rl I YogeshThatte STHUCTUBAL CONSULTANT C-2, Anand Bhakti Sankul, Near Ruturang Bhavan, Nashik Road - 422101 Mob. 9822678396 Email : yogeshathatte@gmail,com DATE:2.4/ttlt9 FORM - 2 ENGINEER'S CERTIFICATE To: GAJANAN HIGHTS CO-OP HOUSING SOCIETY LTD , subject: certificate of cost lncurred for Development of Residential one building of the project "GAJANAN HlGHTs" building situated on PLOT N0.31+32+33 sURVEy N1.3tgltlzsH;WAR pATHARDI demarcated by its boundaries (latitude and longitude of the end points) g.oo MT wtDE RoAD to the North PLor No' 30 to the south PLor No. 34 to the East, 9.00 MT wtDE RoAD to the west of Division Nashik village Pathardi taluka Nashik District Nashik admeasuring 554.1g seMT. Area being developed GAJANAN HIGHTS CO-OP HOUSING SOCIETY LTD. Ref. RERA Registration Number (applied for) Sir, I YOGESH THATTE have undertaken assignment of certifying Estimated cost for the subject Real Estate Project proposed to be registered under RERA, being one Building ,,GAJANAN ,, HIGHTS Building situated on the plot bearing c. N. No/ crs No. plor No.31+32+33 suRVEv No. gtSltl2 of Division Nashik village Pathardi taluka Nashik District Nashik admeasuring 554.1g sq.mts, Area being developed by GAJANAN HIGHTS CO-OP HOUSTNG SOCIETY LTD NASH|K. 1. Following technical professionals are appointed by owner / promoter:- (i) RUSHIKESH K. PAWAR as Architect; (ii) Mr. Yogesh Thatte as Structural Consultant (iii) Mr. as Quantity Surveyor 2' We have estimated the cost of the completion to obtain occupation certificate certificate, of the civil, MEP and Allied works, of the Building(s) / completion of the project. our estimated cost calculations are based on the Drawings / plans made available to us for the project under reference by the Developer and consultant and the schedule of times and quantity for the entire work as calculated by Mr. quantity surveyor* appointed by Developer/ Engineer, and the assumption of YOGESH TT{ATTE STRUCTURAL CONSUUTANT GWing, 2-Anand Bhakti Sankul, Datta Mandir Road, Nasik Road - 422101 Ph,:2462279 the cost of material, labour and other inputs made by developer, and the site inspection carried out by us. 3' we estimate Total Estimated cost of completion of the building(s) of the aforesaid project under reference as Rs.2,32,62,23o1-. The estimated Total Cost of project is with reference to the Civil, MEp, and allied works required to be completed for the purpose of obtaining occupation certificate / completion certificate for the building(s) from the Nashik Municipal Corporation, Nashik being the Planning Authority under whose jurisdiction the aforesaid project is being implemented. 4' The Estimated cost lncurred till date is calculated at Rs.10,000/-(Total of table A and B). The amount of Estimated Cost lncurred is calculated on the base of amount of Total Estimated Cost. 5' The balance cost of completion of the civil, MEP and Allied works of the Building(s) of the subject project to obtain occupation certificate completion / certificate from Nashik Municipal corporation, Nashik (planning Authority) is estimated at Rs2,32,52 ,2gol- (Total of table A and B). 6' I certify that the cost of the civil, MEP and allied work for the aforesaid project as completed on the date of this certificate is as given in Table A and B Below. TABLE - A Building : "GAJANAN HtGHTS" Total Estimated cost of the building/wing as Rs.2,27,62,2301- on24/1,1,/19 date of Registration is Cost incurred as on Z4/1,1/tg (based oh the Estimated cost) Work done in percentage (as Percentage of the estimated cost) Balance Cost to be lncurred Rs .2,27,62,230/- (Based on Estimated Cost) Cost lncurred on Additional/ Extra ltems as on 24/1,L12019 not included in the Estimated Cost (Annexure A) YOGESH THATTE STRUCTURAL CONSULTAI.{I C-Wng, z-Anend Bhalfii Sankul, Datta Mandir Road, Nasik Roao - 422101 Ph.:- 2462239 EEEEI.-3:lry: $q=*TaFFir-+F- : TABLE _ B (To be prepared forthe entire registered phase ofthe Real Estate project) 5r. No. Particulars Amounts 1. Total Estimated cost of the tnternal and External Development Works including amenities and Facilities in the layout as on 24/tt/2019 date of Registration Rs.5,00,000/- is 2 Cost incurred as on 24/t1./2019 (based on the Estimated cost) RS.10,000/- 3 Work done in Percentage (as Percentage of the estimated cost) 2% 4 Balance Cost to be lncurred (Based on Estimated Cost) Rs.4,90,000/- 5 Cost lncurred on Additional/ Extra ltems as on 24/1712019 not included in the Estimated Cost (Annexure A) NIL STRUCTURAL CONSULTANT NAME: MT. YOGESH THATTE PAN CARD:ABSPT2479D I AADHAR CARD : 925971.529489 YOGESH THATTE STRUCTT,'RAL CONSUITAI\TT, C-Whg, 2-Anand Bhakti Sankul, CONTACT NO: 982267839G Datta MandirRoad, Nasik Road - 422101 Ph.i2462239