Nashik Municipal Corporation OCCUPANCY CERTIFICATE Application No. NMC/TPD/Chunchale/OC/0230/2021 Application Date: 26 August, 2019 Date : 02/07/2021 Permission No:/OC LND/OC/Chunchale/DCR/0206/2021 Occupancy Issued Date: 02 July, 2021 Building Permit No: LND/BP/Chunchale/1478/2019 Building Permit Date: 19 August, 2019 Building Commencement Notice submitted by the Applicant 26 August, 2019 Ref: Building Completion Notice submitted by the Applicant 18 February, 2021 CSC Occupancy No. NMC/TPD/Chunchale/OC/0230/2021 The Owners/Builder/Developer /Licensed Architect/Engineer / Structural Engineer have given the Building Completion Notice that the building has been completed as per the specifications of Sanctioned Plans and it is declared that the building conforms in all respects to the requirements of the building regulations contained under the statutory provisions in the respective Municipal Act and Building Bye Laws/Rules issued by the Govt. This is to certify that the building has been inspected and is declared fit for occupation. NAME OF THE SHREE CONSTRUCTIONS THROUGH PARTNER SHRI. AJAY B. THORAT AND SHRI. A NILESH M. JADHAV OWNER/Developer B LOCATION OF THE PROPOSED SITE 1 Plot No. 1 2.Survey No. - 3 District Nashik 4.Village Chunchale 5 Division Satpur 6.Town/ City NASHIK C DETAILS OF THE COMPLETED BUILDING 1 Building Permit / Permission No. LND/BP/Chunchale/1478/2019 Building Permit / 19 August, 2019 Permission Date a Due date for completion of the building 25 August, 2020 b Date on which completion notice submitted 18 February, 2021 2 c Whether it is completed within the stipulated time NO d If No, to collect the Fine Rs(44950/-) for Revalidation /Revised Charges as per the NMC Act as per the rules in force As per Documents As per submitted Plan Road Widening Area Net Area 3 Site Area (m2) 0.00 0.00 0.00 4,803.82 D BUILDING WISE DATA Building Name Building Name D-1 No. of Floors Cellar + Stilt Ground +Upper Floors 4 a As per Sanctioned Plan 0Celler+0 Stilt 1Ground Floor + 0Upper Floor b As per Completed Building Plan 0Celler+0 Stilt 1Ground Floor + 0Upper Floor Use of the Building 5 a As per Sanctioned Plan Residential b As per Completed Building Plan Residential Floor Area (m2) 6 a As per Sanctioned Plan 335.65 b As per Completed Building Plan 335.65 i) Parking Area (m2) ii)Tot -lot area (m2) 7 a As per Sanctioned Plan 22 0 b As per Completed Building Plan 22 0 Setbacks(m) Front Rear Side-1 Side-2 a As per Sanctioned Plan 9.50 8.57 1.50 2.25 b As per Completed Building Plan 9.50 8.57 1.50 2.25 8 c Extent of deviation in % 0.00 0.00 0.00 0.00 d Fine Paid Rs( ) as per the NMC Act, as per rules in force Height (m) 9 As per Sanctioned Plan 3.51 As per Completed Building Plan 3.51 RWH(Rain Water Harvesting ) 10 As per Sanctioned Plan 4 As per Completed Building Plan 4 Building Name Building Name C-1 No. of Floors Cellar + Stilt Ground +Upper Floors 4 a As per Sanctioned Plan 0Celler+0 Stilt 1Ground Floor + 0Upper Floor b As per Completed Building Plan 0Celler+0 Stilt 1Ground Floor + 0Upper Floor Use of the Building 5 a As per Sanctioned Plan Residential b As per Completed Building Plan Residential Floor Area (m2) 6 a As per Sanctioned Plan 335.65 b As per Completed Building Plan 335.65 i) Parking Area (m2) ii)Tot -lot area (m2) 7 a As per Sanctioned Plan 22 0 b As per Completed Building Plan 22 0 Setbacks(m) Front Rear Side-1 Side-2 a As per Sanctioned Plan 3.00 9.50 1.50 2.25 b As per Completed Building