Arnla I{. Singh Yiuh Paradise -704, A wiog , Civil Engineer Sector -8. Airoli Navi Mumbai FORM-2lsee regulation 3l ENGINEER'S CERTIFICATE Datc )7-01-2017 To, Poddar Housing & Development Ltd. Unit No. 3-6 Neeru Silk Mill. Mathuradas Mill Compound, 126 N. M. Joshi Marg, Lower Parel (West), Mumbai - 400011 Maharashtra India. Subicct: Certificate ofCost incured for Development of 'SAMRUDDHI EVERGRXENS' for construction of Phase 4B (as per NA Approval no K-I/T-14/NAP/SR-103/2011 dared 7d May 2012) ofthe Projcct (MahaRERA Registration Number applied for) situated on the plot situate. Iying and being at S. No. 4/2, 5, 7, 8 & 10 (part) at Villagc Sape, lal- Ambemath, Dist- Thane admeasudng total plot area of 1,02,820 Sq. Mtr. out of which area ofland to be developed as Phase 48 of the Real Ijstate Project is 3710 Sqm arca dcmarcated by its boundaries Towards East - Badlapur-Karjat Road, Towards West Cllubhousc (Samruddhi Evergreens) , Towards North - Phase 4C (Sarlruddhi Evergreens), 'lowards South Phase,tA (Samruddhi Evergreens) (latitude and longitude ofthe end pqill! ell 1h9 gqigqQ . being developed by'M/s. Poddar I Iousing & Developmeot Ltd. Sir. I Mr. Amla R. Singh have undertaken assignment of ccrtifying Estimated Cosl for the above mentioned building/ project Following technical professionals are appointed by Owner/Promoter:- l. "Parin Shah fuchitects" as Architect of the project 2. "Semac Consultants Pvt. Limited" as Structural & MEP Consultant. Nt 2 We have estimated lhe cost of the completion to obtain Occupation Certilicate/Completion Cerlilicate, of the Civil. MEP and Allied \aorks, of the Building(s) of the proiect. Our estimated cost calculation are based on the Drau,ing/plans made available 1() us lbr the project Lmder rel'erence by the Developer and Consultants and the Schedule of items and quanlity lbr the entire work as calculated by me, and the assumption ol the cost material, labour and olher inputs made b,v developer, and the site inspection carried oul by us. We estimate total estimated Cost of completion of the building of the aforesaid project under rel'erence as Rs.t532 Lacs'1he estimated l'otal Cost ofprolect is with rel'erence to the Civil, MEP and allied works rcquired to be completed ior the purpose of obtaining occupation certillcate/completion certilicate lbr thc building(s) from the SRA authority being the Plarming Authority under whosc iurisdiction the aforesaid project is being implemented. ,+ The Estimated Cost Incuned till date ofthe building is calculated at Rs.876 Lacs. Ihe amount of Estimated Cost incuned is calculated on the basis of amount of Total Estimated Cost. 5 The Balance cost of Completion of the Civil, MEP and Allied works of the building(s) of the subject project to obtain Occupation Certificate/Completion Certificate liom SRA, planning Authority is estimated at Rs.5l6L@!. 6 I certify that the cost of Civil, MEP and allied work for the aforesaid Project as completed on the date ofthis certificate is given in Table A and B below: I ,{}ILE A Buildine no I 29.130.131.132.1 33.1-1.1.135.136.1f 7.1-18.1 -19 Sr. No Particulirrs Amounls in Lacs I Total Estimated cost ofthe buildings 1222.00 as on 30t Jun 2017 2 Cost incurred as on 30rh Jun 2017 690.00 (based on the Estimated cost) Work done in Percentagc 56 vo (as prcentage ofthe estimated cost) .t Balance cost to be Incufted 532.00 (based on estimated cost) Cost incurred on Additional /Extra Item as on 30rh 0.00 Jun 2017 not included in the Estimated Cost (Aruexure A) Tahlc B l'hase ,lB - Sr. No. Particulars Amounts in Lacs. I Total Estimatcd cost ofthe Intemal 310.00 and Extemal Derelopment Worls including arnenitics arnd Facilities in the l,ayout as on 30rh Jun 2017 Cost incurred as on 30'n Jun 2017 t86.00 (based on the Estimated cost) Work donc in l)crcenlage 60% (as perccntage ofthe estimated cost) ,t Balance cost to be lncurred t21.00 (Based on Estimated Cost) 5 Cost incurred on Additional /Bxtra ltcm as on 30rh 0.00 .lun 2017 not included in the llstimated Cost (Annexurc A) Yorrrs Faithfullv- ( Mr. Amla R. Singh Civil Engineer *Note l The scope ofwork is to complete entire Real Estate Project as per drawings approved from time to time so as to obtain Occupation Certificate/Completion Certificate. (*) Quantity survey can be done by oftice of Engineer or can be done by an independent Quantity Surveyor, whose certificate of Quantity calculated can be relied upon by the Engineer. In case of independent quantity suveyor being appointed by Developer, the name has to be mentioned at the place marked(*) and in case quantity are being calculated by office of Engineer, the name of the person in the office of engineer, who is responsible for the quantity calculated should be mentioned at the place marked (*). The estimated cost includes all labour. material, equipment and machinery required to carry out entire u'ork. 4 As this is an estimated cost. any deviation in quantity required for development ofthe Rcal Bstate Project will result in amendment ofthe cost incured/to be incurred- 5. All components ofwork with specifications are indicative and nol exhaustive. (