Form 1 (See Regulation 3 ) ARCH ITECT'S CERT! FICATE Date: 14toz/Zoz3 To, Poonam Builders 101. Agora Commercial Complex Canada Corner, Sharanpur Road Near BSNL Office, Nashik - 422OO2 Subject : Certificate of Percentage of Completion of Construction work of BUSINESS GALAXY having Maha RERA Registration No. P51500023575 being developed by Poonam Builders. Sir, I Mr. Sagar Arun Kabre have undertaken assignment as Architect / Licensed Surveyor of certifying Percentage of Completion of construction work of the BUSINESS GALAXY having Maha RERA Registration No. P51600023575 being developed by Poonam Builders Based on Site lnspection, with respect to layout each of the Building / wing of the aforesaid Real Estate Project, I certify that as on the date of this certificate, the pbrcentage of work done for each of the building / wing of the Real Estate Project Under MahaRERA is as per table A herein below. The Percentage of the work executed with respect to each of the activity of the entire phase is detailed in the table KABRE CONSUL. T' I t Ar chi t ect s i nt er i or D=ヽ .,(1 剛c。 £』 身f 認 111: : 、 ぉ Ph. : 0253‐ 2319じ ̀ 7 BUSINESS GALA}U "A WING' ( to be prepared separately for building of the project ) S. Tasks / Activity Percentage of No. actual work done (As on 3ol06l2o2tl { 1) { 2) { 3) 1 Excavation 1000/ 0 2 Two number of Basements 1000/ 0 3 Number of Podium 4 P‖ nt h 100% 5 St i l t f l oor 50% 6 slab of super structure 0 7 lnterna! walls, lnternal Plaster , flooring Doors and 0 windows within Flat premises. 8 Sant ar y nt t i ngS Wi t hi n t he Fl at / pr emi ses, 0 9 Staircase Lifts well and Lobbies at each Floor level 0 overhead and under ground watertanks. 10 The External plumbing & external plaster elevation completion of terrace with waterproofing of the 0 building / wing 11 lnstallation of lifts, water pumps, Fire fighting fittings and equipment as per CFO NOC Electrica! fittings, mechanica! equipment. Compliance to condition of environment / CRZ NOC Finishing to entrance lobby/s plinth protection , paving of area 0 apartment to Building / wing . Compound wall and all other requirements as may be required to completiori the project as per specification in agreement of sale. Any other activities. KABRE CONSULTANTS Architects lnterior Desrgners S 5/6, SahYadri Hot'se' tuttCo Clrcte, trimbak Ro,l, Nashik'2' Ph.:0253-231 9077 TABLE A BUSI NESS GALAXY BW: NG″ { t O be pr epar ed separ at el y f or bui l di ng of t he pr oi ect ) ︒ S. N TaskSノ Act i vi t v Per cent age of act ua: wor k done ( As on 30ノ06ノ 2021) { 1) { 2) { 3) 1 Excavation 1000/ 0 2 Two number of Basements 1000/ 0 3 Number of Podium 4 P‖ nt h 100% 5 St i l t f l oor 50% 6 sl ab of super st r uct ur e 0 7 lnternal walls, lnternal Plaster , flooring Doors and 0 windows within Flat premises. 8 Sanitary fittings within the Flat / premises. 0 9 Staircase Lifts well and Lobbies at each Floor level 0 overhead and under ground water tanks. 10 The External plumbing & external plaster elevation completion of terrace with waterproofing of the 0 building / wing 11 lnstallation of lifts, water pumps, Fire fighting fittings and equipment as per CFO NOC Electrical fittings, mechanical equipment. Compliance to condition of environment I CRZ NOC Finishing to entrance lobby/s plinth protection , paving of area 0 apartment to Building / wing . Compound wall and all other requirements as may be required to completion the project as per specification in agreement of sale. Any other activities. KABRE COl l St 」 L. TANTS Ar chi t ect S: nt er i or Desi gner s 卜C∩ 洋i f ' f 認 : : ! 1: : : i l ashk̲2. ' ,■ TABLE B Common Areas ( lnternal & External Development works ) in Respect of the Registered phase / proiect No. P51600023575 S Common Area and Proposed Percentage Details No. facilities Amenities Yes / No of actual work done 1 lnternal Roads & Footpath No 0 NA 2 Water conservation rain Only rain water Yes 0 water harvesting harvesting 3 Energy Mahagement No 0 NA 4 Fire Protection and fire Yes 0 Ves safety requirements 5 Electrical meter room Only Electrical substation, receiving Ves 0 Meter Box station 6 Aggregate area of 0 NA No recreational Open space 7 Open parking No 0 NA 8 Water supply Ves 0 Borewel! 9 Sewerage ( Chamber lines, Ves 0 NO STP septic Tank, STP 10 Storm water Drain No 0 NA 11 Landscaping & Tree Only Tree Yes 0 planting planying 12 St r eet Li ght i ng No 0 NA 13 Community Buildings No 0 NA 14 Treatment and disposal of No 0 NA sewage and sullage water 15 Solid waste management & No 0 NA disposal KABRE CONSt j LTANTS Ar chi t ect s: nt er i or Des, 9r 、 er s S5/ 6, Sahyadr i House, , Mi CO Ci r cl et T『 i mbak Road, Nashi k‐ 2. ph: 0253‐ 2319077 Yours faithfully, Sagar Arun Kabre KABRE CONSULTANTS Signature & name of Architect Architecls lnterior Designers S 5i6' SahYadrt House' License No. CA l2OOOl2583O utCo circte, trimbak Road, Nashik'2' Ph.:0253-231 9077 Agreed and accepted by For Poonam Builders PoONAM BU: LDERS //』 ゾ i : i Rt t NER Signature of Promoter Name : ̀ ι Mr. Shrenik Shashikant Surana HUF 'β Date : l4 toz / Zoz?