 1 A & B Wings of the Project SajjanHeightsPhaseoftheProject,situatedontheplotbearingPlotbearingSurveyNo. 154&29HissaNo.6 of Division Village Shivajinagar taluka Kalyan District Thane PIN 421202 admeasuring L920.00 Sq. Mtrs. area being developed by M/s. Diksha Developers. 1. Following technical professionals are appointed by Owner / Promoter :- (i) Mr. Tibin Tonson Thomas Partner of M/s. De-con Associates as Architect ; (ii) Mr. Rajesh Thakre as Structural Consultant/RCC Engineer; (''l)Mr. as site supervisor. Based on Site lnspection, with respectto each of the Wings of the aforesaid Real Estate Project, lcertifythatas on the date of this certificate, the Percentage of Work done for each of the building/Wing of the Real Estate Project as registered vide number under MahaRERA is as per table A herein below. The percentage of the work executed with respect to each of the activity of the entire phase is detailed in Table B. For DE-CON ASSOCIATES a;uA,@ / TABLE. A PROJECT - SAJJAN HEIGHTS BLDG NO 1 (A-WING) -DOMBIVLI W Percentage Percentage of Work of Work Sr. No. Tasks/ Activity done B done A Wing Wing .700% \ Excavation LOO% 2 Plinth 700% lOOo/o 3 No. of Podiums 4 Stilt Floor 60% ].00% 5 Two number of Slabs for A Wing and First number of Slabs for B Wing of Super 40% too% Structure 5 lnternal Walls, lnternal Plaster, Floorings with in Flats/Premises, Doors and o% o% Windows to each of the Flats/ Premises 7 Sanitary Fittings with in the Flat/Premises, Electrical Fittings with in the o% o% Flat/Premises 8 Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, o% o% Overhead and Underground Water Tanks 9 The external plumbing and external plaster, elevation, completion of terraces o% o% with water proofing of the Buildine/wing t0 lnstallation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment/CRZ NOC, Finishing to 0% o%. entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to obta in Occupation/Com pletion Certificate FOTDE.CON ASSOCIATES 7.,0"9ry PARINER TABLE - B PROJECT - SAJJAN HETGHTS BLDG NO 1 (A-W|NG)-DOMB|VL! (W) lnternal& External Works in of the entire Project Common areas and Facilities, Proposed %of Sr. No. Work Amenities (ves/lrto) Details done 1 lnternal Roads & Footpaths Yes o% 2 Water Supply Water Supply will be Yes Oo/o provided by KDMC 3 Sewerage (chamber, lines Septic The Building Sewarage Tank, STP) will be connected with Yes o% KDMC underground Sewerage line. 4 Strom Water Drains No N.A. 5 Landscaping & Tree Planting Yes o% Minimum 15 Trees 6 Street Lighting No N.A. 7 Community Buildings No N.A. 8 Treatment and disposal of sewage Sewage will be and suilage water discharged/connected No N.A. with KDMC drainage 9 Solid Waste management & Disposal No N.A. 10 Water conservation, Rain water Rain Water Harvesting harvesting Yes o% 11 Energy management Yes o% Solar System t2 Fire protection and fire safety Fire Safety Measures requirements Yes o% will be installed 13 Electrical meter room, sub- 1 Electric Meter station, receiving station Room/Space for Each Yes o% Wing 74 One society office, common Toilet Yes o% & common entrance lobby Yours Faithfully, For De-con Associates a,eeY Mr. Tibin Tonson Thomas Paftner ( License No. CA/2016/78885)