p arin Raja Bahadur Mansion, 24-B Ambalal Doshi Marg, 4th Floor, Olfice no: 125A, s hah Opp. Stock Exchange, I arch itects Forl. ll, um ba i - 400023. t: (+91) 022 65378770 e; parr narch @yah oo lcom w: www.architeclparinshah-co.in FORM I [see Regulation 3] ARCHITECT'S CERTIFICATE (To be submitted at the time of Registration ofOngoing Project and for withdrawal ofMoney from Designated Account) Date:31-03-2018 To, Podda. Housing & Development Ltd. Unit No. 3-6 Neeru Silk Mill, Mathuradas Mill Compound, 126 N. M. Joshi Marg, Lower Parel (West), Mumbai - 400013 Maharashtra India. Subject : Certificate of percentage of construction completed for Development of "SAMRUDDHI EVERGREENS" for construction of Phase 4A (as per NA Approval no K- l/T- l4iNAP/SR-103/2011 dated 7rh May 2012) of the Project (MahaRERA Registration Number P51700009407) situated on the plot situate, lyingandbeingatS.No.4l2,5,'1,8& l0 (part) at Village - Sape, Tal, Ambemath, Dist- Thane admeasuring total plot area of 1,02,820 Sq. Mtr, out of which area of land to be developed as Phase 4.A of the Real Estate Project is 4190 Sqm area demarcated by its bounda es Towards East Badlapur-Karjat Road. Towards West - Clubhouse (Samruddhi Evergreens) , Towards North phase 48 (Samruddhi Evergreens), Towards South Phase 3 (Samruddhi Evergreens) (latitude and lonqitude of the end points of the proiect) , being developed by'tr4/s. Poddar Housing & Development Ltd. I "Pafln Shah Architect" have undeflaken assignment as Architect of certi5/ing percentage of completion ofwork ofthe above mentioned project. Following technical professionals are appointed by Promoter, l. "Parin Shah Architects" as Architect ofrhe project 2. "Semac Consultants P\,1. Limited" as Structural & MEp Consultant. Sir, Based on Site Inspection, with rcspect to each of the Building of the aforesaid Real Estate Project, I certify that as on 31't Mar 2018, the percentage of work done fot each of the Raja Bahadur Mansion, Dafln 24-B Ambalal Doshi I\raro. 4lh Floor. Office no: 1254, bhah Opp Stock Exchange, I arch itects Fort. Mumbai - 400023 1: I +91\ O22 55378770 e: paririarch@yahoo com w: wwwarchitectparinshah.co.in building of the Real Estate Project (MahaRERA Rcgistration Numbcr P51700009407) is as per Table A' herein below. The percentage of the work executed with respect to each of the activity ofthe entire phdse is detailed in the'Table B'. Table A Buildine Numb er: ll9 Perccntage ofwork Sr. No. TrsldActivitv done I Excavation 100% Plinth 100% 3 4 number ofSlabs of Super slrucure 100% Intemal Walls, Intemal Plaster. Flooring. Doors and 4 t00% Windows to each ol'thc Flat / Prcmiscs Sanitary Fittings within the Flat/Prcmises, Electrical t00vo Fittings \aithin the Flat/Premises Staircases, Lifts Wells and Lobbies at each Floor level 6 connecting Staircases and Lifts. Overhead and t00% UnderFound Watcr Tanks. Thg extemal plumbing and extemal plastcr, clcvation, 1 completion of terraces with waterproofing of the t00% B uilding,{Ir'ing Plinth Protectiol, paving of arcas appufienant to Building,^Ir'ing Compound Wall and all other requirenrent 8 100% as may be required to obtain Occupatio Completion certificate. Raja Bahadur Mansion, 0arin 24'B Ambalal Doshi Marq, 4lh Floor, Offce no: '125A, iihah Opp Stock Exchan I arch itecls Fort, Mumbai - 4000 23 t: (+91) 022 65378770 e: pa rina rch@yahoo. co m w: www.arch [ectperinshe h.co. in Buildins Number: 120 Percentage ofwork Sr. No. TasldActivity done I Excavation t00% 2 Plinth t00% 3 4 number of Slabs of Super structure 100% lntemal Walls, Intemal Plaster, Flooring, Doors and 100% 4 Windows lo each of the Flat r Premises Sanitary Fittings within the Flat/Premises, Electrical l0t)% Fittings within the Flat/Premises Staircases, Lifts Wells and Lobbies at each Floor level 6. connecting Staircases and Lifts, Overhead and 100% Underground Water Tanks The external plumbing and extemal plaster, elevation, 1 completion of terraces with watelproofing of the r00% BuildineAVine Plinth Protection, paviog of areas apputeflant to Building/Wing Compound Wall and all other requirement t00% 8. as may be