ABRAR KHAN ARCHITECTS Form -1 (See Regulation - 3) ARCHITECT'S CERTIIFCATE (To be submitted at the time of Registration of Ongoing Project and for withdrawal of Money from Designated Account) Date: 15/04/2022. To, M/s. V.R.Realties, 123, Shiv Center, Above Everest Cycle, Sec-17, Vashi. Navi Mumbai. Sub: Certificate or Percentage of completion of Construction Work of One No. of Building(s) /One Wing (s) of the One Phase of the Project (MahaRERA P51700008676) situated on the Plot bearing C.T.S No. 808,808/1 to 808/4 demarcated by its boundaries (latitude and longitude of the end point) Gully to the North Gully to the South Gully to the East Gully to the West of Division Panvel Village Panvel Taluka Panvel District: Raigad Pin 410206 admeasuring 202.30 sq. mtrs. area being developed by V.R.Realties. Dear Sir, IABRAR.S.KHAN have undertaken assignment of Architect of certifying Percentage of Completion of Construction Work of the Ongoing Building (s) One Wing (s) of the Phase of the Project, situated on the plot bearing C.T.S No. 808,808/1 to 808/4 of Division 808, Village PANVEL, Taluka Panvel, District:Raigad, PIN:410206 admeasuring 202.30 sq.mtrs. area being developed by V.R.Realties. 1. Following technical professionals are appointed by Owner/ Promoter: i. M/s., Shri/ Smt: ABRAR.S.KHAN as Architect; ii. M/S., Shri/ Smt. STRUCTURAL CONCEPT as Structural Consultant; ii. M/s., Shri/ Smt. as MEP Consultant; 1V. M/s., Shri/ Smt. as Site Supervisor; abrarkhanarchitects.com ar.abrarkhan@gmail.com 6 022-27467005 I 9370070070 /9870070042 9 Shop no 11&12,Ground floor, Tirthraj chs,old Thana naka road, fp no 20,Panvel, Raigad. 410206 Based on the site inspection, with respect to each of the Building/ Wing of the aforesaid Real Estate Project, I / We certify that as on the date of this certificate, the Percentage of Work done for each of the Building / Wing of the Real Estate Project as registered vide Regn. Number P51700008676 under MahaRERA is as per Table - A herein below. The Percentage of the work executed with respect to each of the activity of the entire phase is detailed in Table - B. Table - A. Building /Wing Number (tobe prepared separately for each Building / Wing of the Project) Sr. Task /Activity Percentage of No. Work Done Excavation 100% 2. No Number of Basement (s) and Plinth NA 3. No Number of Podiums NA 4 Stilt Floor 100% 5 Number of Slabs of Super Structure 100% 6. Internal walls, Internal Plaster, Floorings within Flats/ Premises, Doors and Windows 100% to each of the Flat/ Premises 7. Sanitary Fittings within the Flat Premises, Electrical Fittings within the 100% Flat/ Premises 8. Staircases, Lifts Wells and Lobbies at each Floor Level connecting Staircases and Lifts, 100% Overhead and Underground Water Tanks 9.The External plumbing and external plaster, elevation, completion of terraces 100% with waterproofing of the Building /Wing. 10. Installation of lifts, Water Pumps, Fire Fighting Fittings, and Equipment as per 100% DFO NOC, Electrical fittings to Common Areas, elector, mechanical equipment, 12. Fire Protection and fire safety requirements 13. Electrical Meter room, NA sub-station, receiving station 14. Others (Option to Add NA more) Yours' faithfully, Signature of the Architect . : ABRAR.S.KHAN Licence No. CA/05/36229 Agreed & Accepted by For VR Partner Signatureof Promoter Name: Kah Potl Date: