STRUCTUMT CONSUTTANT CHARTERED ENGINEER VALUER PROJECT MANAGEMENT CONSUTTANT R.C.TIPNIS B.E.(Ctvtrl, M.t.E. 'SANJRA,',, c. V.SCHEME_2, MULUND(E),MUMBAT _ 400 08l. . TEL :2163 4791. . CELI: 98200 56799. E_MA|L 2163 43gg : rcipnis@sioil..o. F O R M- 2 ENGINEER'S CERTIFICATE Date:23/07/2017 To, M/s. ConcordeRealty, CosmosHouse, SantGyaneshwarMarg, Panchpakadi, Thane(W). - Pin 400602. Subiect:Certificateof Cost Incurredfor Developmentof "CosmosMeluha,,for Construction Work of 10 Building(s)situated on the Plot bearingsuruey no. tssltlB,tssl4ltll, ts6l2, tstltlB, ts712 , t62lt demarcatedby its boundaries(latitude and longitudeof the end points) Lgog20.l7, N,7go4g.2g,E _ totheNorth190914.02'N,73'3o44.71'EtotheSouth Lgog'Ll.LO"N,z3o3,4g.47,EtotheEast t9"9'17.47" N,7303'44.20' E to the West, ShillPhataRoadG0Mtr., to the SouthS.No. 1G0,169,to the EastS.No.158 & 159,to the West S.No. t55/7 of DivisionKhidkali villageThanetaluka Thane DistrictThaneP,N 4zl2o4admeasuringt6370sq.mts. Area beingdevelopedby Concorde Realty. Ref.RERARegistrationNumber New Sir, I R.C.Tipnishaveundertakenassignment of certifyingEstimatedCostfor the SubjectRealEstateproject proposedto be registeredunder RERA, being10 Building(s)situatedon the plot bearingCTSNo. Survey no. t'SltlB'tssl4ltlB, t5612, t57ltls, L5712, t62lt of villageKhidkati talukaThane DistrictThane plN 421204admeasuring L63lo sq.mts.Areabeingdevelopedby concordeRealty. L. Following (i) professionals technical Smt Suvarna areappointed byconcorde GhoshasArchitect ; Realty:- w\y (ii) Mr. R.C.TipnisasStructural Consultant (iii) M/s ElectroMechConsultants asMEpConsultant (iv) Mr.Sagar ChavanasSiteSupervisor STRUCTURALCONSULTANT CHARTERED ENGINEER VALUER PROJECT I,IANAGEMENT CONSULTANT R.C.TIPNIS B.E.(CrVlL), M.r.E. 'SANJRAJ', G.V.SCHEME-2, MULUND - 400081.. TEL:2163 4791. 21634399 (E),MUMBAI : 9820056799. E-MAIL o CELL : rctipnis@gmoil.com 2' I haveestimatedthe costof the completionto obtainOccupationCertificate Completion / Certificate, of the Civil,MEPand Alliedworks,of the Building(s) of the project.our estimatedcostcalculationsare basedon the Drawings/ plansmadeavailableto usfor the projectunderreferenceby the Developerand consultantand the scheduleof times and quantityfor the entirework as calculatedby Mr. sagarChavan- SiteSupervisorappointedby Developer/Engineer, andthe assumptionof the costof material,labourand other inputsmadeby developer,and the site inspectioncarriedout by us. 3. we estimateTotalEstimatedCostof completionof the building(s) of the aforesaidprojectunder referenceas Rs.3,79,59,8481'. TheestimatedTotalCostof projectis with referenceto the Civil,MEp,and alliedworksrequiredto be completedfor the purposeof obtainingoccupationcertificate completion / certificatefor the building(s) from the ThaneMunicipalcorporationbeingthe planningAuthorityunder whosejurisdictionthe aforesaidprojectis beingimplemented. 4. TheEstimatedCostlncurredtill date is calculated at Rs.1,20,35,g711-.The amountof EstimatedCost Incurredis calculatedon the baseof amountof TotalEstimatedcost. 5. ThePlanningcostof Completionof the Civil,MEPandAlliedworksof the Building(s) of the subject projectto obtainOccupationCertificate/ CompletionCertificate from ThaneMunicipalCorporation (planningAuthority)is estimatedat Rs.2,59,29,9791-. 5. I certifythat the Costof the Civil,MEPand alliedwork for the aforesaidprojectas completedon the dateof this certificateis asgivenin TableA and B Below. ltfhy* STRUCTURAL CONSULTANT CHARTEREDENGINEER VATUER PROJECT AAANAGEMENT CONSUTTANT R.C.TIPNIS B.E.(ClvtL),M.t.E. ,SANJRA"'" G. V.SCHEME-2,MULUND(E),MUMBAI- 4OO081. . TEL I2163 4791. 2169 4399 . CELL: 98200 56799 . E-MAIL: rcripnis@gmoil.com TABIE.A Buildingcalledas Omkara5 TotalEstimatedcostof the building(s)/wingason 30/06/2017date of Registrationis Rs.3,06,51,58U- Ason 30/06/2017 Costincurred (based onthe Rs. 1,06,38,750/- Estimated cost) Workdonein Percentage (asPercentage of the estimatedcost) BalanceCostto be Incurred (Basedon EstimatedCost) Rs.2,@,12,9311- CostIncurredon Additional/Extraltemsason 30/06/2017not includedin the EstimatedCost (AnnexureA) Mi,- STRUCTUML CONSUTTANT CHARTERED ENGINEER VALUER PROJECT MANAGEMENT CONSULTANT R.C.TIPNIS B.E.(CtVtLl, M.t.E. 'SANJRAJ" G. V.SCHEME.2, MULUND(E},MUMBAI. 4OOO8I. . TEL :2163 4791. 2163 43gg . CELL:98200 56799o E-MAIL:rcripnis@gmoil.com TABLE- B Sr.No. Particulars Amounts t Total Estimatedcostof the Internaland External Development Worksincludingamenitiesand Rs73,O8,167l- Facilities in the layoutas on 30/6/2017dateof Registration is 2 Costincurredas on 30/0612077(basedon the Estimatedcost) Rs.L3,97,22O1- 3 Work done in Percentage L9.LL% (asPercentage of the estimatedcost) 4 BalanceCostto be lncurred (Basedon EstimatedCost) Rs.59,1O,947l- 5 Costlncurredon Additional/ Extraltemsas on 30/6/2077not includedin the EstimatedCost (AnnexureA) Rs.0/- YoursFaithfully ltVtnl*n, l- R.C.Tipnis StructuralEngineer T.M.C.Regr.No. 1035 AnnexureA List of Extra / AdditionalItemsexecutedwith Cost NIL