STRUCTURAI. CO NSUTTANT CHARTEREDENGINEER VALUER PROJECTAAAI{AGEMENT CONSULTANT R.C.TIPNIS B.E.(CMLI,M.r.E. 'SANJRA.f', G. V.SCHEME-2,MULUND(E),MUMBAI- 400 081. o TEI : 21634t9I . 2t6g tg99 o CELI-: 98200 56799 . E-MAIL: rctipnis@gmoil.com FORM-2 ENGINEER'S CERTIFICATE Date:23/07/2,tz To, M/s. ConcordeRealty, CosmosHouse, SantGyaneshwarMarg Panchpakadi, Thane(W). - Pin 400602. subject:certificate of cost Incurredfor Developmentof "cosmos Meluha,,for construction work of 10 Buifding(s)situatedon the Plotbearingsurveyno.tsslLlB,tssl4ltll, ts6lz, Lstltl1, ts712, t62lt demarcated by its boundaries(latitudeandlongitudeof the end points)tgog}L.l7" N,7go4g,2g,,E _ to the North190914,02" N,73'3044.71'Eto the South lgog'!1.!0" N ,1go3,4g.47,Eto the East L9o9'l7'47" N,7303'44.20"E to the West, shillPhataRoad60 Mtr., to the souths.No.160,1G9,to the Easts'No' 158& 159,to the west S.No.15517ofDivisionKhidkalivillage ThanetalukaThane DistrictThanePIN421204admeasurin gt637osq.mts.Areabeingdevelopedby concordeRealty. Ref.RERA Registration NumberNew Sir, I R'c'Tipnishaveundertakenassignment of certifying Estimated costfor thesubjectRealEstate project proposed to be registered underRERA, being10Building(s) situatedonthe plotbearingcrs No.survey no.tSiltlB,tssl4luB, ts6l2, tstltl}, tst12 , t62lt of villageKhidkali talukaThaneDistrictThaneptN 421204admeasuring L6g7osq.mts.Areabeingdeveloped by concordeRealty. L. Following technical professionals areappointed byconcorde Realty:- (i) Smt Suvarna GhoshasArchitect ; M\,n- (ii) Mr. R.C.TipnisasStructural Consultant (iii) M/s ElectroMechConsultants asMEpConsultant (iv) Mr.SagarChavanasSiteSupervisor STRUCTURAL CONSULTANT CHARTEREDENGINEER VALUER PROJECT MANAGEMENT CONSULTANT R.C.TIPNIS B.E.(CtVtL), M.t.E. 'SANJRAI', G. V SCHEME-2,MULUND(E),MUMBAI- 4OOOBl. o TEL : 2163 4791. 216313gg . CELL: 98200 56799 . E-MAIL: rcripnis@gmoil.com 2' I haveestimatedthe costof the completionto obtainoccupation certificate/ completioncertificate, of the civil,MEPand Alliedworks,of the Building(s) of the project.our estimatedcostcalculationsare basedon the Drawings/ plansmadeavailableto us for the project underreferenceby the Developerand consultant andthe Scheduleof timesand quantityfor the entireworkas calculated by Mr. sagarchavan- site supervisorappointedby Developer/Engineer, andthe assumptionof the costof material,labourand other inputsmadeby developer,and the site inspectioncarriedout by us. 3' we estimateTotalEstimatedcost of completionof the building(s) of the aforesaidprojectunder referenceas Rs.2,98,28,4271'. TheestimatedTotalcost of projectis with referenceto the Civil,MEp,and alliedworksrequiredto be completedfor the purposeof obtainingoccupation certificate/ completion certificatefor the building(s) from the ThaneMunicipalCorporationbeingthe planningAuthorityunder whosejurisdictionthe aforesaidprojectis beingimplemented. 4. TheEstimatedCostIncurredtilldate is calculated at Rs.94,57,7g2/-,The amountof EstimatedCost Incurredis calculatedon the baseof amountof TotalEstimatedcost. 5' ThePlanning costof Completion of the civil,MEPandAlliedworksof the Building(s) of the subject projectto obtainoccupationCertificate/ CompletionCertificate from ThaneMunicipalcorporation (planningAuthority)is estimatedat Rs.2,03,70,6951_. 6' I certifythat the cost of the Civil,MEPand alliedwork for the aforesaidproject as completedon the dateof this certificateis asgivenin TableA and B Below. \ I\ ll A^TqYYY\ \\iVYYI' STRUCTURAL CONSUTTANT CHARTEREDENGINEER VATUER PROJECT IV1AMGEMENT CONSUTTANT R.C.TIPNIS B.E.{CMrl.M.t.E. 'SANJRA,', G.v. scHE4E-2,MUIUND(E),MUMBAI - 4ooo8l. o TEI : 21634791. 2,t63tggg o CELL: 9820056799. E-^AAlt: rcfipnis@gmoil.com TABLE-A Buildingcalledas Omkara7 Sr.No. Particulars Amounts 1 TotalEstimated costof the building(s)/wingason 30/06/2017dateof Registrationis Rs.2r4O,85,75U- 2 Ason 30/06l2OL7Costincurred(basedon the Rs.83,59,812l- Estimated cost) 3 Workdonein Percentage 34.7e4 (asPercentage of the estimatedcost) 4 Balance Costo be Incurred (Based on Estimated Cost) Rs.t,57,25,9391- 5 CostIncurred on Additional/Extraltemsason 3O/06/2OL7not includedin the Estimated Cost (Annexure A) Rs.0/- tw{* STRUCTUMLCONSULTANT CHARTEREDENGlNEER VATUER PROJECT AAANAGEMENT CONSULTANT R,C.TIPNIS B.E.(CtVtLl, M.t.E. 'SANJRAJ', c. v SCHEME-2,MUIUND(E),MUMBAT - 400 081. . TEL ,2163 4791. 2163 4sgg . CELL: 98200 56799 . E-MAIL: rctipnis@gmoil.com - B TABTE Sr.No. Particulars Amounts 1 TotalEstimatedcostofthe lnternaland External DevelopmentWorksincludingamenitiesand Rs57,42,6761- Facilities in the layoutas on 3O/6/2017dateof Registration is 2 Costincurredason 30106/2017 (basedon the Estimatedcost) Rs.tO,97,92Ol- 3 Work done in Percentage t9.Lt% (asPercentage of the estimatedcost) 4 BalanceCostto be lncurred (Basedon EstimatedCost) Rs.46,44,756l- 5 CostIncurredon Additional/ Extraltemsas on 3O/6/20t7 not includedin the EstimatedCost (AnnexureA) Rs.0/- YoursFaithfullv )Ywl StructuralEngineer T.M.C.Regn.No. 1035 Annexure A List of Extra/ AdditionalItemsexecutedwith Cost NIL