10FOl 5 /\RCHITECTS & COi'JBULTAI'HB Date: 20/08/2018 To, The Rajesh Estates & Nirman Pvt. Ltd. 139, Seksaria Chambers, N.M. Road, Fort, Mumbai- 400 023. Sub.: Certificate of Percentage of Completion of Construction Work 5 wings (A,B,C,D & E) + Club House ofthe II-Phase of the Project [MahaRERA Registration Number P51700008352] situated on the Plot bearing Gut No. 48/1/3, 50/2/2, 49/1B, 49/2 demarcated by its boundaries Lawkin Company to the North 20.00 mtr. wide D.P. Road to the South 60.00 mtr. wide Ghodbundar Road to the East Ekdant Developer/Rajshree Industrial Estate to the West of Division Kokan village Chitalsar Manpada taluka Thane District Thane PIN 400607 admeasuring 49,287.35sq.mts. area being developed by Mis. Rajesh Estates & Nirman Pvt. Ltd. EAST SIDE - LATITUDE -19°13'42.85"N; LONGITUDE n058'35.90"E. WEST SIDE - LATITUDE - 19°13'43.30"N; LONGITUDE·· n058'29.59"E. NORTH SIDE - LATITUDE -19°13'44.78"N; LONGITUDE n058'32.07"E. SOUTH SIDE - LATITUDE - 19°13'41.49"N; LONGITUDE-no58'32.83"E. Sir, We 10 Folds Architects & Consultants have undertaken assignment as Architect uf certifying Percentage of Completion of Construction Work of the (5) Wings- A,B,C,D,E + Club House of the I I - Phase uf the Project, situated on the plot bearing Gut No. 48/1/3, 50/2/2, 49/lB, 49/2 of Division Kokan village Chitalsar Manpada taluka Thane District Thane PIN 400607 admeasuring built up arealO,497.94sq.mts. area being developed by Mis. Rajesh Estates & Nirman Pvt. Ltd. Following mentioned Consultants have been replaced with the earlier are as informed by Developer/Promoter. 1. Following technical professionals are appointed by Owner! Promoter:­ (i) 10 Folds Architects & Consultants as Architect; (ii) Shri Hiten M. Ahimtura as Structural Consultant (iii) Shrilfirju Patel as MEP Consultant (iv) Shri. Ansari I. Ahmad as Site Supervisor Based on Site Inspection, with respect to each of the Building/Wing of the aforesaid Real Estate Project, I certify that as on the date of this certificate, the Percentage of Work done for each of the building/Wing of the Real Estate Project as registered vide number P51700008352 under MallnaRIERA is as per table A herein below. The percentage of the work executed with respect to each of the activity of the entire phase is detailed in Table B. 10 FOLDS AFxCHITECTS & CONSUL:TANTS Table A Wing A (to be prepared separately for each Wing of the Project) Sr. Tasks /Activity Percentage No of work done 1 Excavation 100% -_. ..__._---_..... .. _ _ __.._-_.__.__._--_.­1----------­ 2 J.number ofBasement(s) and Plinth 100% 3 i4 number of Podiums 33% 4 Stilt Floor 4% 5 30 number of Slabs of Super Structure 0% 6 Internal walls, Internal Plaster, Floorings within Flats/ 0% Premises, Doors and Windows to each of the FlatIPremises 7 Sanitary Fittings within the Flat/Premises, Electrical Fittings 0% within the FlatIPremises 8 Staircases, Lifts Wells and Lobbies at each Floor level 0% connecting Staircases and Lifts, Overhead and Underground Water Tanks 9 The external plumbing and external plaster, elevation, 0% completion of terraces with water proofing of the Building/Wing, 10 Installation of lifts, water pumps, Fire Fighting Fittings and 0% Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment/CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate 10 FOLDS ARCHITECTS & C[JNSIJI_TANTS Table A WingH (to be prepared separately for each Wing of the Project) -- Sr. Tasks /Activity Percentage No ofwork done .. --_.__. 1 Excavation 100% ._--- -- ----- 2 Lllumber of Basemenus) and Plinth 100% 3 kJ. number of Podiums 32% 4 Stilt Floor - 4% 5 30 number of Slabs of Super Structure 0% 6 Internal walls, Internal Plaster, Floorings within Flats/Premises, 0% Doors and Windows to each of the Flat/Premises -~.,~"~-,.--~." 7 Sanitary Fittings within the Flat/Premises, Electrical Fittings 0% within the Flat/Premises 1-----­ 8 Staircases, Lifts Wells and Lobbies at each Floor level 0% connecting Staircases and Lifts, Overhead and Underground Water Tanks . 