CPEATION6 Architects & lnterior Designers tr FORM 1(See Reeulation No. 3) Date:- 2011212019. To. M/S Honest Infia. Ground Floor. Samruddhi Heights, Chikanghar. Rambaug Lane No. 4 End, Kalyan (W) - Pin - 42 I 301 . Sub:- Certificate of percentage of completion of construction work of Building- Diwadkar Lotus (Residential wing) of the project (Maha RERA Registration Number P51700009060) situated on the plot bearing c.T.S. No. 2878 A demarcated by its boundaries at North - c. T. s' No. 2872. 2883B, at South - c. T. S. No. 28828" 28788 at East - C. T. S. No. 2883 A/1, at West - 24.00 M. wide D. P. Road, village:- Kalyan. Taluka:- Kalyan, District:- Thane. Pin- 421301 being developed by M/S HoNEST INFRA. The Building- Diwadkar Lotus (Residential wing) is being developed on part of land (1240.50 Sq. M. as per agreement) out of total land admeasuring 3031.00 Sq. M. inclusive 454.65 Sq. M. Recreation Ground area' Sir. l. Shobhana Deshpande. Proprietor, cREATIONS. have undeftaken assignment as an Architect of certifying ol percentage of completion of construction work of Building- Diwadkar Lotus (Residential Wing) of the project (Maha RERA Registration Number !!!l!QQ!!!fQ) situated on the plot bearing c.T.S. No. 2878 A demarcaled by its boundaries at North - c. T. s. No. 2872, 28838. at South - c. T. S. No. 28828.28788 at East - C. T. S. No. 2883 Al1, at west - 24.00 M. wide D. P. Road, village:- Kalyan. Taluka:- Kalyan. District:- Thane. Pin- 42 130 1 being developed by M/S HONEST INFRA. The Building- Diwadkar Lotus (Residential wing) is being developed on part of land (1240.50 Sq. M. as per agreement) out of total land admeasuring 3031 .00 Sq. M. inclusive 454.65 Sq. M. Recreation Ground area' l. Following technical professionals are appointed by Owner/ Promoter:- i. Architect Shobhana Deshpande, Creations as Architect' ii. Shri. Arun Khasnis as Structural Consultant iii. Shri Jatin Patel as Sile Supervisor iv. Integrated Consultant as MEP consultant. Project, Based on Site lnspection, with respect to each olthe Building ofthe aforesaid Real Estate I certify that as on 2011212019, the Percentage of work done fo r each of the Wing of the Real Estate Project as registered vide number-!!flQQ!!!!fQ under Maha RERA is as per table A herein below. The percentage ofthe work executed with respect to each ol the activ ity of the entire phase is detailed in Table B. A-104-105,Ever oshi i/ata Road. Kalya n (W) 42'130 lefax | 0251-2313140 E-mail : d esig ntea m @creations. o rg. in CPIATION6 Architects & lnterior Designers tr Table - A Residential Wing Sr. No. Tasks/ Activity Percentage of work done I Excavation 100% 2. Number of Basement(s) and Plinth 100% Basement not proposed J 3 Number of podiums 100% 4. Stilt Floor' r00% 100% ). 22 number of slabs of super structure (22"d slab complete) 6 lnternal walls. lnternal Plaster, Flooring within Flatsi Premises r00% Doors and Windows to each of the Flat/Premises 7 Sanitary Fittings within the Flat/Premises r00% Electrical Fittings within the Flat/Premises 8 Staircase. Lifts Wells and Lobbies at each t00% Floor level connecting Staircase and Lifts. Overhead and Underground Water Tanks 9 The external plumbing and external plaster, t00% elevation. completion of terraces with waterproofing of the Building/Wing 10. Installation of lilis, water pumps. Fire Fittings and Equipment as per CFO NOC. Electrical fittings to Common Areas, electro. mechanical equipment, 98% Compliance to conditions of environment/CRZ NOC. Finishing to entrance lobby/s. plinth protection. paving of areas appuftenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation/Completion Certificate. o 7 A- 1 04-105, Ev Sa os hi Mata Road, Kalyan (W) 4 a ax 0251-2313140 E-mail d esigntea m @creations.org. in : CPTATIONE Architects & lnterior Designers tr Table - B Internal & External Development Works in Respect ofthe entire Registered Phase Sr. No. Common areas and Facilities. Proposed Percentage of Details Amenities (Yes/ No) work done t. Internal Roads & Footpaths No t00% Water Supply Ycs ln Progress 2 Sewerage (Chamber. lines, -1 Septic Tank. STP) Yes r00% 1 Storm Water Drains Yes I 100% 5. Landscaping & Tree Planting Yes 100% 6 Street Lighting No 100% Community Buildings No 7 I 8 f r[itment and disposal ol I sewage and sullage water I I No Solid Waste management & No 9 Disposal Water conservation Rain water 10. harvesting Yes roo% I Solar water heaters ll. Energy management Yes In Progress proposed Fire protection and fire safety Yes IZ 100% requirements Electrical meter room. Yes l3 t00% sub-station, receiving station AR.SHOBHANA DE SH (Reg. No. CA/ 87/ I For CRE TIoN Kalyan A-104-'!05,Everest Tower, Santoshi Mata Road, Kalyan (W) 421301. Telelax I 0251-2313140 E-mail : d esig ntea m @creation s. org - in