SAGAR S. SHAH B.E.(Civil) M.I.E.,FJV. F-27433 Cell: 9422247125 E-mail: er.sagarshah@gmail.com Approved Valuer. Consulting Engineer 005 54, Sahajeevan Colony, Visemala, College Road, Nashik 422 - FORM-2 ENGINEER'S CERTIFICATE Date: 30/03/2021 To, Prathamesh Viviek Gangurde Flat No. 4, Monalisa Apartment, Mahatma Nagar, ABB Circle, Trimbak Road, Nashik Work Subject: Certificate of Cost Incurred for Development of VIVEK PARK for Construction of 1 Building, situated on Plot No. 3+4 bearing G.No. 473/26 demarcated by its boundaries (latitude and longitude of the end points) Adj. Plot No. 2 to the North, 9 Meter Road to the South, 9 Meter Road to the East, Adj. Plot No. 2+3 to the West of Division Nashik, Village Adgaon, Taluka Nashik, District Nashik, PIN 422003 admeasuring 407.89 Sq. Mtrs. Area being developed by PRATHAMESH VIVEK GANGURDE Ref: MAHARERA Registration Number P51600023541. Sir, ,Er. Sagar S. Shah have undertaken assignment of certifying Estimated Cost for the Subject Real Estate Project registered under RERA, being 1 Building named VIVEK PARK, situated on Plot No. 3+4 bearing G.No. 473/26 of Division Nashik, Village Adgaon, Taluka Nashik, District Nashik, PIN 422003 admeasuring 407.89 Sq. Mtrs. Area being developed by PRATHAMESH VIVEK GANGURDE. AR S Following technical professionals are appointed by Owner/ Promoter () Mr. Umesh Bagul as Architect; Consulting Civinngineer kpoved'Valuer luer/* HA F-27433 (in) Mr. Bhavesh Patel as Structural Consultant; ASHI 1. We have estimated the cost of the completion to obtain Occupation Certificate/ Completion Certificate, of the Civil, MEP and Allied works, of the Buildingls) of the project. Our estimated cost calculations are based on the Drawings plans made available to us for the project under reference the by Developer and Consultant and the Schedule of times and quantity for the entire work as calculated by Er. Sagar S. Shah quantity Surveyor appointed by Developer/ Engineer, and the assumption of the cost of material, labour and other inputs made by developer, and the site carried inspection out by us. 2. We estimate Total Estimated Cost of completion of the building VIVEK PARK of the aforesaid project under reference as 1,25,25,000/- (In words Rupees One Crore Twenty Five Lakhs And Twenty Five Thousand Only) (Total of Table A and B). The estimated Total Cost of project is with reference to the Civil, MEP, and allied works required to be completed for the purpose of obtaining occupation certificate completion certificate for the building(s) from the Nashik Municipal the Planning Authority under whose Apartment being jurisdiction the aforesaid project is being implemented. 3 The Estimated Cost Incurred till date is calculated at 1,25,25,000/- (Total of Table A and B). The amount of Estimated Cost Incurred is calculated on the base of amount of Total Estimated Cost. 4. The Balance cost of Completion of the Civil, MEP and Allied works of the Building(s) of the subject project to obtain Occupation Certificate/ Completion Certificate from Nashik Municipal Corporation is estimated at Nil (Total of Table A and B). 5. I certify that the Cost of the Civil, MEP and allied work for the aforesaid Project as completed on the date of this certificate is as given in Table A and B Below: ARS ulting Approved Valuer F-27433 ASH TABLE-A . VIVEK PARK Amounts Sr. No. ParticularS T 1,25,25,000 1 Total Estimated cost of the building/wing as on 07/12/2019 Cost Incurred as on 30/03/2021 T 1,25,25,000 2 (based on the Estimated cost) Work done in Percentage 100 % 3 (as Percentage ofthe estimated cost) Balance Cost to be Incurred NIL 4 (Based on Estimated Cost) Cost Incurred on Additional/ Extra ltems as on 30/03/2021 not NIL 5 included in the Estimated Cost (Annexure A) TABLE B VIVEK PARK Amounts Particulars Sr. No. Total Estimated cost of the Internal and External Development amenities and Facilities in the layout as on NIL 1 Works including 07/12/2019 on the Estimated cost) NIL 2 Cost incurred as on 30/03/2021 (based of the estimated cost) NIL Work done in Percentage (as Percentage Estimated Cost) NIL Balance Cost to be Incurred (Based on Extra Items as on 30/03/2021 not Cost Incurred on Additional / NIL 5 included in the Estimated Cost (Annexure A) AR s. S AGA Yours Faithfully A RS SHA Consulting CivilEnginger /o Approved Valuer F-27433 ER. SAGARS. SHAH A S H *Note 1. The scope of work is to complete entire Real Estate Project as per drawings from time to time so as to obtain approved Occupation Certificate /Completion Certificate. 2. As this is an estimated cost, any deviation in quantity Real estate Project will result in required for development of the amendment of the cost incurred/to be incurred. 3 All components of work with specifications are indicative and not exhaustive AnnexureA List of Extra / Additional Items executed with Cost (Which were not parts of the original Estimate of Total Cost) NIL