ARCHITECTS, REGD VALUER & INT.DESIGNERS I02 Konark Towers, 0pp. Saibaba Temple, Ghantali Road Thane(W)-400602. 12 June 2017 FORM 1 To Shri. Mukesh Alias Vicky Prakash Kukreja Partner, lWs Kapleshwara Builders & Developers, Shop No.2, Hari Om Apartment, Opp.HDFC Bank, Uihasrragar; 421C03 Subject: Certificate of Percentage of Completion of Construction Work of ONE Building of the Project 'Pinnacle Gloria' [Maha RERA Registr-4lion Number] situated on the Plot bearing Survey no. 33 H.NO.3B demarcated by its bowrdaries (latitude and longitude ofthe end points) lg"l4'I5.27" to the North 72"59'37.86" to the East of village Kolshet taluka and District Thane (w) PIN 400607; admeasuring 2070.00 sq.mtrs. plot area being developed by Shri Mukesh alias Vicky P. Kukreja Partner, IWs Kapleshwara Builders & Developers. Sir, I, Shri. Shashikant V. Deshmukh of lWs Shashi Deshmukh & Associates have undertaken assignment as Architect of certifing Percentage of Completion of Construction Work of the Building ofthe Project 'Pinnacle Gloria' , situated on the plot bearing Survey no. 33 H.No.3B village Kolshet taluka and District Thane(w) PIN 400 607; admeasuring 2070.00 sq.mtrs. plot area being developed by Shri Mukesh alias Vicky P. Kukreja, Partner, VI/s Kapleshwara Builders & Developers. 1. Following technical professionals are appointed by Owner / Promoter :- (D IWs Shashi Deshmukh & Associates as Architect ; (iD lzl/s Associated consultants as Structural Consultant (iii) IWs Enviro-Con as MEP Consultant (iv) Shri Suraj Patil as Site Supervisor Ph 25334420, 253331 91,25369467,25349832 Fax.:25332025 shashikantvdeshmukh@yahoo.co.uk shashikantvdeshmukh@rediffmai l. com website: www.shashideshmukhassociates. com ARCHITECTS, REGD.VALUER & INT DESIGNERS 1 02, Konark Towers, 0pp. Saibaba Temple, Ghantali Road, Thane(W)-400602. Based on Site Inspection, with respect to the Building of the aforesaid Real Estate Project, I certiff that as on the date of this certificate, the Percentage of Work done for the building of the Real Estate project is as per table A herein below. The percentage of the work executed with respect to each of the activity of the entire phase is detailed in Table B. Table A FOR BLDG. NO.I As per amended approval dated 01.04.2017 Sr.No. Tasks/Activity Percentage of Work Done I Excavation ; 90% 2 One number of Basement & Plinth 85% J Number of Podium N.A. 4 stilt Floor 90% 5 15 number of Slabs of Super Structure as per 80% approved plan dtd. 01.04.2017 6 Internal Walls, Intemal Plaster, Floorings within 5% Flats/Premises, Doors and Windows to each of the Flat / Premises 7 Sanitary Fittings within the Flat/Premises, 0% Electrical Fittings within the Flat/Premises 8 Staircases, Lifts Wells and Lobbies at each Floor 25% level connecting Staircases and Lifts, Overhead and Underground Water Tanks 9 The extemal plumbing and external plaster, 0% elevation, completion of terraces with waterproofing of the BuildingiWing, 10 Installation of lifts, water pumps, Fire Fighting 0% Fittings and Equipment as per CFO NOC' Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment ICRZ NOC, 1l Finishing to entrance lobby/s plinth protection, 0% paving areas appurtenant to Building /Wing, compound wall, and all other requirements as may be required to obtain Occupation I Completion Certificate P h. 2533 4 420, 25 3 3 3 1 I 1, 2 5 3 6 9 46 7,253 49832. F ax ".25332025 shashikantvdeshmukh@yahoo.co. uk shash ikantvdeshmukh@red iff mai l. com website: www.shashi deshmukhassociates. com ARCHITECTS, REGD.VALUER & INT DESIGNERS 102, Konark Towers, 0pp. Saibaba Temple, Ghantali Road, Thane(W)-400602. TABLE.B Internal & External Development Works in Respect of the entire Registered Phase Sr. Common areas and Proposed Percentage ol No Facilities, Amenities fYes/llo) Work Done Details I Internal Roads & footpaths No N.A. Work not ye 2. Water Snnolv Yes 0% ;ommenced Septic tank is proposed. Sewerage, (Chamber, lines k its work not ye 3. Seotic Tank. STP) Yes 0% ;ommenced Work not Ye 4. Storm Water Drains Yes 0% ;ommenced Landscaping & Tree Work not ye 5. Plantins Yes 0% :ommenced 6. Street Liehtine No N.A. 7. Communitv Buildines No N.A. Treatment and disposal of 8. sewage and sullage water No N.A. lainwater harvesting Water conservation. Rain rroposed but its work 9 Water Harvestine Yes 0% rot yet commenced 10 Energv manaqement No N.A. Fire Protection & Fire Work not ye 11 Safetv Requirement Yes 0% :ommenced Electrical meter Room, sub- )nly electrical meter t2 station, receiving station Yes 0% 'oom is proposed Yours Faithfully FoT SHASHI DESIIMUKH SHlrr- ^{SSOCIATE S, zDE ""* \ ONNNtty- AR. S.V. REG. NO.CA/761326s Ph. 25334420, 253331 91 ,25369467 ,25349832. Fax..25332025 shashikantvdeshmukh@yahoo.co. uk shashikantvdeshmukh@rediffmail.com website: www.shashideshmukhassociates.com