ゾ Form 1 (See Regulation 3 ) ARCHITECT'S CERTIFICATE Date : !4 tor_ /2cz3 To, Poonam Builders 101. Agora Commercial Complex Canada Corner, Sharanpur Road Near BSNL Office, Nashik - 422002 Subject : Certificate of Percentage of Completion of Construction work of BUSINESS GALAXY having Maha RERA Registration No. P51500023575 being developed by Poonam Builders. Sir, I Mr. Sagar Arun Kabre have undertqken assignment as Architect / Licensed Surveyor of certifying Percentage of Completion of construction work of the BUSINESS GALAXY having Maha RERA Registration No. P51600023575 being developed by Poonam Builders Based on Site tnspection, with respect to layout each of the Building / wing of the aforesaid Real Estate Project, I certify that as on the date of this certificate, the percentage of work done for each of the building / wing of the Real Estate Project Under MahaRERA is as per table A herein below. The Percentage of the work executed with respect to each of the activity of the entire phase is detailed in the table KABRE CONSULTANTS 、19ner s Ar chi t ect s: nt er i or D● S5/ 6, Sahyadr i House, ' M: CO Ci r cl e, T mbak Road, Nashi k‐ 2 Ph. : 0253‐ 2319077 ヽ/ TABLE A . BUS: NESS GALAXY A Wi NG″ { t O be pr epar ed separ at el y f or bui l di ng of t he pr oj ect } S. Tasks / ectivity Per cent age of No. act ua: wor k done 〔 As on 31ノ 03ノ 2021) { 1) { 2} { 3) 1 Excavation 1000/ 0 2 Two number of Basements and plinth 750/ 0 3 Number of Podium 4 St i l t f l oor 0 5 slab of super structure 0 6 lnternal walls, lnternal Plaster , flooring Doors and 0 windows within Flat premises. 7 Sanitary fittings within the Flat / premises. 0 8 Staircase Lifts well and Lobbies at each Floor level 0 overhead and under ground water tanks. 9 The External plumbing & external plaster elevation completion of terrace with waterproofing of the 0 building / wing 10 !nstallation. of lifts, water pumps, Fire fighting fittings and equipment as per CFO NOC Electrical fittings, mechanical equipment. Compliance to condition of environment / CRZ NOC Finishing to entrance lobby/s plinth protection , paving of area 0 apartment to Building / wing . Compound wall and all other requirements as may be required to completion the project as per specification in agreement of sale. Any other activities. 喜郡 淋 w鰐 署 γ「 TABLE A BUSINESS GALA]XY, B WING, ( to be prepared separately for building of the project ) s. Tasks / ectivity Percentage of No. actual work done (As on 3tl03l202tl 〔 1〕 { 2) { 3) 1 Excavation 1000/ 0 2 Two number of Basements and Plinth 75% 3 Number of Podium 4 St i l t f l oor 0 5 slab of super structure 0 6 lnternat walls, lnternal Plaster, flooring Doors and 0 windows within Flat premises. 7 Sani t ar y nt t i ngS wi t hi n t he Fl at / pr emi ses。 0 8 Staircase Lifts well and Lobbies at each Floor level 0 overhead and under ground water tanks. 9 The External plumbing & externa! plaster elevation completion of terrace with waterproofing of the 0 building / wing 10 lnstallation of lifts, water pumps, Fire fighting fittings and equipment as per CFO NOC Electrical fittings, mechanical equipment. Compliance to condition of environment I CRZ NOC Finishing to entrance lobby/s plinth protection , paving of area 0 apartment to Building / wing . Compound wall and all other requirements as may be required to completion the project as per specification in agreement of sale. Any other activitiei KABRE CONSULTAI'ITS Architects lnterior Destgners S 5/6, Sah)'adri House' tvttCO Circte, frimbak Roac Nashik'2' Ph.:0253-231907 7 \ // Common Areas (.lnternal & Externat Development works ) in Respect of the Registered phase / Proiect No. P51600023575 S Common Area and Proposed Percentage Det a‖ s No。 facilities Amenities Yes / No of actual work done 1 lnternal Roads & Footpath No 0 NA 2 Water conservation rai n Only rain water Yes 0 water harvesting harvesting 3 Energy Management No 0 NA 4 Fire Protection and fire Yes 0 Yes safety requirements 5 Electrical meter room Only Electrical substation, receiving Ves 0 Meter Box station 6 Aggregate area of 0 NA No recreational Open space 7 Open parking No 0 NA 8 Water supply Ves 0 Borewell 9 Sewerage ( Chamber lines, Ves 0 NO STP septic Tank, STP 10 Storm water Drain No 0 NA 11 Landscaping & Tree Only Tree Ves 0 planting planying 12 St r eet Li ght i ng No 0 NA 13 Community Buildings No 0 NA 14 Treatment and disPosal of 0 NA No sewage and sullage water 15 Solid waste management & 0 NA No disposal KABRE CONSULTANTS Ar chi t eCt S i nt er i Or Desi gner s S56, Sahy: l r 配 剛C° ° 鷺. 職 : ど l ashk‐ 『 2"9077 2. ' ヽ / / Yours faithfully, L qe-' Sagar Arun"Kabre KABRE CONSULTANTS Signature & name of Architect Ar chi t ect s i nt er i or Desi gner s S5ノ 6, Sahyadr i House, , License No. CA l2OOOl2583O M: CO Ci r cl e, Tr l mbak Road〕 Nashi k‐ 2. Ph. : 0253‐ 2319077 Agr eed and accept ed by For Poonam Bu‖ der s P00NAM BU! LDERS //み 夕4, 111丁 NER Signature of Promoter Name : Mr. Shrenik Shashikant Surana HUF Date : lh lozl'zo.z3