STRUCTURATCONSUTTANT CHARTEREDENGINEER VAI-UER PROJECTMANAGEMENT CONSULTANT R.C.TIPNIS 8.E.(Ctvtl),M.l.E. 'SANJRAJ" c. v SCHEME_2, MULUND(E),MUMBAI- 4OO o o CELL: 98200 5b799. E-MAIL: raipnis@smoil..ornO8l. TEL :2163 4791. 2163 4399 FORM-2 ENGINEER'SCERTIFICATE Date:23/07/20L7 To, M/s. ConcordeRealty, Cosmos House, SantGyaneshwarMarg, Panchpakadi, Thane(W). Pin- 400602. subiect:Certificate of cost Incurredfor Development of "cosmosMeluha,,for constructionWorkof 10 Buifding(s) situatedon the Plotbearingsurveyno.tssltlB,tssl4ltll, ts6l2, tstltlB, tst12 , t6zlt demarcated by its boundaries (latitudeandlongitudeof the endpoints)tgog20.l7, N,73o4g.2g,,E _ totheNorth190914,02'N,73'3044.71" EtotheSouth Lgog'L7,to"N,7303,4g.47,EtotheEast L9o9'17 .47' N,7303'44.20'E to the west, shillPhataRoadG0Mtr.,to the souths.No.16O169,to the Easts'No' 158& 159,to the west S.No.15517of DivisionKhidkaliviilage ThanetalukaThane DistrictThanePIN421204admeasurin gl6370sq.mts.Areabeingdevelopedby concordeRealty. Ref,RERA Registration NumberNew Sir, I R'C'Tipnishaveundertakenassignment of certifying Estimated Costfor thesubjectRealEstate project proposed to be registered underRERA, being10Building(s) situated plot on the bearingcTSNo.Survey no.t55/t/B,tssl4lVB, ts6lz, tsTltl}, tst12 , t62lt of villageKhidkali talukaThaneDistrictThaneplN 427204 admeasuring 16370sq.mts.Areabeingdeveloped byconcorde Realty. 1. Following technicalprofessionals are appointedby concordeRealty:- (i) Smt SuvarnaGhoshasArchitect; [/hlrv'^ 't' (ii) Mr. R.C.Tipnis asStructuralConsultant (iii) M/s ElectroMech Consultantsas MEpConsultant (iv) Mr. SagarChavanas SiteSupervisor STRUCTURAL CONSULTANT CHARTEREDENGINEER VATUER PROJECT MANAGEMENT CONSUTTANT R.C.TIPNIS B.E.(CtVtLl, M.t.E. 'SANJRAJ', G. V.SCHEME-2,MULUND(E),MUMBAI- 400 081. . TEL | 2163 4791. 2163 4399 . CELL: 98200 56799 . E-MAIL: rctipnis@gmoil.com 2. I haveestimatedthe costof the completionto obtainOccupationCertificate/ CompletionCertificate, of the project.Our estimatedcostcalculations of the Civil,MEPand Alliedworks,of the Building(s) are basedon the Drawings/ plansmadeavailableto us for the projectunderreferenceby the Developerand Consultant and the Scheduleof times and quantityfor the entirework as calculatedby Mr. SagarChavan- SiteSupervisorappointedby Developer/Engineer, andthe assumptionof the costof material,labourand other inputsmadeby developer,and the site inspectioncarriedout by us. of the aforesaidprojectunder 3. We estimateTotal EstimatedCostof completionof the building(s) The estimatedTotalCostof projectis with referenceto the Civil,MEP,and referenceas Rs.3,79,59,8481-. alliedworksrequiredto be completedfor the purposeof obtainingoccupationcertificate/ completion certificatefor the building(s) from the ThaneMunicipalCorporationbeingthe PlanningAuthorityunder whosejurisdictionthe aforesaidprojectis beingimplemented. 4. The EstimatedCostIncurredtill date is calculatedat Rs.1,20,35,9701-. Theamountof EstimatedCost Incurredis calculatedon the baseof amountof TotalEstimated Cost, 5. The Planningcostof Completionof the Civil,MEPandAlliedworksof the Building(s) of the subject projectto obtainOccupationCertificate/ CompletionCertificate from ThaneMunicipalCorporation (planningAuthority)is estimatedat Rs.2,59,23,8781-. 6. I certifythat the Costof the Civil,MFPand alliedwork for the aforesaidProjectas completedon the dateof this certificateis asgivenin TableA and B Below. It/,,tr,r,* 'l STRUCTURAL CONSULTANT CHARTEREDENGINEER VATUER PROJECT MANAGEMENT CONSULTANT R,C.TIPNIS B.E.(CtvtLl,M.l.E. 'SANJRA,', c' v. SCHEME-2, MULUND(E),MUMBAT - 4oo ogl. . TEL | 2163 4t91 . 2163 43gg . CELL: 98200 56799 . E-,r,{AlL : rctipnis@gmoil.com -A TABTE Buildingcalledas Omkara4 TotalEstimatedcostof the building(s)/wingas on 30/06/2017date of Registrationis Rs.3,05,51,681/- As on 30/06/2077Costincurred(basedon the Rs. 1,06,38,750/- Estimatedcost) Workdonein Percentage (asPercentage of the estimatedcost) BalanceCostto be lncurred (Basedon EstimatedCost) Rs.2,OO,l2,93tl- CostIncurredon Additional/ Extraltemsason 30/06/2017not includedin the EstimatedCost (AnnexureA) [\,{/rr,1'- STRUCTURALCONSUTTANT CHARTEREDENGINEER VALUER PROJECTMANAGEMENT CONSUTTANT R.C.TIPNIS B.E.(Ctvtrl, M.t.E. 'SANJRAJ', c. V SCHEME-2, MUTUND(E),MUMBAT_ 4OO08l. . TEI :2163 4791. 2163 4399 . CELL:9820056799. E-A4AIL: rcripnis@gmoil.com TABTE- B Sr.No. Particulars Amounts I TotalEstimatedcostofthe Internaland External DevelopmentWorksincludingamenitiesand Rs73,O8,t67l- Facilities in the layoutas on 30/6/2017dateof Registration is 2 Costincurredas on 30/06/2017(basedon the Estimatedcost) Rs.13,97,22O1- 3 Workdonein percentage 19.tlo/o (asPercentage of the estimatedcost) 4 BalanceCostto be Incurred (Basedon EstimatedCost) Rs,59,1O,947 l- 5 CostIncurred on Additional/Extraltemsason 30/6/20L7not included in the Estimated Cost (Annexure A) Rs.0/- Yours Faithfully r,,-} lVtlmv^ 1- t R.C.Tipnis Structural Engineer T.M.C.Regn.No. 1035 AnnexureA List of Extra/ AdditionalItemsexecuted with Cost NIL