/n*..*.YoGEsH trnrKW,.D @ /\R. snTlsH tr/\lKW/\E MS in Construction.(USA), B.Arch, IIA B.Arch, AIIA Construction Manager Architect Architect, Interior Designer Lisioning Consultant +91-958944,4777 +91-9373900813 +91-9405355650 +91-9545003813 tr/\IKW/\B n 550trlnTE5 REF: DATE: Annexure A FORM 1 [see Regulation 3] ARCH ITECT'S CERTIFICATE (To be submitted at the time of Registration of Ongoing Project and for withdrawal of Money from Designated Account) oate:3of o6f tolrr To, TEZVED BUILDCON LLP NASHIK, MAHARASHTRA, 422003 Subject : Certificate of percentage of Work of completion of construction work of TRUKONS BUSINESS PARK having MahaRERA Registration Number P51600023208 (Only Applicable after project Registartion) being developed byTEZVED BUILDCON LLP Sir, lAlVe YOGESH GAIKAWAD have undertaken assignment as Architect /Licensed Surveyor of certifying Percentage of completion of Construction Work of TRUKONS BUSINESS PARK having MahaRERA Registration Number P51600023208 (Only Applicable after project Registration, being developed by TEZVED BUILDCON LLP ) Based on Site lnspection,with respect to Layout / each of the Building/Wing of the aforesaid Real Estate Project I certify that as on the date of this certificate, the Percentage of Work done for each of the building/Wing of the Real Estate Project under MahaRERA is as per Table A herein below. The percentage of the work executed with respect to each of the activity of the entire phase is detailed in Table B. Table A ld Number: TRUKONS BUSINESS PARI(NA Sr. No. Tasks/Activity Percentage of Actual Work Done (As on date of the CertificaJe) (1) QI (3) 1 Excavation '100,00 2 Basements (if any) 100.00 3 Podiums (if any) 100.00 4 P nth '100.00 5 Stilt Floor 100.00 6 Slabs of Suoer Structure 76.00 7 lnternal walls, Internal plaster, Floorings, Floors and windows wit ,* 5.oo Flats/Premises - ^Jllt B Sanitary Fittinq within the FlaVPremises a5 t- gt rv6si5 wwrM.g atkwadassociates. ' Email:gaikwadassocrptgs".qrgmail.com, Ph.0253-20t)5i36590 Address: A-302, Third Floor, Prathamesh Plaza, Above Sony Paithani, Racca Colony, Sharanpur Road, Nashik-5 Sr. No. Tasks/Activity Percentage of Actual Work Done /Ac nn dalo af lho (loriifinatol v rcases, lifts Wells and Lobbies at each Floor level Overhead and 62.00 10 External plumbing and external plaster, elevation, completion of terraces with 0.00 wateroroofinq of the Buildinqiwino. 11 lnstallation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per 0.00 CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions of environment/CRZ NOC, Finishing to entrance lobby/s, plinth protection,paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. Anv other activities. cA/200s/36580 Page 2 of3 / Table B 'Gommon A.rea.s (lnternal and External Devetopment Works) in respect of Registered Phase / Project Number) Sr,No Common areas and facilities ls Available Percentage of Actual Details (Yes / No) Work Done (As on date of the Certificate) (1) (21 (3) (4) (5) I Internal Roads & Footpaths No 0.00 NA 2 Water Supply Yes 000 PROVIDED BY NMC 3 Sewerage (Chamber, Lines, Septic Tank , STp) Yes '10.00 AS PER PLAN COPY ONLY CHAMBER 4 Storm Water Drains Yes 0.00 AS PER PLAN COPY 5 Landscaping & Tree Planting Yes 0.00 AS PER PLAN COPY 6 Street Lightirlg No 0,00 NA 7 Community Buildings No 0.00 NA 8 Treatment And Disposal Of Sewage And Sullaqe Water No 0.00 NA I Solid Waste Manaoement And Disoosal No 0.00 NA 10 Water conservation /Rain water harvesting Yes 0.00 AS PER PLAN COPY 11 Energy managemcnt No 0.00 NA 12 Fire protection and fire safety requirements No 0.00 NA 13 Electrical meter room, sub-station, receiving station Yes 0.00 AS PER PLAN COPY 14 Aggregate area of recreational Ooen Soace No 0.00 NA 15 Open Parking No 0.00 NA Yours Fai Ar.Yogish Gailorad YOGESH GAIKAWAD Signature & Name (lN BLOCK LETTERS) of L.S/ Architect ( License No: CA/2005/36580) Date of Certificate: Agreed and accepted by: Signature of Promoter Name: TEZVED BUILDCON LLp Date: Jo, e,z_f Page 3 of 3