D. M. Dalvi &Associates Architects Engineers Surveyors & Govt.Valuers 'D' Block, First Floor, Zojwala Shopplng Centre, Sahajanand Chowk, Agra Road, Kalyan (W) 421 301. Tel: (0251) 2321871, 2321172 Fax : (0251) 2323278 e-mail : dm_dalvi@yahoo.co.in ARCHITECT'S CERTIFICATE Date:30.03.2024 To, Stalwart Impex Pvt. Ltd., Jayant Krupa, Plot No. F-66, Gr. Floor, Behind Mother Teresa School, Sector -9, Airoli, Navi Mumbai-400708 Usha Construction Co. C-21, Mahavir Jyot Bldg., V.B.Lane, Ghatkoper( East), Mumbai-77. Subject: Certificate of Percentage of completion of construction of 5 Nos. of Buildings of the project USHA KIRAN WING E1,E2,E3 situated on plot area admeasuring 39911.83 sq.meters including, all those pieces and parcels of land lying, being and situate at village Kharvai (Kulgoan Badlapur), Taluka Ambernath, within the limits of the Kulgaon Badlapur Municipal Council bearing S. No. Hissa No. Area (Sq. mtrs) 3 2,3,4,5,7(P),8,9,10 39911.83 demarcated by its boundaries Corner No Latitude Longitude Description North 19°08'48.26"N 73°14'45.10" E S.no.2 South 19°0842.95" N 73°14'45.78" E JoveliVillage East 19°08'45.08" N 73°14'49.33" E S.no.2, aquarium & science centre reservation West 19°08'46.45" N 73°14'40.64"E S.no.7 Sir, I, Dilip M. Dalvi , (D Block, First floor, Zojwala Chowk, Agra Road, Kalyan (w)) have undertakenShopping Centre, Sahajanand assignment certifying Percentage of Completion of Construction Work of 5 Nos. ofas Architect of of the project USHA KIRAN WING E1,E2,E3 Buildings situated on plot area admeasuring 39911.83 sq.meters including, all those pieces and parcels of land lying, and situated at village Kharvai (Kulgoan Badlapur), Taluka being Ambernath, limits of the Kulgaon Badlapur Municipal Council bearing S. No. 3, within the H.no. 2,3,4,5,7(P),8,9,10. Following technical professionals are appointed by Usha Construction Co: () Shri. Dilip M Dalvi as Architect (ii) Shri. Arvind Patel as Structural Consultant (ii) MEP Consultant not Appointed (iv) Shri. Suresh Patel as Project Supervisor Based on Site Inspection, with respect to each of the Building type of the aforesaid Real Estate Project, Icertify that as on date of this certificate, the percentage of the work done for each buildingtype of the Real Estate Project as registered vide number No. KBMC/NRV/BP/1837-276/2014-15 dated 09.03.2015 of Kulgaon Badlapur Municipal Council is as per table A herein below. The percentage of the work executed with respect to each of the activity of the entire phase is detailed in Table B. Table A Building No./ Name- Usha Kiran -Type -E1,E2,E3 Sr. No. Task/Activity Percentage of work done 1, Excavation 100% 2. Xnumber of Basement (s) & Plinth 100% 3. number of Podiums NA 4. Ground Floor 5. Xnumber of Slabs of Super structure for 100% Building 100% 6 Internal Walls, Internal Plaster, Flats/Premises, Doors and WindowsFlooring within to each of the 100% Flat/Premises 7. Sanitary Fitting within the Flat/Premises, Electrical Fitting within the Flat/Premises 100% 8. Staircase, Lifts Wells and Lobbies at each Floor level connecting staircases and Lifts, overhead and underground water tanks. 100% 9. The External Plumbing and external plaster, elevation, completion of terraces with water 100% proofing of the Building/Wing, Table A TABLE -B Internal & External Development work in respect of the entire Registered Phase Building No./ Name - Usha Kiran Sr. Common areas and Facilities, Proposed Percentage No. Amenities of Work Details (Yes/No) done 1 Internal Roads and Footpaths Yes 80% E1,E2,E3 2 Water Supply Yes 100% Sewerage 3 (chamber, lines, septic Tank, Yes 100% STP) 4 Storm VWater Drains Yes 100% 5. Landscaping and Tree Planting Yes 70% 6. Street Lighting Yes 70% 7. Community Buildings Yes 40% Treatment and disposal of No NA NA 8. sewage and sullage water Solid Waste management & No NA NA 9. Disposal Water conservation, Rain 100% 10. Yes water harvesting No NA NA 11. Energy Management E1,E2,E3 Fire protection and fire safety Yes 100% 12. requirements Electrical meter room, sub Yes 70% 13. station, receiving station Yours faithfully, For D.M.Dalvi&Associates, "D. M. Dalvi CA/76/2398