Nashik Municipal Corporation OCCUPANCY CERTIFICATE Application No. NMC/TPD/Satpur /OC/0183/2021 Application Date: 01 August, 2019 Date: 09/04/2021 Permission No:/OC ILND/OC/Satpur/DCR/0148/2021 IOccupancy Issued Date: 09 April, 2021 Building Permit No: ILND/BP/Satpur/DCR/1521/2019 IBuilding Permit Date: 01 August, 2019 Building Commencement Notice submitted by the Applicant 01 August, 2019 Ref: Building Completion Notice submitted by the Applicant 24 March, 2021 CSC Occupancy No. INMC/TPD/Satpu r/OC/O 183/2021 The Owners/Builder/Developer /Licensed Architect/Engineer / Structural Engineer have given the Building Completion Notice that the building has been completed as per the specifications of Sanctioned Plans and it is declared that the building conforms in all respects to the requirements of the building regulations contained under the statutory provisions in the respective Municipal Act and Building Bye Laws/Rules issued by the Govt. This is to certify that the building has been inspected and is declared fit for occupation. NAME OF THE ShrLSudhakar Garabad Mahajan A OWNER/Developer B LOCATION-OF THE PROPOSEDSITE 1 Plot No. 7 2.Survey No. 493/2 3 District Nashik 4.Village Satpur 5 Division Satpur 6.Town/ City Nashik C DETAILS OF THE COMPLETEDBUILDING 1 Building Permit / Permission No. I~ND/BP/satPur/DCR/1521/201 Building Permit / 101 August, 2019 Permission Date a Due date for completion of the building 31 July, 2020 b Date on which completion notice submitted 24 March, 2021 2 c Whether it is completed within the stipulated time NO d If No, to collect the Fine Rs(6750/-) for Revalidation /Revised Charges as per the NMC Act as per the rules in force 3 Site Area (m2) I As per Documents As per submitted Plan Road Widening Area I Net Area 0.00 0.00 4.31] 393.86 D BUILDING WISE DATA Building Name Building Name Shri.Sudhakar Garabad Mahajan No. of Floors Cellar + Stilt Ground +Upper Floors 4 a As per Sanctioned Plan OCeller+O Stilt OGround Floor + 4Upper Floor b As per Completed Building Plan ocene--o Stilt OGround Floor + 4Upper Floor Use of the Building 5 a As per Sanctioned Plan Residential b As per Completed Building Plan Residential Floor Area (rn2) 6 a As per Sanctioned Plan 589.68 b As per Completed Building Plan 589.68 i) ParkingArea (m2) ii)Tot -lot area (m2) 7 a As per Sanctioned Plan 0 389.55 b As per Completed Building Plan 0 389.55 Setbacks(m) Front Rear Side-l Side-2 a As per Sanctioned Plan 3.00 3.00 3.00 3.00 b As per Completed Building Plan 3.00 3.00 3.00 3.00 8 c Extent of deviation in % 0.00 0.00 0.00 0.00 d Fine Paid Rs( ) as per the NMC Act, as per rules in force Height(m) 9 As per Sanctioned Plan 115 As per Completed Building Plan 115 RWH(RainWaterHarvesting) 10 As per Sanctioned Plan 10 As per Completed Building Plan 10 Yours faithfully, Document certified by RAJENDRA VINAYA Executive Engineer Nashik Municipal Corporation Copy to: 1. The Addl. Commissioner (Fin.), NMC . 2. The Zonal Commissioner, NZ, NMC . 3. The Dy. Commissioner, Circle No.-, NMC with a request for assessment of PT / VLT upto date. 4. The Asst. City Planner, Circle No.-, NMC . 5. The Sub-Registrar, with a request to release the mortgaged area. 6. The Addl. Commissioner (Revenue), NMC with a request for assessment of property tax at once from the date of issue of O.C.