required to obtain Occupation/Completion certificate. Buildin Number: 12 Percentage ofwork Sr. No. Taslii/Activi ty done I Excavation 100% 2 Plinth 100% 3 4 number of Slabs of Super strucfure L00% Intemal Walls, Intemal Plaster, Flooring, Doors and t0lvo 4 Windows to each oflhe FIat / Premises Sanilary Fittings within the Flatryremises, Elect cal t00% Fittings within the Flat/Premises Staircases, Lifts Wells and Lobbies a1 each Floor level 6 connecling Staircases and Lifts, Overhead and 100% Underground Water Tanls. The extemal plumbing ald extemal plaster, elevation, 7 completion of terraces with waterProofing of the 100% Building/Wing Plinth Protection, paving of arcas appurtenant to Building.AVing Compound Wall and all other requirement 100% 8. as may be required to obtain Occupation/Completion certificate. Raja Bahadur Ma Darin 24-B Ambalal Doshi Marg, 4th Floor, OflSce no. 1254., bhah Opp. Stock Exchange, I arch ilects Forl, ldumbai - 400023. r: (+91) 022 65378770 e: parina rch @ya hoo. com w: www.architeclparinshah.co.in Buildine Numberr 122 Percentage ofwork Sr. No, Task/Activity done I Excavation t00vo 2. Plinth t00vo I 4 number ofSlabs of Super structure tolyo Intemal Walls, Intemal Plaster, Flooring, Doors and I Windows to each ofthe flat / Premises 100% Sanitary Fittings within the Flat/Premises, Electrical t00vo Fittings within the Flatryremises Staircases, Lifts Wells and Lobbies at each Floor level 6. connecting Staircases and Lifts, Overhead and 100% Underground Water Tanks. The extemal plumbing and extemal plaster, elevation, 7 completion of teEaces with waterproofing of the 100% Build ing/Wing Plinth Protection, paving of areas appwtenant to Building,A ing Compound Wall aod all other requirement 8 100% as may be required to obtain Occupatioi/Completion certifrcate. Buildine Number: 123 PerceDtage ofwork Sr, No. Task/Activitv done 1 Excavation 100% Plinth 100% 3 4 number of Slabs of Super structure 100% Intemal Walls, Intemal Plaster, Flooring, Doors and 4 Windows to each of the Flat / Premises t00% Sanitary FittiDgs within the Flat/Premises, Electrical 5 t00% Fiftings within the FlaiPremises Staircases, Lifu Wells and Lobbies at each Floor level 6 connecting Staircases and Lifts, Overhead ard 100% Undeigrormd Water Tanl$. The extemal plumbing and extemal plaster, elevation, 7 completion of terraces with waterproofing of the 100% Building/Wing Plinth Protection, paving of areas appuftenant to Building/Wing Compound Wall and all other requirement 8 100% as may be required to obtain Occupatiorrcompletion certihcate, Ra )a Bahadur l ansion, 0arin 24- B Ambalal Doshi Marg, 4th Floor, Oflice no: 125A, Shah Opp. Stock Exchange, I a rch itecls Fo rl. Mumbar - 400023. tt l+91\ O22 65378770 e: parinarch@yah oo. com w: www.archilectparinshah.co,in BuildiDs Number: 124 PerceDtage ofwork Sr, No. TasliJAc tiYity done I Excavation to0% 2. Plinth t00% 1 4 number ofSlabs ofSuper structure t00% Intemal Walls, lntemal Plaster, Floo ng, Doors and 4 t00% Windous to each of $e Flat / Premises Sanirary Fittirys within the Flat/Premises, Electrical 100% Fittings within the Flat/Premises Staircases, Lifts Wells and Lobbies at each Floor level 6. connecting Staircases and Lifts, Overhead and 100% Underground Water Tanks. The extemal plqmbing and extemal plaster, elevation, 7 completion of terraces with waterproofing of the 100% Build ins/Wing Plinth Protection, paving of areas appurtenant to Building/Wing Compound Wall and all other requtement 8 100% as may be required to obtain Occupation/Completion certificate. Buildine Number: 125 Percentage ofwork Sr. No TasliJActivity done I Excavation 100% 2. PIinth t00yo 3 4 number of Slabs of Super structure 100% Intemal Walls, Intemal Plaster, Flooring, Doors and 100% 1. Windows to each o[the Flat / Premises Sanitary Fittings within the Flat/Premises, Electrical 5. t00vo Fittings within the Flat/Premises Staircases, Lifts Wells and Lobbies at each Floor level 6. connecti[g Staircases and Lifts, Overhead and t0lvo Underground Water Tanks. The extemal plumbing and extemal plaster, elevation, 7 complelion of termces with