FORM-2A [See MahaRERA Order No. _______] ENGINEER'S CERTIFICATE FOR QUALITY ASSURANCE (Site Supervisor's Certificate) (To be submitted at the end of the financial year) Date: 25/05/2026 To, M/s. Deepak Builders and Developers, Plot No.4, S. No. 613/3/5, Near Janlaxmi Co. Op. Bank Ltd., Behind Surabhi Hotel, Mumbai Naka Nashik -422001. Quality Assurance Certificate (Project Registration No. P51600023610 for the Year Ending FY 2025-26) Subject: Certificate for quality of materials used and quality of Construction and workmanship for the work of Shree Kalika Plaza having MahaRERA Registration Number P51600023610, being developed M/s. Deepak Builders and Developers. Sir, I, Mukund Bagul have undertaken an assignment of supervision of this real estate project. Our Responsibility. To carry out the work in accordance with the development permission and as per the approved plan and submit certificate of supervision of work and to carry out material testing in-situ or in the authorized laboratory as per prevailing and applicable standards and to ensure quality of work and workmanship as per prescribed specifications, and as per NBC and or other relevant code of practice. The details of the quality are as follows: 1. Structural Design, Stability and Testing Sr. Parameters Yes/No Remarks No. 1 Whether soil investigations of the site have Yes Completed been conducted before the structural design and soil parameters have been accounted for in the structural design/ drawings? 2 Whether Structural Engineer has been Yes Name: Mr. Sanjeev Patel appointed for the Project? License No: 080834/5 Mobile: 9823191590 Email: sanjeevmpatel@gmail.com 3 Whether the inspection Registers, Site Yes Yes, we have done order book and Quality control Test registers are maintained at the site properly and endorsed by the Engineer-in-charge? 4 Whether testing facilities to check quality Yes Yes, we have done of material is available at site? 5 Whether the statuary provisions for disaster Yes Yes, we have done resistance / earthquake resistant design have been incorporated, especially in case of multistoried Construction? 6 Has suitable cognizance been taken on No demarcated flood lines and appropriate precautions taken for protecting the site from flooding considering local flooding issues? 2. Input Materials Sr. Parameters Yes Remarks No. 1 Whether the following Building Materials confirm to relevant IS/ BS/NBC code, or as per industry standards. If yes, provide details: (a) Cement, Concrete and Coarse Yes As per norms we have Aggregate done (b) Steel and its alloys Yes As per norms we have done (c) Electrical wire, fittings and Yes As per norms we have accessories done (d) Plumbing and Sanitary Fittings Yes As per norms we have done 2 Whether regular tests of materials and Yes Done construction products are being done from accredited labs also? If yes, details of such labs 3 Whether manufacturer test certificate for Yes Done cement, steel, pipes etc. have been obtained with supply and records are being maintained? 4 Whether Suitable water is being used for Yes Done construction? (i) What is the source of water? Yes Yes, Borewell (ii) Has water been tested and approved by Yes Yes, we have done Engineer-in-Charge before construction? (iii) Has water been tested subsequently as per Yes Yes, we have done requirement? 3. Quality of Workmanship Sr. Parameters Yes Remarks No. 1 Whether works of all the electrical wiring/ Yes Done connections / lift installation / other electrical installations have been carried out under authorized /registered electrical engineer and its records has been maintained. 2 Whether all related works of plumbing & Yes Done sanitary including installation of water supply systems, drainage systems, sewage systems, sinks, toilets etc. have been carried out under authorized /registered plumbers / sanitary contractors and its records has been maintained. 3 Whether all the work is being carried out Yes Done under supervision of experienced and skilled professional. Further, workmanship and quality is satisfactory and up to the mark and the work has been acceptable within the permissible limits of deviations as per relevant code of practice. 4 Whether remedial measures are undertaken Yes Done to prevent Dampness & Leakages? If yes, provide details 5 Whether safety precautions are during Yes Done construction activities for workers? 4. Miscellaneous Sr. Parameters Yes Remarks No. 1 Whether third party quality inspection is No being carried out on site during/after completion of the works. If yes, provide details 2 Whether anti-termite treatment has been Yes Done undertaken for the soil? 3 Whether fire-fighting arrangements has been Yes Yes, undertaking undertaken under supervision of fire consultant? 4 Whether proper signages have been installed Yes Done on site/ completed building as per requirement. 5 Whether precautions are undertaken to avoid Yes Done air pollution during construction? Please specify. 6 Whether records of all test reports / results Yes Done have been properly kept in the prescribed formats to be available at site for viewing by allottees and to be handed over to the association of allottees 7 Whether all relevant records including Yes Done sanctioned Building plans, utility drawings, Various test reports / results have been properly kept in the prescribed formats to be handed over to the association of allottees. 8 Any innovative/ cost effective/ green No technology has been used for improving Quality/ Energy efficiency. Yours Faithfully, Signature of Engineer (Site Supervisor) Name: Mr. Mukund Bagul Qualification: Diploma in Civil Engineering License No. (If any)- 578578 Phone No: 9890044278 Place: Nashik Agreed and accepted by For, M/s. Deepak Builders and Developers Signature of Promoter Name: Mr. Deepak Kalyanji Chande Designation: Proprietor Date: 25/08/2026