Plan 3.00 9.50 1.50 2.25 8 c Extent of deviation in % 0.00 0.00 0.00 0.00 d Fine Paid Rs( ) as per the NMC Act, as per rules in force Height (m) 9 As per Sanctioned Plan 3.51 As per Completed Building Plan 3.51 RWH(Rain Water Harvesting ) 10 As per Sanctioned Plan 4 As per Completed Building Plan 4 Building Name Building Name B-1 No. of Floors Cellar + Stilt Ground +Upper Floors 4 a As per Sanctioned Plan 0Celler+0 Stilt 1Ground Floor + 0Upper Floor b As per Completed Building Plan 0Celler+0 Stilt 1Ground Floor + 0Upper Floor Use of the Building 5 a As per Sanctioned Plan Residential b As per Completed Building Plan Residential Floor Area (m2) 6 a As per Sanctioned Plan 390.94 b As per Completed Building Plan 390.94 i) Parking Area (m2) ii)Tot -lot area (m2) 7 a As per Sanctioned Plan 22 0 b As per Completed Building Plan 22 0 Setbacks(m) Front Rear Side-1 Side-2 a As per Sanctioned Plan 9.50 8.57 2.25 1.50 b As per Completed Building Plan 9.50 8.57 2.25 1.50 8 c Extent of deviation in % 0.00 0.00 0.00 0.00 d Fine Paid Rs( ) as per the NMC Act, as per rules in force Height (m) 9 As per Sanctioned Plan 3.51 As per Completed Building Plan 3.51 RWH(Rain Water Harvesting ) 10 As per Sanctioned Plan 4 As per Completed Building Plan 4 Building Name Building Name A-1 No. of Floors Cellar + Stilt Ground +Upper Floors 4 a As per Sanctioned Plan 0Celler+0 Stilt 1Ground Floor + 0Upper Floor b As per Completed Building Plan 0Celler+0 Stilt 1Ground Floor + 0Upper Floor Use of the Building 5 a As per Sanctioned Plan Residential b As per Completed Building Plan Residential Floor Area (m2) 6 a As per Sanctioned Plan 390.94 b As per Completed Building Plan 390.94 i) Parking Area (m2) ii)Tot -lot area (m2) 7 a As per Sanctioned Plan 22 0 b As per Completed Building Plan 22 0 Setbacks(m) Front Rear Side-1 Side-2 a As per Sanctioned Plan 3.00 9.50 2.25 1.50 b As per Completed Building Plan 3.00 9.50 2.25 1.50 8 c Extent of deviation in % 0.00 0.00 0.00 0.00 d Fine Paid Rs( ) as per the NMC Act, as per rules in force Height (m) 9 As per Sanctioned Plan 3.51 As per Completed Building Plan 3.51 RWH(Rain Water Harvesting ) 10 As per Sanctioned Plan 4 As per Completed Building Plan 4 Yours faithfully, % DSUnknown q 1G 1g 0.1 0 0 0.1 9 0 cm 0 J 0 j 4 M []0 d 1i 0g 313 292 m 313 404 325 453 432 529 c 478 561 504 597 504 645 c 504 736 440 760 391 760 c 286 760 271 681 265 626 c 265 625 l 100 625 l 100 828 253 898 381 898 c 451 898 679 878 679 650 c 679 555 628 499 538 435 c 488 399 467 376 467 292 c 313 292 l h 308 214 170 -164 re f 0.44 G 1.2 w 1 1 0.4 rg 287 318 m 287 430 299 479 406 555 c 451 587 478 623 478 671 c 478 762 414 786 365 786 c 260 786 245 707 239 652 c 239 651 l 74 651 l 74 854 227 924 355 924 c 425 924 653 904 653 676 c 653 581 602 525 512 461 c 462 425 441 402 441 318 c 287 318 l h 282 240 170 -164 re B Q Organization : Personal Designation : Executive Engineer Date : 02-Jul-2021 18: 08:37 Certificate : 279FB46D010F38C3 Authority_Sign Executive Engineer Nashik Municipal Corporation Copy to: 1. The Addl. Commissioner (Fin.), NMC . 2. The Zonal Commissioner, NZ, NMC . 3. The Dy. Commissioner, Circle No.-, NMC with a request for assessment of PT / VLT upto date. 4. The Asst. City Planner, Circle No.-, NMC . 5. The Sub-Registrar, ______________ with a request to release the mortgaged area. 6. The Addl. Commissioner (Revenue), NMC with a request for assessment of property tax at once from the date of issue of O.C.