Mukund Bagul Consulting Engineer License No. 578578 15 A - Sai Ratan B Residency, Molwani Factory road, Nasik Road - Ph. 9890044278 roRM - 2 (See Regulation 3) ENGINEER'S CERTIF'ICATE (To be submitted at the time of Registration of Ongoing Project and for withdrawal of Money from Designated Account-Project wise) Date:2910512026 To, Deepak Kalyanji Chande 1, Deepak Builders and Developers, Old Mumbai Agra Road, Gadkari Chowk, Infront of Janlaxmi Bank, Nashik Maharashtr a- 422 002. Subject: Certificate of Cost Incurted for Development of "Shree Ka'lika Plaza" having MahaRERA Registration Number P51600023610 being developed by M/s. Deepak Kalyanji Chande. Sir, I, Mr. Mukund Govind Bagul have undertaken assignment of certifying Estimated Cost for "Shree Kalika Plaza" having MahaRERA Registration Number P51600023610 being developed by M/s. Deepak Kalyanji Chande. We have estimated the cost of civil. MEP and allied works required for completion of the apartments and proportionate completion of internal & external works of the project as per specifi0cations mentioned in agreement of sale. our estimated cost calculations are based on the drawings/plans made available to us for the project under reference by the Developer / consultants. The schedule of items and quantity required for the entire work as calculated by _--_ Quantity Surveyor* appointed by Developer/Engineer, the assumption of the cost of material, labour and other inputs made by developer, and the site inspection carried out by us to ascertain / confirm the above analysis given to us. 1. We estimate Total Estimated Cost of completion of the aforesaid project under reference at Rs. 88,75,20,193.00/- (Total of Table A and B) at the time of Registration. The estimated total cost of project is with reference to the Civil, MEP and allied works required for completion of the apartments and proportionate completion of internal & extemal works, as per specifications mentioned in agreement of sale and for the purpose of obtaining occupation cerlificate/completion certificate for the building(S) / Wing(S) / Layout / Plotted Development from the Nashik Municipal Corporation being the planning authority under whose jurisdiction the aforesaid project is being implemented. The estimated Cost Incurred till date is calculated at Rs. 45,33,60,387.591- (Total of Table A and B). The amount of Estimated Cost Incurred is calculated on the basis of input rnaterials /services used and unit cost of these items. J. The Balance cost of Completion of the Civil, MEP and Allied works for completion of the apartments and proportionate completion of intemal & external works, as per specifications mentioned in agreement of sale, of the project is estimated at Rs. 43,41,,59,805.411- (Total of Table A and B). 4. I certifr that the cost of the Civil, MEP and allied work for the apartment and proporlionate internal & external works, as per specifications mentioned in agreement of sale, of aforesaid Project as completed on the date of this certificate is as given in Table A and B Below: Table A Building/WrnglLayout/Plotted Development bearing Number 1 or called "Shree Kalika Plaza" (To be prepared separately for each Building lWinglLayout/Plotted Development of the Real Estate Project) Sr. No. Particulars Amounts (In Rs.) 1 Total Estimated cost of the 88,75,20,193.AAL building/winglLayout/Plotted Developments on date of Reeistration is 2 Cost incurred as on date3010612025 4s,33,60,387 .591- J Work done in percentage (as percentage of the estimated cost) 51.08% 4 Balance Cost to be Incumed**(Based on 43,41,59,805.411- Estimated Cost) 5 Cost incurred on additional / Extra Items not NA included in the Estimated Cost (Table-C) Table B Internal & External Development Works in Respect of the Registered Phase Sr. No. Particulars Amounts (In Rs.) 1 Total Estimated cost of the lntemal and 0.00/- External Development works including amenities and facilities in the layout as on date of Registration is 2 Cost incurred as on date 3010612025 0.00/- J Work done in percentage (as percentage of the 0% estimated cost) 4 Balance Cost to be Incurred (Based on 0.00/- Estimated Cost) 5 | Cost incuned on additional / Extra Items not I NA included in the Estimated Cost (Table-C Yours Fanhrstty MI Mr. Mukund Govind Bagul License No.: 578578 Agreed and accepted by: For, M/s. Deepak Builders and Developers. Signature o@#o-*ot., Name: Mr. Deepak Kalyanji Chande Partner Date:2910512026 Note: l. The scope of work is to complete Registered Real Estate Project as per Drawings approved from time to time and as per specifications mentioned in agreement of sale. 2. (*) Quantity survey can be done by office of engineer or can be done by an independent Quantity Surveyor, whose Certificate of quantity calculated can be relied upon by the Engineer. In case of independent quantity surveyor being appointed by Developer, the name has to be mentioned at the place marked (*) and in case quantity are being calculated by the Engineer, the name of the person in the office of Engineer, who is responsible for the quantity calculated should be mentioned at the place marked (*). 3. (**) Balance Cost to be incurred (4) may vary from Difference between Total estimated Cost (1) and Actual Cost incurred (2) due to deviation in quantity required / escalation of cost etc. As this is an estimated cost, any deviation in quantity required for development of the Real Estate Project will result in amendment of the cost incurred/ to be incurred. 4. All components of work with specifications are indicative are not exhaustive. 5. Please specifu if there are any deviations / qualifications. Example: Any deviations in input material used from specification in agreement of sale. Table C List of Extra / AdditionaU Deleted ltems considered in cost (which were not part of the original estimated of Total Cost) Sr. List of Extra/ AdditionaU Deleted items Amount (In Rs.) No. 1 2.