waterproofing of the to0% BuildingAVing Plinth Protectioq paving of areas appurtenant to Building/Wing Compound Wall and all other requirement 8 100% as may be required to obtain Occupatioi,/Completion certiircate. Raja Bahadur I\,iansion, Darin 24-B Ambalal Doshi Marg, 4th Floor, Office no: 125A, bhah Opp. Slock Exchange, I a rc h itects Fort, Mumbai - 4 00023 t: (+91) 022 6537a770 e: pa rinarch @yahoo. com w: www.architectparinshah.co-in Buildins Number: 126 Percentage of rvork Sr, No. Task/Activitv done I Excavation t00% 7 Plinth 100% 4 number ofSlabs of Super structure 100% Intemal Walls, Intemal Plaster, Flooring, Doors and 4 t00% Windows to each oflhe Flat / Premises Sanitary Fittings within the FlayPremises, Electrical 5 t00% Fittings within the FlaL/Premises Staircases, Lifts Wells and Lobbies at each Floor level 6 connecting Staircases and Lifts, Overhead and t00% Underground Water Taaks. The extemal plumbing and extemal plaster, elevation, 7 completion of terraces with waterproofing of the 100% Building/Wing Plinth Protection, paving o[ aleas appultenant to Building/Wing Compound Wall and all other requirement 8 t00% as may be required to obtain Occupatio../Completion cedifrcate. Buildins Number: 127 Percentage ofwork Sr. No. Task/Activify done I Excavation 100% 2 Plinth 100% 3 4 number of Slabs of Super sfucture 100% Internal Walls, lntemal Plaster, Flooring, Doors and 4 100% Windous to each ofrhe Flat / Premises Sanitary Fiftings within the Flat/Premises, Electrical 5 100% Fittings within the FlarPremises Staircases, Lifts Wells and Lobbies at each Floor level 6. connecting Staircases and Lifts, Overhead and 100% Underground Water TaDl$. The extemal plumbing and extemal plaster, elevation, 7 completion of terraces with waterprooling of the t00% Buildins/Wine Plinth Protection, paving of arcas appurtenant to Building/Wing Compound Wall and all other requirement 8. 100% as may be required to obtain Occupatior/Completion certificate. Raja Bahadur I\ransion, Dann 24-B Ambalal Doshi Marg, 4lh Floor, Office no: 125A. bhah Opp Slock Exchange, I Fort. Mumbai - 400023 r: (+91) 022 6537477O e: parin arch@ya hoo. com architecls w: www.archilectparinshah co.in Building Number: 128 Percentage ofwork Sr. No. Taslii,/Activity done 1 Excavation t00vo Plinth t00% 3 4 number of Slabs of Super shucture t00% Intemal Walls, Intemal Plaster, Floo ng, Doors and 4 t00% Windows to each of the Flat / Prcmises Saritary Fiftings within the Flat/Premises, Electical 5 100% Fittings within the Flatryremises Staircases- Lifts Wells and Lobbies at each Floor level 6 connecting Staircases and Lifts, Overhead and 100% Underground ri/ater Tanks. 'lhe extemal plumbing and extemal plaster, elevation, 7 completion of terraces with waterproofing of the t0lyo BuildingA ing Plinth Protection, paving of areas appurtenant to Building/Wing Compound Wall and all other requirement 8 100% as may be required to obtain Occupation/Completion cedficate. Ra ia Bahadur 0arin 2l -'B nmoatat o oshi Marg, 4th Floor, Offce noi '125A. bhah Opp. Stock E I architects Fort, Mumbai - 4 000 23 t: (+91) 022 65378770 ge e: pa n narch@yah oo. com w: www architectpa nshah,co.in TABLE - B Internal & Erternal DeveloDment work in respect of the entire Resistered Phase/Proiect S. No Common areas aod Proposed Percentage of Details Facilities, Amenities (YesNo) Work done t Intemal Roads and Yes 100% Footpaths 2 Water Supply Yes t 00% Sewerage 3 (chamber, lines, septic Yes 100% Tank, STP) 4 Storm Water Drains Yes 100% Lardscaping and Tree 5 Yes 100% Planting 6 Sheet Lighting Yes t00% 7 Community Buildings Yes t00vo Treatment and disposal 8 of sewage and sullage Yes 100% water 9 Solid Waste No lvo management & Disposal 10 Water conservation, Yes 100% Rain Water Rain water harvesting Harvestirlg 1l Energy Management No 0% NA Fire Fire protection and fire 12 NA ovo Extinguisher for safety requiremeDts G+3 Buildins Elect cal meter room, I3 sub-station, receiving Yes 100% station OtheN (option to add 14 more) Yours faithfully, Parin Shah Architects 2.1 .r, ai j-r: j'r1:lr I ii-Jl License No - CA,/99l24471 ' _atl il'l