Architect , Government approved value Interiors & landscape designers Form 1(see Regulation 3) Project management consultant Vastu co$ultant ARCHITECT,S CERTIFICATE (To be submitted at the time of Registration of Ongoing project and for Withdrawal of Money from DesiSnated Account) DaIe:20/08/2019 To, GAJANAN HEIG HTS CO-OP.HSG,SOC,LTD, p.No.31+32+33, S.NO. 3r3/7/2 PATHARDI,NASHIK NASHIK. su bject: Certificate of percentage of completion of construction work of one No. of Building one Wings of the single Phase of the project "GA.IANAN HEIGHTS " Situated on the plot bearin8 survey No 313/1/2 plot No: 31+32+33 demarcated by its boundaries. 9.00 M RoAD to the North ,P.NO. 30 to the south, p.No.34 East, 9.00 M ROAD W|DE to the West of PATHARDI Division NASHIK Village NASHIK Taluka District NASHIK PIN 422 010 admeasuring 554.18 sq.mts. area being developed by "GAJANAN HEIGHTS". 5 tr, I RUSHIKESH K, PAWAR have undertaken assignment as Architect of certifying percentage of completion of construction work of the "GAJANAN H ElG HTS " Building slNG LE Wings of the slNG LE phase of the Project, situated on the pfot bearing Survey No. 38/7/2 Plot No.31+32+33 of Division PATHARDI Village NASHIK. Taluka NASHIK District NASHIK PIN-422 O1O admeasuring 554.18 sq. mts. area being developed by "GAJANAN HEIGHTS " 1. Following technical professionals are appointed by Owner/ Promoter:- (i) M/s: RUSHIKESH K.PAWAR as L.S./Architect (ii) M/s: YOGESH A. TATTHE as StructuralConsultant (iii) M/s: NA as MEP coniultant (iv) M/s : NA as Site SuPervisor Based on Site lnspection, with respect to each of the buildiilg of the aforesaid Real Estate project, I certifY that as on the date of this certificate, the percentage of work done for each of the building of the Real Estate project as registered vide number - under is as per table A herein below. The percentage of the work executed with respect to each of the activitv of the entire phase is detailed in ta ble B. 3, SANSKRUTI Co - Op. H0USING SoCIETY LTD, MURKUTE COLONY, NEW PANDIT COLONY., GANGAPUR ROAD, NASHIK. 422002 MOBILE 1 98226277?7 ,942082777? E - MAIL : TThrishiadgmail.com PHONE:0253 - 2315177 Table A Building '4GAJANAN HEIGHTS " 5r. No Task/Activity Percentage Of work done L Excavation o0% 2 ONE number of plinth o0% NA number of Podiums NA + 5I|tr Ftoor NA 5 FIVE N umber oJ Slabs Of Super Structure 00% Internal Walls ,lnternal Plaster, Floorings Within Flats /Premises, 00% Doors and Windows to each of the Flat /Premises 7 Sanitary Fittings Within the Flat/Premises; Electrical Fittings Within 0Oo/o the Flat/Premises 8 Staircases, Lifts Wells and Lobbies at each Floor level o0% connecting staircases and Lifts, Overhead and Underground Water tanKs 9 The external plumbing and external Plaster, Elevation, completion of oo% terraces with waterproofing of the building /wings, 10 Installation of Lifts,Water pump and o0% Electrical Fittings to Common areas, Finishing to entrance Lobby/s, plinth Protection, Paving of areas appurtenant to Building, Compound wail and all other requirements as may be required to obtain Occupation / Completion Certificate Table B lnternal & External Development Works ln resoect of the entire Reqistered Phase Sr.No Common areas and Proposed Percentage Of Work Details Facilities, Amenities (Yes/No) Done 7. lnternal Roads and NO NA NA 2. Water Supply YES oo% BOAR 3. YES o0% (chamber, Lines, (chambet Lines, seplrc ra nK, Septic Tank) Storm Water NO NA NA Drains Tree Planting YES NA NA 6. Street Lighting NO NA NA 7" Community NO NA NA Buildings 8. Treatment and NO NA NA Disposal of Sewage and Sullage water Solid Waste NO NA NA .Management & Disposal 10. Water YES 00% NA Conservation, Rain water harvesting LL. Energy NO NA NA Management 72. Fire Protection YES 00% NA And Fire safety Requirements _!5. Electrical meter NO NA NA room,5u0-5taUon, Receiving station !4. Ithers (O ption to NO NA NA Add more) Yours Faithfully AR. HRISHIKESH PAWAR (License No:- CA/97 /2t8501