Ar. DhlrrJ WrlI J I +91 90114165l6 in-ri. cliz(E:5s' Architect's Certif icate Date:01.07.23 To, Deepak Builders and Developers, Plot No.4, S.No. 613/t/S, Near Janlaxmico.Op. Bank Ltd., Behind Surabhi Hotet, Mumbai Naka Nashik -422001 Subiect : certificate of PercentaBe of completion of construction work ot shree Kalika plaza having MahaRERA Registration Number pslGOOOZ3610 beinB Developed by Deepak Builders & Developers. 5ir, I Dhirai Walunj have undenaken assignment as Architect / Licensed Surveyor of ceni6i ing PercentaBe of compretion of conslruction work of shree Kalika plara having MahaRERA Registration Number p516OOO23EIO beint developed by Decpak Builders & Developers. Based on Sire rnspection , with respect to r-ayout / each of the Buirding / wing of the aforesaid Real Estate Pro,ect. r certify rhat as on the date of this cerriticate , the percentage of work done for each or the buirding / win' 0t the Rear Estate project under MahaRERA is as per Tabre A herein berow. The percentage of rhe work executed with respect to each of the activity of the entire pt,"re ' is oetali"o in Table B. TABTE - A 5r lJo Task / Activity Percentage of AclualWork Oone (As on date of the Cenifirate) (1) (2) (3) I Ircavation 100 2 Basements 100 l Podiumt 4 Phnl h 100 Ohtr tr qA Oltrce tlo 308 Busrne..5 f,6gy1. 11 pron ot lnd0o part Apartment. Govrnd llagar lhshrk. {22 001 Emarl com 5 Stalt Floor 6 Slab of 5uper Structure 66 7 lnternal Walls, lnternal Plaster, Floorings, Doors an d 57 Windorvs rvithin Flats /Premises 8 Sanitary Fittings within the Flats / Premises 30 62 9 Staircases, l-ifts, Wells and Lobbies at each tloor level Overhead and Underground watet Tanks 35 10 Exlernal Plumbing and lnlernal Plaster, elevation, completion of terraces with waterproofing of the BuildinB / wing. 20 11 lnstallation of Lifts, water pumps, Fire Fig hting Fittangs and Equipment as per CFO NOC, Electrical Fitlings, mechanical equipment, compliance to conditions of environment / CRZ NOC, Finishin8 to entrance Lobby/s, plinth protection, pavinl ol areas appurtenant to Building / win& Compound wall and all other requirements as maY be required to complete proiect as per specifications in agreement of 5ale. Any other activities. TABI.E - B Comman Areas (lnternal and External OeveloPment Worts) in resPect of the Registered Phase Proposed Percentage of Details 5r. No. Common areas and Facilities (Yes/No) Actual Work Done (As on date of the cenificatel (3) (41 (sl (1) l2l 1 lnternalRoads and No Footpaths 2 Water Supply yes 30 I 3. Sewerate (Chamber, lines, ye5 20 Septic Tank, STPI . 4. Storm water Drains yes 10 5 land Scaping and Tree yes 5 Planling ,Chr,u1 r ytolunfl .::i::J . aA-, ucS l ?668t hq\Nr .r*\..:.: S,gr:._.,,. 6. street Lighting no 7 Community Buildings no 8 Treatment and disposal of sewage and sullaBe water 9 Solid waste management & Disposal 10. Water Conservation/ Rain water harvesting 11. Energy Management t2. Fire Protection and fire safety requirements yes 25 1J Electrical meter room, su b- station, receiving station 14. Others (OPtion to Add more) Yours FaithfullY, Signature of Architect Name : Dhirai Walunj 10hr,o1 r WolunJ) q aRc .cAt / 36699 tr.,fV Agreed and AccePted bY For Dee and DeveloPers 7 ,a { =. (Promoter) I Name: Kalyanji Chande Oate:01.07.23