9 The external plumbing and external plaster, elevation, 0% completion of terraces with water proofing of the Building/Wing, 10 Installation of lifts, water pumps, Fire Fighting Fittings and 0% Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment/CRZ NOC, Finishing to entrance lobby/s, plinth protection, pavmg of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate. lOFOl S ARCHITECTE; & CONSULTANTS Tablc A Winge (to be prepared separately for each Wing of the Project) Sr. Tasks /Activity Percentage No of work done 1 Excavation 100% -­ 2 Inumber of Basement(s) and Plinth 100% ------ 3 3 number of Podiums 38% 4 Stilt Floor 6% 5 30 number of Slabs of Super Structure 0% 6 Internal walls, Internal Plaster, Floorings within Flats/ 0% Premises, Doors and Windows to each of the FlatIPremises 7 Sanitary Fittings within the FlatIPremises, Electrical Fittings 0% within the Flat/Premises 8 Staircases, Lifts Wells and Lobbies at each Floor level 0% connecting Staircases and Lifts, Overhead and Underground Water Tanks 9 The external plumbing and external plaster, elevation, 0% completion of terraces with water proofing of the Building/ Wing, 10 Installation of lifts, water pumps, Fire Fighting Fittings and 0% Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment/CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate. lOFOl AFxCHITEGTEi & COI'-lSULTANTS Table A WingD (to be prepared separately for each Wing of the Project) Sr. Tusks /Activity Percentage No of work done ------- - 1 Excavation 100% 2 Lnumber ofBasement(s) and Plinth 100% _. 3 4 number of Podiums 36% -­ ~~·.="m_, 4 Stilt Floor --_ ......•.. ,.. ,,-~, 36% 5 29 number of Slabs of Super Structure 3% 6 Internal walls, Internal Plaster, Floorings within Flats/Premises, 0% Doors and Windows to each of the Flat/Premises 7 Sanitary Fittings within the Flat/Premises, Electrical Fittings 0% within the FlatIPremises. 8 Staircases, Lifts Wells and Lobbies at each Floor level connecting 0% Staircases and Lifts, Overhead and Underground Water Tanks 9 The external plumbing and external plaster, elevation, completion 0% of terraces with water proofing of the Building/Wing, 10 Installation of lifts, water pumps, Fire Fighting Fittings and 0% Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment / CRZ NOC, Finishing to entrance 10bby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate 10 FOLD AI~[JHITECTS & CONSULTANTS Table A Wing E + Club House (to be prepared separately for each Wing of the Project) Sr.No Tasl-~,","~-- TMC 3. Sewarage (chamber, lines, Yes 0% As per design of Septic Tank ,STl) consultants 4. Storm Water Drains Yes 0% As per design of consultants 5. Land scaping & Tree Yes 0% As per design of I Planting consultants 6. Street Lighting Yes 0% - -­ 7. Community Buildings No 0% - 8. Treatment and disposal of Yes 0% As per design & dwg sewage and sullage water of consultants 9. Solid Waste management & Yes 0% As per design & dwg Disposal of consultants 10. Water conservation, Rain Yes 0% As per design & dwg water harvesting of consultants 11. Energy management Yes 0% As per design & dwg I of consultants .-._._- 12. Fire protection and fire safety Yes 0% As per Fire NOC requirements 13. Electrical meter room, sub- Yes 0% Electric Meter -Yes station, receiving station 14. Others( Option to Add more) ~ ....... ­ "" ... _.... ~ .......... I I 10 FOLDS ARCHITECTS & CON8LJLTANT8 TABLE-B Internal & External Development Works in Respect of the entire Registered Phase-If (Wing-E + Club House) S. Common areas and Proposed Percentage of Details No Facilitics, Amenities (Yes/No) Work done -­ 1. Internal Roads & Footpaths Yes 0% ---­ 2. Water Supply Yes 0% Post construction _ _ byTMC ~~, ~o_,. 3. Sewarage (chamber, lines, Yes 0% As per design of Septic Tank ,STP) consultants 4. Storm Water Drains Yes 0% As per design of consultants 5. Land scaping & Tree Planting Yes 0% As per design of consultants 6. Street Lighting Yes 0% --- ... 7. Community Buildings No 0% ---­ 8. Treatment and disposal of Yes 0% As per design & sewage and sullage water dwg of consultants 9. Solid Waste management & Yes 0% As per design & Disposal dwg of consultants 10. Water conservation, Rain Yes 0% As per design & water harvesting dwg of consultants 11. Energy management Yes 0% As per design & dwg of consultants 12. Fire protection and fire safety Yes 0% As per Fire NOC requirements 13. Electrical meter room, sub- Yes 0% Electric Meter Yes station, receiving station Sub Station-No Receiving Station- No 14. Others( Option to Add more) --­ --- --- Detail as per table A & B Based on above activities we hereby certify total % completion of construction work is Raj Torres Phase II Wing A Wing B Wing eWing D Wing E=19% Yours faithfully, for, UD FOLDS Architects & Consultants. A. \'i1J1~ ,~(\WJ \l '~ _.--:-: (A. R CHI T E C I') R~go NiQl, CA/21()I()]t/27699,